We Provide All Branded Used Air compressors Diesel and Electric Driven

  • Buying.
  • Selling.
  • Hiring.
  • Rental.

Used Air Compressors:

deal with a wide range of used Compressors, of any make and in any condition. We buy, sell and exchange the following kinds of generators and other type of power generation related equipment.

  • Trailer Mounted Compressor.
  • Standby Diesel Driven air compressors
  • Industrial Diesel Liquid Cooled Compressors
  • Portable Diesel Driven air compressors
  • Electric Driven Compressors
  • Belt Driven Air Compressors
  • Piston Compressors

We conduct exhaustive inspection of theDiesel Compressors  by using the latest testing technology and hence you can be rest assured of the quality of the used Compressor, you buy from us. REDDY Compressors  have subject matter experts of all the kinds of Air Compressors available in the market today. This means you will be treated with only the best generator technology in the market and nothing less.

We don’t just check the oil and listen to the noise of the Air Compressor. We thoroughly analyze and rate every component of the machine, from the engine to hydraulics, from the tiny washers to operator’s manual. There are more than 100 checkpoints that the quality team at checks before they include the used generator in the inventory.

Whenever a new or used Air Compressors  comes to we research and maintain a thorough maintenance history of the Compressor. This helps us and also our customer to make informed choice when buying theAir Compressor  from us.

Buy back facility of old DG Air Compressor against supply of new machines.

Re-installation and shifting of old Air Compressors to new sites / roof top installation. Execute AMC for our clients for Air Compressors Diesel and Electric Driven from 50CFM  To 1500 Cfm