Efficient two-stage air intake filters • Lesser noise • High motor efficiency • Reduced power consumption • Fewer emissions • Powered by a three phase, TEFC squirrel cage motor with ‘F’ class insulation. SEPARATOR ELEMENT • HIGH SUMP PRESSURE ft HIGH DISCHARGE TEMP • MAIN MOTOR OVERLOAD • REVERSE ROTATION MIMIC Panel Custom made solid state MIMIC electronic annunciation panel gives fault indication for easy maintenance. electric powered screw air compressor has set a new standard in portable compressor performance. It is designed to withstand extremes of temperatures, dust, grime and…

  • Electric Air Compressor Rental 5hp to125 hp air compressor low and high Pressure 7kg/cm2  to 32 kg/cm2
  • Electric Air Compressors Ranging from 1 HP to 250 HP Pressure 7 KG/CM2 TO 12 KG/CM2
  • Electric High Pressure Air Compressors Ranging from 1 HP to 30 HP Pressure 7 KG/CM2 TO 40 KG/CM2

High Pressure Compressors:

Electric High Pressure Air Compressors Ranging from 1 HP to 30 HP Pressure 7 KG/CM2 TO 40 KG/CM2