• CPT 140 Tractor Mounted
  • CPS 160 S
  • CPS 180
  • CPS 260
  • CPS 300
  • CPS 300 EP
  • CPS 325
  • CPS 325 EP
  • CPS 325 HP
  • CPS 370
  • CPS 400
  • CPS 450 HP
  • CPS 600
  • CPS 1100-300

CPT 140:

CPT 140 – Tractor Mounted Compressor:

Air Compressor Element for Tractor Mounting

Chicago Pneumatic compressors are world famous for the for their compactness, reliability and economical running. Compressor element which when mounted on a tractor provides air power when mounted on a tractor provides air power wherever it is needed. When not required it can be easily removed and the tractor can be used for other work.

The self-contained Chicago Pneumatic Tractor Mounted Compressor can be mounted on Tractors of 40 or more HP. It is powerful enough to drill horizontal holes. It can also operate extra equipment such as flushing pump for well.

Application Areas :

  • Well drilling
  • Deepening of open wells
  • Revitalization of open
  • Road maintenance
  • Rock blasting in quarries and mines

Specifications:

NORMAL WORKING PRESSURE7.00 KG/CM2 (100 PSIG)
Normal and maximum operating speed on load1460 rpm
Free air delivery140 cfm
Power required at compressor shaft at full load and maximum speed (approx.)36.5 hp
Lubricating Oil Sump Capacity – Compressor5 litres
Net weight (approx)600 kgs
Speed of tractor power-off665 rpm

CPS 160s:

CPS 160 S is an innovative oil injected silenced rotary screw compressor

This single axle compressor is powered by Mahindra & Mahindra Diesel Engine to provide compressed air to pneumatic tools such as Rock Drills, Demolition Tools, Chipping Hammers, Rammpers/Tampers. Impact Wrenches, Grinding Tools & for Sand Blasting too. This compressor is compact and silenced and therefore ideally suited for operation on busy city roads for pot-hole management and other similar jobs.

Features :

  • World Class Air End – Low rotor speed, few moving parts & efficient design of compressor minimizes wear & tear, ensuring reliability and long working life.
  • Clean Intake Air – The single high performance two-stage air intake filter prevents dust & dirt particles from entering the compressor & engine. A service indicator on the filter tells you that it needs maintenance & replacement.
  • Ease of Operation – All the controls are grouped on a single panel for easy monitoring, safety and fool-proof operation.
  • Easy Access – The canopy doors open outwards providing easy access to the machine. With doors up and out of the way, routine maintenance can be performed in less time.
  • Operating Economy – You can count on economical fuel consumption and continuous airflow at stable pressure as it’s fully automated step less control constantly adapts the compressor output to air demand.
  • Environment Friendly – Efficient noise dampening canopy ensures the compressor operates quietly making it most suitable for operation in roads for cities.

Technical Specifications – Compressor :

CAPACITY FAD4.12 M3/MIN
Normal Working7
Pressure2 kg/cm
Speed-Full Load2700 rpm
Speed – No Load1400 rpm
Oil System Capacity11 litre

Technical Specifications – Engine :

MAKEMAHINDRA & MAHINDRA
ModelMDI 1895 B
No. of CylindersThree
Oil Sump Capacity5.5 litres
Fuel Tank Capacity37 litres
Starting Voltage12 V
Speed of tractor power-off665 rpm

CPS 180:

CPS 180 is an innovative oil injected rotary screw compressor:

This single axle compressor is powered by Simpsons Diesel Engine to provide compressed air to pneumatic tools such as Rock Drills, Demolition Tools, Chipping Hammers, Rammpers/Tampers. Impact Wrenches, Grinding Tools & for Sand Blasting too.

Features:

  • World Class Air End– Low rotor speed, few moving parts & efficient design of compressor minimizes wear & tear, ensuring reliability and long working life.
  • Clean Intake Air – The single high performance two-stage air intake filter prevents dust & dirt particles from entering the compressor & engine. A service indicator on the filter tells you that it needs maintenance & replacement.
  • Ease of Operation – All the controls are grouped on a single panel for easy monitoring, safety and fool-proof operation.
  • Easy Access– The canopy doors open outwards providing easy access to the machine. With doors up and out of the way, routine maintenance can be performed in less time.
  • Operating Economy– You can count on economical fuel consumption and continuous airflow at stable pressure as it’s fully automated step less control constantly adapts the compressor output to air demand.

Technical Specifications:

CPS 180
FAD (m3/min)5.22
Operating Pressure (kg/cm2g)7.0
L (mm)3690
W (mm)1735
H (mm)1655
Oil Tank Capacity (l)32
Fuel Tank Capacity (l)120
Dry Weight (kg)1230
Engine makeSimpsons
Engine ModelS 433
No. of cylinders4
Engine Full Load Speed (rpm)2300
Starting Voltage12

CPs 325 hp:

CPS 325 HP is an innovative oil injected rotary screw compressor:

This single axle compressor is powered by Ashok Leyland Diesel Engine to provide compressed air to pneumatic tools such as Rock Drills, Demolition Tools, Chipping Hammers, Rammpers/Tampers. Impact Wrenches, Grinding Tools & for Sand Blasting too.

Features:

  • World Class Air End – Low rotor speed, few moving parts & efficient design of compressor minimizes wear & tear, ensuring reliability and long working life.
  • Clean Intake Air – The single high performance two-stage air intake filter prevents dust & dirt particles from entering the compressor & engine. A service indicator on the filter tells you that it needs maintenance & replacement.
  • Ease of Operation – All the controls are grouped on a single panel for easy monitoring, safety and fool-proof operation.
  • Easy Access – The canopy doors open outwards providing easy access to the machine. With doors up and out of the way, routine maintenance can be performed in less time.
  • Operating Economy – You can count on economical fuel consumption and continuous airflow at stable pressure as it’s fully automated step less control constantly adapts the compressor output to air demand.

Technical Specifications:

CPS 325 HP
FAD (m3/min)8.28
Operating Pressure (kg/cm2g)10.5
L (mm)3690
W (mm)1735
H (mm)1655
Oil Tank Capacity (l)32
Fuel Tank Capacity (l)120
Dry Weight (kg)1570
Engine makeAshok Leyland Hino
Engine ModelW04 CT
No. of cylinders4
Engine Full Load Speed (rpm)2600
Starting Voltage12

Cps 450 hP:

The features you have always wanted:

  • World Class Air End – Low rotor speed, few moving parts & efficient design of compressor minimizes wear & tear, ensuring reliability and long working life.
  • Clean Intake Air – The single high performance two-stage air intake filter prevents dust & dirt particles from entering the compressor & engine. A service indicator on the filter tells you that it needs maintenance & replacement.
  • Ease of Operation – All the controls are grouped on a single panel for easy monitoring, safety and fool-proof operation.
  • Easy Access – The canopy doors open outwards providing easy access to the machine. With doors up and out of the way, routine maintenance can be performed in less time.
  • Operating Economy – You can count on economical fuel consumption and continuous airflow at stable pressure as it’s fully automated step less control constantly adapts the compressor output to air demand. Its Euro compliant fuel efficient engines offer best operating economy.
  • Optimum Cooling – Suitably sized heat ex changers and an exhaust chamber with exhaust directed upwards ensure low operating temperatures.
  • Sturdy Under Carriage – Well balanced chassis and sturdy tow bar are designed to be stable at high towing speeds.

 

Technical Specifications:

MODELCPS 450 HP
FAD (m3/min)12.6
Operating Pressure (kg/cm2g10.5
Tank Capacity (oil)34
Tank Capacity (fuel)242
Dry Weight (kg)2140
Engine MakeCummins
Engine Model6BTA 5.9C
No. of Cylinders6
Engine Full Load Speed (rpm)2100
Starting Voltage24

CPS 1100-300:

High Pressure Compressors for Water well Drilling:

Two stage, oil injected, twin screw element compressor.Directly coupled to the state of the art water cooled diesel engine through a flexible coupling.Enclosed in sturdy canopy.Frame of the compressor is sturdy and can fit any medium size truck.

Features: Instrument Panel:

  •  Discharge pressure gauge.
  •  Discharge temperature gauge
  •  Engine oil pressure gauge
  •  Engine water temperature gauge
  •  Tachometer
  •   Hour meter

Safety Features:

  • High air temperature shut down
  • Low engine oil pressure shut down
  • High engine water temperature shut down
  • Safety valve on separator tank

 

Technical Specifications:

MODEL CPS 1100-300
FAD (m3/min)31
FAD (cfm)1100
Operating Pressure (kg/cm2g)21
Tank Capacity (fuel)72
Dry Weight (kg)4300
Engine MakeCummins
Engine ModelNTA 855C 430 BIGCAM III
No. of Cylinders6
Engine Full Load Speed (rpm)1800
Engine Unloaded Speed (rpm)1200
Starting Voltage24