Atlas copco,ELGI,KAESER Ingersoll rand ,Used Screw air compressor for sale 5hp to 125hp Screw Compressor Rental Reciprocating air compressor rental/hire  in Hyderabad Telangana and Andhra Pradesh   screw compressor spares dealer Air compressor  service,

ATLAS COPCO-Electric Screw Air Compressors On Rental:


  • Maintenance free drive system
  • Oil filter
  • After cooler with integrated water separator
  • Electronic water drains
  • Electrical cubicle cooling booster
  • Oil separator
  • Inlet valve & Inlet filter


  • Technology from the world leader
  • Reliable, Industrial design.
  • Meets and surprises current world standards
  • Complete compressed air station
  • Compact, easy to-install, ready-to-run
  • Continuous full load operation capability
  • Energy saving controls
  • Quiet operation


Horizon Electric Powered Screw Air Compressor:

A Breakthrough in Engineering Excellence:

  • Energy Efficient
  • Efficient Transmission
  • Superior Air Quality
  • Bulk Water Free
  • Compact
  • User-Friendly
  • Durable & Reliable
  • Safety & Interlocks

HORIZON Series Compressors are tropicalised to perform at high ambient temperatures – from hot summer to cold winter and fro dry to extremely humid conditions. Each package is crafted to the highest standards. All this, in a sleek, elegant, compact design that saves valuable shop floor space.

  • Micro controller based control unit
  • Compatible and user-friendly
  • Simple alpha – numerical screen
  • Scroll button to monitor operating parameters
  • Read outs of pressure and temperature
  • On-demand read outs of all operating and maintenance conditions
  • Safety shutdowns
  • Power failure auto re-start
  • Dual control

The Horizon models are built with maximum safety built-in tripping / warnings to ensure trouble free operation with micro controller option.

Trip provisions:

  • Emergency stop
  • Main motor over loading
  • Cooler motor over looking
  • High discharge air-oil temperature

Warning Signals:

  • Separator element replacement
  • Oil filter replacement

Custom made solid state MIMIC electronic annunciation panel gives fault indication for easy maintenance.