High & Low Pressure Air Compressors:
Most 2 stage reciprocating compressors are designed to operate up to a maximum of 175 psi. Most rotary screw compressors are designed to operate efficiently between 90 and 125 psi. Some applications require high volumes of compressed air in the range of 45 to 60 psi. A rotary screw compressor designed for operation in this range will use a smaller motor and consume less power than a machine designed for operation at a higher pressure. Special construction is required for satisfactory operation in this range. Some applications require compressed air at 200 psi but are constrained by space, noise or cost considerations to use a modified rotary screw compressor rather than a reciprocating compressor . High pressure reciprocating compressors having 3, 4 or 5 stages capable of reaching pressures from 300 to 5000 psi are found in industrial settings, drilling rigs, diving operations, fire stations and more.
High Pressure Direct Drive Rotary Screw Compressors:
Simplicity of design and durability of components assures a long service life for our high pressure direct drive rotary screw air compressors.
- 200 PSI Operation
- Fewer but larger bearings
- Slower operating speeds
- Lower noise levels
- 50 to 100 HP Units available
Single Stage Air Cooled Reciprocating Compressors:
Cal Supply’s single stage air cooled reciprocating compressors are ideal for small industrial plants, schools, small automotive centres and do-it-yourselves.
- 30 to 100 PSI Pressure range
- Option of horizontal or vertical receivers
- Also available as base mounted units
- 1/2 to 10 HP Units available
High Pressure Double Acting Water Cooled Reciprocating Compressors:
Cal’s high pressure, double acting, water cooled, 3 and 4 stage reciprocating compressors have a long and proven history of efficient performance in many applications.
- 150 to 500 PSI Pressure range
- Full-flow water cooled design
- Internal sealed distance piece to prevent corrosion
- Complete water jacketing for uniform cooling
- 75 to 400 HP Units available
High Pressure Single Acting Water Cooled Reciprocating Compressors:
Designed for continuous duty, Cal’s high pressure water cooled reciprocating compressors provide complete dependability and optimum performance.
- 300 to 1000 PSI Pressure range
- Positive lubrication oil pump
- Complete water jacketing for uniform cooling
- Positive lubrication oil pump
- 15 to 40 HP Units available
High Pressure Air Cooled Compressors for Circuit Breakers:
The construction of these high pressure air cooled compressors for circuit breakers enables you to operate with low temperatures of compression which leads to a long service life.
- Oil pressure lubrication
- Oil pressure control
- Monitoring switch in case of oil leak
- Small Circuit Breaker Units
- 210 to 500 PSI Pressure range
- 1 to 3 HP Units available
- Large Circuit Breaker Units
- 900 to 5000 PSI Pressure range
- 5 to 50 HP Units available
High Pressure Air Cooled Pressure Lubricated Compressors (Two Stage):
Pressure Lubricated units can operate in conditions where day-to-day service is not available i.e., remote locations, off level operations such as off the road equipment. Great for harsh industrial applications.
- Max 250 PSI Operation
- 1 1/2 to 30 HP Units available
Low Pressure Rotary Screw Compressors:
A rotary screw compressor uses two inter meshed helical rotors (screws) within a precisely machined stater to compress air. As the rotors turn, their helical grooves trap air and seal against the stater wall.The volume of these grooves decreases as the rotors turn and mesh together, compressing the air while moving it to discharge port.
- 45 to 70 PSI Pressure range
- 15 to 60 HP Units available
Low Pressure Air Cooled Reciprocating Compressors (Single Stage):
This line of compressors are two cylinder, pressure lubricated and equipped with a two-groove, 17 inch sheave for belt driven applications.
- 20 to 60 PSI Pressure range
- Integrated fan for maximum cooling
- Oil pressure gauge
- 15 to 30 HP Units available
Low Pressure Oil Free Rotary Claw Compressors (Single Stage):
The Cal positive displacement pressure pumps feature a compact rotary claw design that is air cooled, dry-running and non-contacting.
- 0 to 30 PSI Pressure range
- Maintenance free
- Reduced power requirements
- 7 1/2 to 40 HP Units available
Low Pressure Double Acting Water Cooled Reciprocating Compressors:
Cal’s low pressure, double acting, water cooled, single stage reciprocating compressors have a long and proven history of efficient performance in many applications.
- 15 to 60 PSI Pressure range
- Full-flow water cooled design
- Internal sealed distance piece to prevent corrosion
- 20 to 450 HP Units available
Special Purpose Air Compressors:
Some applications require a special purpose-built air compressor for reasons of performance, features or economy. Some examples are compressors for climate control systems in large buildings, compressors for dry sprinkler systems, 12 volt compressors for tow trucks, compressors to be operated off of a truck’s power take-off, and compressors for utility company circuit breakers.
Some special purpose compressors are available off the shelf. Others can be built to your specifications.