Our  Services:

No matter where you are located, Reddy Compressors ` is committed to serving and providing you with the necessary information with regard to our products and services. Our world-wide network of distributors, certified technicians and engineers are a telephone call away — ready to support you with innovative and cost-effective solutions that will keep your business running at peak performance.

Regardless of the make and model, or technology, of your compressor and whether you require service, parts, repairs or overhauls to your compressor or blower, our compressor service team is happy to work with you on the right solution.

We have the expertise and experience to service many makes and models of compressors, blowers, portable diesel compressors, air dryers and air tools. Brands we service and repair includes but not limited to Atlas Copco, Abac, Boge, Ceccato, Champion, Compair, Cameron, Cooper Joy, Elliot, Elgi, Kaeser, Ingersoll Rand, Ingersoll Rand Centac, Mark, Sullair, Pulford, Bellis & Morcom and Bottarini, just to name a few.

Customer focused and responsive Highly skilled factory trained technicians

Designed for those customers who prefer to procure the materials and perform their own equipment service. Reddy Air Compressor will train facility personnel, provide technical assistance when needed and agrees to be available 24/7 for emergency service. We will also offer parts and preventative maintenance service on a time and material basis.

Emergency Response Service 24X 7:

Reddy Air Compressor Service is available 24 hours a day 7 days a week to support our valued customers. Just call 040-27152661 and ask for service. Every service technician is equipped with a service vehicle fully stocked with parts and analysis tools to resolve most fault conditions.

Our remarkable range of machines with varying capacities are exclusively owned and maintained by us. A motivated teamwork among-st the dynamic office staff, skilled technicians with well equipped workshop, along with our own super vision qualities based on profound academic engineering has earned Reddy Compressors an enviable reputation.

As a matter of policy, we emphasize our conscious decision not to venture into projects favoring the breed of sub standardization in the view of our addiction to quality. Our policy of interactive exchange of views, opinions and suggestions with clients has contributed tremendously towards customer satisfaction.

We deliver the equipment as per the mutual terms agreed and without delay. Machines are well looked after by our operators who are capable of handling daily maintenance and minor on-site faults; and in case of major faults, the equipment’s are replaced immediately.

We are, ever, systematic and rhythmic to the site progress right from mobilization till completion of the project and are always on alert to meet any eventualities by keeping spares and standby equipment’s in tune with our motto: “Keep Downtime Minimum” This entails saving valuable time of our valued customers.

Reddy Compressors Provide Services:

REDDY COMPRESSORS Provide services and solutions that enhance the efficiency of machines resulting in best results, less power consumption, less spares consumption, which helps in the best productivity.

We also provides the following services:

  • Repairing and Servicing of all types & sizes of Innersole Rand Make Air Compressors.
  • Repairing and Servicing of all types & sizes of Driers & Air Filters.
  • We also take servicing of All Types & Our Products on Annual Basis.
  • Providing Regular check-ups for all Air Compressors for our valued customers.
  • Providing Quarterly Maintenance Schedules for all Air Compressors & Driers.

Reddy Compressors Specialized  In Offering D.G Engine Services:

REDDY COMPRESSORS specialized in offering D.G Engine services, Our company can offer Engine overhauling of D.G Set of all kinds of well-known brand D.G Set (Cummins, Kirloskar, Caterpillar, etc), Make the required engine confirm to the original standards by inspecting & adjusting strictly according to the demand of engine design.

Technical support is provided by way of advice over phone or by deputing our service man within 24 hours of your complaint registration within Andhra Pradesh and within 48 hrs outside Andhra Pradesh . Your compressor will be provided with genuine   compressor spares, manufactured to exact specification, material and tolerances.

We also undertake Annual Maintenance Contract to service your compressors to run trouble free year after year.

Technical support is provided from our head office at HYDERABAD  and the Service & Technical team is led by a full-fledged Service Manager and Technical Manager.

There is a net work of dealers and service providers, who have been exclusively trained in   works and they will provide quick service to the customers in their respective regions. These organisations are provided with genuine spare parts to deal with the service promptly.