Atlas Copco’s Size 2 LP portable air compressors are small and light weight, allowing your operators to move to the next work point easily and quickly without the need for supplementary moving equipment. Driven by a Caterpillar engine, they are ideal for sandblasting and drilling, and for your other applications where mobility, maneuverability, performance and reliability are key requirements. All models are available in versions that meet the latest exhaust emission and noise directive criteria.

Customer Benefits:

  • Excellent fuel economy – With the Caterpillar engine management system you get the best fuel economy in class.
  • Low Total Cost of Ownership – You can achieve even lower fuel consumption with the addition of the innovative FuelXpert™ system, which electronically regulates engine speed and the air inlet valve to optimize fuel consumption.
  • Highly reliable for many years of troublefree operation.
  • Easy to transport and maneuver on site thanks to their small dimensions and light weight.
  • Safe for your operators and for the environment.
  • Low noise and exhaust emissions – Size 2 LP compressors satisfy international standards and can operate in the vicinity of hospitals, schools, and residential areas, even at night.

Single Axle 7-12 bar:

Single axle, oil-injected, rotary screw portable compressors, 7-12 bar (102-175 psig)

Powered by Honda, Kubota or Deutz diesel engines, Atlas Copco’s Series 7 portable compressors are compact, efficient, economical and easy to operate. They give you a reliable source of compressed air to drive your pneumatic tools, as well as your high free air delivery applications such as sandblasting. For certain models an optional integrated 6.5 or 12 kVA generator provides additional power for welding, lighting, heating, site instruments and power tools. All Series 7 models comply with current regulations concerning safety, exhaust emissions and noise.

TECHNICAL SPECIFICATIONS
Normal effective working pressure7-12 bar
Air flow (FAD) 32-89 i/s
Air flow (FAD)1,9 – 5,3 m³/min
Sound power level98 dB(A)
EngineDeutz D2011L02, Deutz D2011L03, Kubota D905, Kubota 1105
Weight530 – 940 kg
Length2559 – 3470 mm
Width1305 – 1410 mm
Height1151 – 1258 mm

 

Single Axle 7-14 bar:

Single axle, oil-injected, rotary screw portable compressors, 7-14 bar (101-204 psig)

Atlas Copco’s Size 1 portable compressors are specially designed for heavy-duty, harsh environments. They are totally at home in the renovation industry and quarries, are ideal for sandblasting applications, and operate reliably at high altitudes and extremes of temperature. Powered by an ultra-efficient 4-cylinder Kubota engine, Size 1 compressors give you a reliable source of compressed air for your applications, or for combinations of your pneumatic tools such as rock drills and hammers. All models meet the latest exhaust emission and noise directive criteria.

TECHNICAL SPECIFICATIONS
Normal effective working pressure7-14 bar
Air flow (FAD)151-185 i/s
Air flow (FAD)9,1 – 11,1 m³/min
Sound power level71-99 dB(A)
EngineKubota
Weight
1705 – 1883 kg
Length394.1 – 435.6 cm
Width170.1cm
Height161.1 cm

Single axle 8.6-14 bar:

Single axle, oil-injected, asymmetrical rotary screw portable compressors, 8.6-14 bar (125-200 psig)

Atlas Copco’s Deutz powered Size 1.5 portable compressors are designed to give you reliability and a fast return on investment. They are suitable for applications as diverse as the installation of fiber optic cables, abrasive blasting, small hole drilling and general construction work. All models are available in versions that meet the latest exhaust emission and noise directive criteria.

TECHNICAL SPECIFICATIONS
Normal effective working pressure8,6 – 12 bar
Air flow (FAD)236 – 285 l/s
Air flow (FAD)14,2 – 17,1 m³/min
Sound power level99 dB(A)
EngineDEUTZ
Weight3000 kg
Length507 – 550,8 cm
Width198,8 cm
Height209,4 cm

Two-Stage 25-35 bar:

two-stage, oil-injected, asymmetrical rotary screw compressors, 25-35 bar (365-510 psig)

At Atlas Copco we understand your requirements in the tough world of industrial drilling, where reliability and easy maintenance are as essential as high-pressure air. Our DrillAir™ portable compressors deliver high capacity, high pressure effectively, reliably and cost-efficiently. You can further enhance their fuel consumption with the innovative FuelXpert™ system, while Oiltronix™ technology enables the components to last longer. Powered by heavy-duty Caterpillar engines, DrillAir™ compressors allow you to drill deeper and larger holes at the fastest penetration rates and with the highest productivity. All models are available in versions that meet the latest exhaust emission and noise directive criteria.

TECHNICAL SPECIFICATIONS
Normal effective working pressure25 – 35 bar
Air flow (FAD)550 – 630 l/s
Air flow (FAD)33 – 37,8 m³/min
Sound power level104 dB(A)
Engine Caterpillar C18 ACERT T3
Weight7200 – 10100 kg
Length5,4 – 6,8 m
Width2,25 – 2,53 m
Height2,51 – 3,05 m

Oil Injected 7-25 bar:

oil-injected, rotary screw portable compressors, 7-25 bar (100-365 psig)

Atlas Copco’s Size 2 portable compressors meet your needs for high volume air at medium pressure. Booster manufacturers find them invaluable as source air compressors and they have become indispensable machines for rental companies. Powered by reliable Caterpillar diesel engines, Size 2 compressors are suitable for all your demanding applications such as heavy-duty drilling, quarrying, shallow water well drilling, deep-hole drilling and large diameter pipeline cleaning. All models are available in versions that meet the latest exhaust emission and noise directive criteria

TECHNICAL SPECIFICATIONS
Normal effective working pressure7-12 bar
Air flow (FAD) 32-89 i/s
Air flow (FAD) 1,9 – 5,3 m³/min
Sound power level98 dB(A)
EngineDeutz D2011L02, Deutz D2011L03, Kubota D905, Kubota 1105
Weight530 – 940 kg
Length2559 – 3470 mm
Width1305 – 1410 mm
Height1151 – 1258 mm

Single Axis:

Single axle, oil-injected, rotary screw portable compressors, 8.6-14 bar (125-200 psig)

Atlas Copco’s Size 2 LP portable air compressors are small and light weight, allowing your operators to move to the next work point easily and quickly without the need for supplementary moving equipment. Driven by a Caterpillar engine, they are ideal for sandblasting and drilling, and for your other applications where mobility, maneuverability, performance and reliability are key requirements. All models are available in versions that meet the latest exhaust emission and noise directive criteria.

TECHNICAL SPECIFICATIONS
Normal effective working pressure8,6 – 14 bar
Air flow (FAD)310 – 400 l/s
Air flow (FAD)18,6 – 24 m³/min
Sound power level76 – 100 dB(A)
EngineCaterpillar
Weight3400 kg
Length507 – 550,8 cm
Width198,8 cm
Height209,2 – 209,4 cm

Oil Injected:

Single axle, oil-injected, rotary screw portable compressors, 7-12 bar (102-175 psig)

Powered by Honda, Kubota or Deutz diesel engines, Atlas Copco’s Series 7 portable compressors are compact, efficient, economical and easy to operate. They give you a reliable source of compressed air to drive your pneumatic tools, as well as your high free air delivery applications such as sandblasting. For certain models an optional integrated 6.5 or 12 kVA generator provides additional power for welding, lighting, heating, site instruments and power tools. All Series 7 models comply with current regulations concerning safety, exhaust emissions and noise.

TECHNICAL SPECIFICATIONS
Normal effective working pressure12 – 25 bar
Air flow (FAD)936 – 1058 l/s
Air flow (FAD)56,2 – 63,5 m³/min
EngineCaterpillar C13 ACERT
Weight14500 – 15000 kg