In order to provide maximum satisfaction to our clients, we engage in the utilization of high grade raw materials and modern machines, for making this range of Heavy Duty Air Compressor. Owing to this, the product is known to have a longer functional life, strength and an impeccable performance. In addition, our abidance of the set industry norms, ensure its quality.


  • Superior performance
  • Longer service life
  • Unmatched precision


  • 3.0 HP TC 300 Air Compressor with 3.0 H.P