• Range: 300 – 600 cfm at 100 – 200 psig
  • Skid mounted compressors 450 – 1400 cfm at 150-350 psig for water well and foundation drilling
  • Compressors of higher volume and pressure are also available on request.

Features & Benefits:

  • Closed door operation – better life of internal components
  • Single axial running gear for better manoeuvrability and off road towing.
  • High ambient temperature capability.
  • Air glide unloader regulation system,
  • Easy access for servicing of internal components conveniently.
  • Instrument & control panel.
  • Auto blow down valve, safety valve, air filter maintenance indicator for engine and compressor.
  • Guaranteed pressure and flow at discharge point.
  • External single point lifting bail.
  • Two stage heavy duty dry type replaceable air filter element, Spin-on replaceable compressor oil filter element and three stage heavy duty air/oil separation system.
  • Running gear tested and certified for rough terrain travel up to 35 KMPH.
  • Automatic shut down for
    • High discharge air temperature.
    • Low engine oil pressure.
    • High engine water cylinder head temperature
  • Sleek tailor-made, anti-corrosive painted canopy for longer life.