Human design

  • large capacity and high strength transparent oil box for oil level observation
  • plastic wheel cover for clean
  • foot pedal and handle are convenient for checking and repairing
  • wide space for putting repairing tools

Control meter

  • exhaust pressure indicator
  • four-in-one meter: compressor exhaust temperature meter, diesel engine water temperature meter, diesel engine oil pressure meter ,voltmeter

Good cooling system:

  • complete side-by-side cooling system: improve environment adapted temperature,ensure best cooling effect
  • the fan is directly connected on belt pulley of diesel engine, simple and reliable structure

Parameter:

EMISSION STANDARDTIER3TIER3TIER3TIER3TIER3TIER3TIER3
Air Compressor
Thread rod typeSingle stage Single stage Single stage Single stage Single stage Twin stageTwin stage
Air consumption
(m³/min)
21.223.325.5273021.223.3
Rated pressure(bar)13.81210.38.6720.717.2
Fuel capacity(L)550550550550550550550
Engine
ManufactoryCaterpillarCaterpillarCaterpillarCaterpillarCaterpillarCaterpillarCaterpillar
Model NoC9C9C9C9C9C9C9
Cylinder bore*Stroke112*149112*149112*149112*149112*149112*149112*149
Output Volume(L)8.88.88.88.88.88.88.8
Rated speed/idling1800/13501800/13501800/13501800/13501800/13501800/13501800/1350
Rated power(KW)224224224224224224224
Fuel/Cooling waydiesel/waterdiesel/waterdiesel/waterdiesel/waterdiesel/waterdiesel/waterdiesel/water
Voltage(V) 24242424242424
Unit
length(mm)4210 4210 4210 4210 4210 4210 4210
Width(mm) 2000200020002000200020002000
Height(mm)2220222022202220222022202220
Tread(mm)1660 1660 1660 1660 1660 1660 1660
Weight(kg)4000400040004000400040004000