Two primary objectives are applied in the manufacture of this range of industrially rated screw compressors; namely longevity and reliability.
From these two basic concepts everything else follows; slow rotational speeds, oversized air ends, robust and rigid frames and cabinets, highest quality Siemens electrical components are combined with larger and higher efficiency coolers, separators and air ends to achieve a rotary screw air compressor product which stands proud above our competitors.
Oil Injected Rotary Screw Air Compressors:
Features:
- High Efficiency Air End
- Heavy Duty
- Generously Dimension-ed Air and Oil Coolers
- Triple Separation Principle
- Advanced Suction Valve
- Heavy Duty Air Filter
- Special Synthetic Coolant
- Intelligent PLC Controller
- Ranges from 7.5KW up to 355KW
- Fixed and variable speed options
Oil Free Rotary Screw Air Compressors*
Features:
- Class O certified OIL-FREE Air
- Two stage GHH Oil-Free Air End
- Heavy Duty
- Advanced Suction Valve
- Heavy Duty Air Filter
- Intelligent PLC Controller
- Ranges from 45KW up to 315KW
- Fixed and speed controlled options