REDDY COMPRESSORS has a legacy of providing reliable compressed air solutions for the construction, mining, and oil & gas industries for over four decades. Mining is both technically demanding and commercially challenging from drilling small to large blast holes the air compressors need to meet critical requirements of high speed, reliable performance and efficiency in the harshest of environments. Reddy Compressors have excelled in these environments and proven to be an ideal choice to meet these demands; with faster drilling they ensure increased production at lower drilling costs per foot.
Reddy Compressors portable diesel range of air compressors have a broad usage in a diverse range of applications that include DTH drilling, oil & gas exploration, tunnelling, pigging, sand blasting, piling, laying of fibre cables, hand tools, demolition tools, paving breakers, road and bridge construction.
With a capacity range from 50CFM to 1500CFM (82 l/s – 566 l/s) and an operating pressure range of 100psi to 350psi (690kPa – 2410kPa) Reddy Compressors have the air compressor to suit your application.
REDDY COMPRESSORS is today, the market leader and Hyderabad largest Supplier of Electrical and Diesel Driven air compressors