37-45 kW / 50-60 hp rotary air compressors | 55-75kW / 75-100 hp rotary screw air compressors | 90-160kW / 125-200hp rotary air compressors | 37-75kW / 50-100 HP Total Air System Rotary Screw Air Compressors
Ingersoll Rand’s medium-range contact-cooled rotary screw air compressors offer time-proven reliability and advanced features to ensure the highest levels of reliability, efficiency and productivity for your operation. With their legendary reliability Ingersoll Rand R-Series compressors are the backbone of thousands of operations around the world.
Ingersoll Rand contact cooled rotary screw air compressors offer the very best of time-proven designs and technologies with new, advanced features that ensure the highest levels of reliability, efficiency and productivity available.
At Ingersoll Rand, we not only provide world-class products and support, but the peace of mind that comes from our commitment to stand behind our customers in all aspects of what we do. That peace of mind allows our customers to focus on their primary objective—moving their business forward.
37-45KW / 50-60HP:
A rugged and reliable air compressor is what most people desire. If this is your priority then look no further than Ingersoll Rand’s 37-45kW/50-60hp rotary air compressors. With time proven, integral gear drive Intellisys control system, and long life Ultra Coolant, the Innersole Rand, single stage, contact cooled rotary compressor is the one that you can count on for years to come.
37-45KW / 50-60HP VSD:
Matching a standard variable speed inverter with premium efficiency Hybrid Permanent Magnet(HPM) MOTOR; directly coupled to a time-proven air end, Nirvana represents a stunning advance in compressor technology. This rotary compressor provides unparalleled energy efficiency at all speeds and offers superb reliability. There are no motor bearings, gears, pulleys, belts, couplings or motor shaft seals to wear, leak or need replacing. In addition, there is nothing to get out of alignment. Nirvana will lower your operating costs with its dynamic efficiency. It offers truly transcendent technology.