With its precise engineering and compact design, the offered range of High Pressure Air Compressor (500 Ltrs) is known to be amongst the finest that are available in the market. Suppliers of this range is done in compliance with the set industry norms and guidelines, utilizing the finest raw materials and modern machinery. Owing to this, the product’s functionality and functional life, is widely acclaimed.


  • Impeccable functionality
  • Easy to maintain
  • Commendable functional life


  • 10 HP TC 1000 Air Compressor with all fittings star delta starter, 500 Ltrs heavy tank with delivery unloader valve