Air compressors are available in many types With us, which are designed to meet set of requirements. Each of the type of air compressor may be different in cooling method, lubrication, compression stages and power source.

Following are the three main types of air compressors:

Reciprocating (Piston) Air Compressor:

Reciprocating air compressor makes use of piston to compress air. Based on the number of compression stages, reciprocating type can be a single-stage or double-stage. In single-stage, only one piston is used to compress air, whereas in double-stage compressor, there are 2 pistons for air compression.

Rotary Air Compressor:

This type is similar to the positive displacement configuration of a reciprocating compressor. In rotary type, two spinning mated screws are used rather than piston(s). As the screws spin towards each other, air is compressed and pushed inside a storage tank.

Centrifugal Air Compressor:

This type of air compressor or dynamic compressor is applicable when the demand for compress air is very high. In this air compressor, a very high speed rotating impeller increases velocity of air, which is directed towards a diffuser which converts the velocity of air into making pressure. Centrifugal air compressor requires more energy to operate than the other two air compressors.

Ever since our establishment, we are engaged in supplying a wide range of Air Compressor and Spares. Our product includes Water Cooled Air Compressor, Single Stage Compressor, Replacement Parts and Lubricated Compressor. Owing to the demand of our clients, we also offer High Pressure Air Package, Heavy Duty Water Cooled Compressor, Air Compressor Packages and Air Compressor. Our products are using quality material, which we procure from our reputed vendors of the market.

The highlighting features of our range are as follows:

  • Durability
  • Optimum performance
  • Robust construction
  • Low maintenance
  • Low power consumption
  • Longer service life


  • Global Series (E11-E22 kW)
  •  Single Stage Compressors ( 11-75 kW )
  •  Single -Stage Compressors ( 90kW – 250kW)
  •  Tank Mounted Screw Air Compressor
  •  Two- Stage Energy Efficient Tandem Compressor (75 kW – 160kW)


  • Electric Powered Screw Air Compressor
  •  Portable Single-Stage High Pressure Compressor

Reciprocating Air Compressors:

  • Horizon Series Reciprocating Air Compressors
  • Engine Driven Reciprocating Air Compressor
  • Single Stage (SS) / Two Stage (TS) Horizon Series
  • High Pressure / Volume Reciprocating Air compressors
  • High Volume Tank Mounted Compressors
  • High Pressure Reciprocating Air Compressor
  • Bare Compressor Pumps (Top blocks)
  • LG Series Reciprocating Air Compressors