Soundproof Enclosure For Air Compressors
Technical Specification Of Acoustic Enclosure
CONSTRUCTION: –
The Acoustic Enclosure is modular, cap on type (without base) & Noise shielding construction, the panel construction can be dismantled, relocated to another area and re-erected.
OUTER ENVELOP:-
The modular panel construction consists of 1.6/2 mm CRCA sheet laminated outside & GI perforated sheet of 24swg thick inside. The acoustic material filled between both the sheets of 75 mm thickness, offers the advantages of high shielding performance & durability. Structural steel support is designed and installed according to the enclosure size.
BASE FRAME: –
Base frame is made out of 3.15mm CRCA Sheet Fabricated
AIR VENTILATION: –
Forced air ventilation system is engineered to provide sufficient airflow for heat removal as required as per DG Rating.
COATING: –
Epoxy paint / P.U. paint/ Powder coated as per requirement after 9 tank treatment.
HINGES: –
Heavy duty SS hinge
LOCK: –
Heavy duty, spring loaded lock in brass body