Reciprocating Lube & Non Lube Vertical Compressors:
We offer complete range of reciprocating Air Compressors Ingersoll Rand, Vertical Series ESV, Lube & Non Lube Package comprising of compressors, motor, After cooler, Complete System, Skid Mounted
- 3 HP Single-Stage Air Compressor (135 Max PSI, 10.3 CFM)
- 5 HP Single-Stage Air Compressor (135 Max PSI, 15.5 CFM)
- 5 HP Two-Stage Air Compressor (175 Max PSI, 14 CFM)
- 5 HP Two-Stage Air Compressor (175 Max PSI, 14 CFM)
- 15 HP Two-Stage Air Compressor (175 Max PSI, 50 CFM)
- 10 HP Two-Stage Air Compressor (Horizontal, 175 Max PSI, 35 CFM)
- Oil-injected Screw Compressor
- Belt Driven
- Direct Driven
- Variable Speed Screw Compressor
- Permanent Magnet Compressor
- Portable Screw Compressor
- Oil Free Screw Compressor
- Low Pressure Screw Compressor
- Pressure Booster
- Medium & High Pressure
- Piston Air compressor
- Post-processing equipment’s
Supplying a wide range of industrial compressors has been one among st the primary specializations undertaken by us. These products are widely applied in various industrial sectors and construction sites and are well-known for their efficiency, high performance, quality and reliability
Industrial Compressors:
Types
- Portable Compressors
- Two Stage Compressors
- Oil Free Compressors
- Piston Compressors
- Screw Compressors
- Single Stage Compressors
- Tank Mounted Screw Compressors