The Commercial Air Compressor (500 Ltrs) supplied by us in the market, is widely acclaimed for its superior sturdiness, durability, performance, and functional life. These are owed to the finest raw materials and modern technology applied in its making. Further, its market leading pricing, makes it highly acclaimed and asked for.


  • Low energy consumption
  • Superior performance
  • High strength


  • 10 HP TC 1000 Air Compressor with all fittings star delta starter
  • 500 Ltrs Heavy Tank with Delivery unloader valve