Specifications:

300 cfm air compressor

  • Set up in 1996, Ingersoll Rand quality
  • Good cooling system
  • Top brand
  • oversea service

Quick Details:

Condition: New

Type: Screw

Configuration: Portable

Power Source: Diesel

Lubrication Style: Lubricated

Mute: Yes

Place of Origin: Fujian China (Mainland)

Brand Name:  DOOSAN

Model Number: VHP750

Voltage: 24V

Dimension(L*W*H): 4210mm*2000m*2220mm

Weight: 4000kg

Certification: EPA

Warranty: 1 year or 2000 hours

After-sales Service Provided:\ Overseas service centre available

Name: Portable 300 cfm air compressor

Machine Type: Portable air compressor

Emission Standard: Tier3

Thread rod type: Single stage Twin stage

Manufacturer: Caterpillar

Fuel/Cooling way: diesel/water

Voltage(V): 24V

Engine No: C9

Air Compressor from 1Hp to 60Hp:

  • 1 to 30 cfm air compressors
  • 30to 100 cfm air compressor
  • 100 to 300 cfm air compressors
  • 350 to 450 cfm air compressors
  • 450 to 550 air compressors
  • 550 to 750 air compressors
  • 750 to 1500 cfm air compressors
  • Portable Diesel Air Compressors   250, 335 to 600 CFM at 100 PSIG.
  • Pressure, 450 CFM at 150 PSIG.
  • Pressure 2 kg to 5 kg pressure air compressor
  • 5 kg to 10 kg air compressor 100CFM  To 1300CFM

44 READY TO USE AIR COMPRESSORS:

  • Super power air compressors
  • Standard air compressors on hire
  • Quality air compressors on hire basis
  • We hire air compressors from 50 cfm to 1500 cfm
  • Air compressors rental services
  • Air compressor equipment hiring
  • Air compressor company
  • Trolley mounted air compressors
  • Stationary air compressors
  • Eco friendly air compressors
  • Elgi air compressors
  • Electric start air compressors
  • Electric start portable air compressors
  • Air compressor small
  • Marine diesel air compressors
  • Residential electric air compressors
  • China electric air compressors
  • Stationary air screw air compressors on hire/rent
  • Screw reciprocating air compressors
  • 2 kg to 5 kg pressure air compressor
  • 5 kg to 10 kg air compressor
  • Branded air compressors ATLAS COPCO,IR,ELGI,DOOSAN…ETC
  • Vendors for air compressors
  • Vendors for operation/maintenance/amc/repair of air compressors in Hyderabad and telangana
  • Prime air compressors
  • Electric motor air compressor
  • Erection &commissioning of air compressors
  • Engine compressors
  • Portable Diesel Air Compressors 185 CFM – 48 BHP by Chicago Pneumatic – CPS-185-DD
  • Portable Diesel Air Compressors 375 CFM – 111 BHP by Chicago Pneumatic – CPS-375-PD-2
  • Portable Diesel Air Compressors 750 CFM – 200 BHP by Chicago Pneumatic – CPS-750-CD-3
  • Portable Diesel Air Compressors 88 CFM – 24 BHP by Chicago Pneumatic – CPS-90-KD
  • Reciprocating Air Compressor – 2 HP – Vertical – 26 Gallon – Single Stage Electric Simplex by INGERSOLL-RAND XP 825, air compressor, INGERSOLL-RAND, HP750WCU Air Compressors
  • Atlas copco XA(T,V)S 375 JD6 T3 air compressors 100,150,200 psig
  • XA(T,H)S 37-97 Atlas copco air compressor
  • XA(T,H)S 107-137 air compressor
  • Atlas copco diesel driven XA(T,H,V)S 146-186 air compressor
  • Diesel driven mobile air compressor
  • Air compressor on cheap rental basis
  • Diesel engine air compressors for hire
  • Diesel engine piston air compressors on hire basis
  • Variable compressor on hire basis
  • Atlas copco air comp on hire
  • air compressor atlas copco on rent hire lease
  • Air compressor hire Solution
  • control,screw compressors
  • Select wide range of air compressors
  • Air, Compressor hire rental Service
  • Repair
  • air compressor,
  • Air Compressors in Hyderabad
  • ir compressors in telangana
  • china compressor,
  • local made compressor.