DTH Compressor Sizing and Duty Confirmation

47 min read1 sections

Choose a DTH compressor by the pressure and airflow it can deliver together at the site. Begin with the hole, drill string, hammer and return conditions; establish a common flow basis; then compare the complete duty with documented compressor and booster capability. This page gives the calculations, worked examples and decision records needed to explain that selection.

How to use the calculations

The numerical cases are illustrative assumptions, not Reddy fleet ratings, quotations, guaranteed depths or universal settings. All CFM comparisons within an example assume the same declared reference pressure, temperature and moisture basis. Values labelled actual flow apply only at the stated local thermodynamic condition. If a real case lacks that information, record it as unknown.

The pressure-budget examples use hammer differential pressure and an explicitly assumed exhaust backpressure. Sections 7 and 21 explain the alternative when the supplier gives a hammer inlet pressure already corrected for exhaust conditions. Freshwater head calculations use density 1000 kg/m³ and gravitational acceleration 9.81 m/s². Circulating air-water-cuttings mixtures require a justified return-flow assessment; static head alone is not a complete model.

A shared hammer/exhaust path does not guarantee that any calculated excess air can pass through the selected hammer. A manufacturer-approved flushing or bypass configuration may be necessary. The maximum of hammer and cleaning demands is a preliminary lower bound after conversion to one basis, not proof that the flow route can deliver it.

Define the duty before requesting equipment

A defensible sizing decision connects the application’s air demand with the offered compressor’s supported duty. It should be possible to explain why the machine was selected, which assumptions matter and what changes would require a new review. A CFM label alone is not that explanation.

Start with the exact hammer and its documented demand at the intended operating condition. Add the drilling specialist’s assessment of the hole, drill string and return conditions. Identify separate operating stages, including any different requirement during flushing or another approved activity.

Do not automatically add a hammer-flow figure to a hole-cleaning-flow figure as though they were unrelated consumers. The reviewer must establish the actual flow paths and whether each figure describes the same air serving successive functions. Genuine simultaneous additional consumers should be identified separately.

Record airflow units, reference conditions and the pressure boundary for both sides of the comparison. State whether a supplied value is free-air delivery, another reference-volume quantity or a local actual volume. Refer to the Annular Velocity guide when translating a geometric calculation into a defined flow basis.

Request model-specific compressor evidence for the proposed duty and site conditions. Do not combine an airflow maximum and a pressure maximum from different operating points. The offered configuration and its applicable performance information belong in the selection record.

Any allowance for distribution, site conditions, uncertainty or future duty should be named and justified by the responsible reviewer. Avoid an unexplained percentage added repeatedly at different stages. A transparent selection shows what has been allowed for and what remains unresolved.

The final duty statement should identify equipment, application, boundaries and limitations in plain language. It should also name changes that invalidate the selection, such as different tooling or an altered air arrangement. A quotation can then refer to a common technical brief instead of relying on separate verbal descriptions.

Request a duty-based proposal: submit the project enquiry brief with manufacturer data and the contractor’s inputs. The earlier DTH Compressor Selection guide remains the introduction; this page explains the decision record used to close the selection.

Calculation and selection reference

The following 225 numbered sections cover geometry, demand, pressure, equipment matching, economics, changing conditions, units and an integrated worked example.

1 The Two Fundamental Compressor Requirements

Every DTH compressor-selection calculation must independently establish:

Airflow Requirement

Qrequired

and:

Pressure Requirement

Prequired

The compressor must satisfy both simultaneously at the required operating condition.

Therefore:

Qavailable≥Qrequired

and:

Pavailable≥Prequired

Meeting only one condition is insufficient.

2 Why Compressor Horsepower Alone Is Not a Selection Method

Engine power does not directly tell us whether a compressor is suitable for a particular DTH application.

Two machines with similar engine ratings may have different:

  • airflow
  • maximum pressure
  • compressor architecture
  • control characteristics
  • ambient derating
  • operating envelopes

Therefore:

Engine Power≠DTH Compressor Selection

The drilling system requires verified pressure-flow performance.

3 Required Input Data

Before calculation, establish:

Borehole

target hole diameter Dh,

target depth L,

expected final depth,

casing programme.

Drill String

drill-pipe outside diameter Dp,

drill-pipe inside diameter Di,

joint geometry,

expected total length.

Hammer

model,

nominal size,

recommended bit range,

manufacturer airflow curve,

manufacturer operating-pressure range.

Formation

hardness,

abrasiveness,

expected cuttings characteristics,

fractured/competent condition.

Water

expected groundwater,

water-column/head estimate,

likely water inflow.

Site

altitude,

ambient temperature,

access/logistics.

Without these inputs, compressor sizing is preliminary rather than final.

4 Step 1 — Select Required Hole Diameter

Let:

Dh=Borehole Diameter

This parameter influences:

  • bit selection
  • hammer selection
  • annular area
  • rock volume removed
  • required hole-cleaning airflow
  • A larger hole generally requires greater flushing capability

5 Step 2 — Select Compatible Bit

The bit must satisfy:

Dbit≈Dh

subject to:

  • hammer compatibility
  • formation
  • casing requirement
  • manufacturer recommendations

Bit diameter establishes the effective drilled-hole diameter used in the annular-flow calculation.

6 Step 3 — Select Compatible DTH Hammer

Select a hammer compatible with:

  • bit shank
  • hole diameter
  • formation
  • rig capability

Then obtain manufacturer data for:

Qh(P)

Where:

Qh = hammer air consumption,

P = hammer operating pressure.

Do not estimate hammer consumption from diameter alone when verified manufacturer data is available.

7 Define the hammer pressure boundary

Record whether the manufacturer value is hammer inlet gauge pressure, inlet absolute pressure, or inlet-to-exhaust differential pressure. These quantities cannot be substituted for each other.

For the pressure-budget examples on this page, ΔPh means the assumed pressure difference required across the hammer. The inlet requirement is then:

Ph,in,g=Ph,out,g+ΔPh.

If the supplier instead gives an inlet pressure already corrected for the actual exhaust backpressure, use that inlet requirement directly and do not add the same backpressure a second time. A catalogue curve measured with atmospheric exhaust does not, by itself, establish performance under water backpressure. Obtain the selected hammer manufacturer’s interpretation and limits.

8 Step 5 — Establish Hammer Air Demand

From the manufacturer airflow curve determine:

Qh

at the intended:

ΔPh

This is the first major airflow requirement.

But it may not be the final compressor airflow requirement.

Hole cleaning must also be checked.

9 Step 6 — Calculate Annular Area

For a simplified circular bore and drill pipe:

Aa=π4(Dh2−Dp2)

Where:

Aa = annular area,

Dh = borehole diameter,

Dp = drill-pipe outside diameter.

Use consistent units.

10 Worked Annular-Area Example

Assume:

Dh=0.1524m

and:

Dp=0.089m

Then:

Aa=π4(0.15242−0.0892)

Calculate:

0.15242=0.023226

0.0892=0.007921

Therefore:

Aa=π4(0.015305)

Aa≈0.0120m2

This is the approximate annular return-flow area.

11 Step 7 — Establish Required Annular Velocity

However, the appropriate velocity is application dependent.

It depends on:

  • cuttings size
  • density
  • formation
  • bore geometry
  • water conditions
  • air expansion

12 Critical Flow-Basis Warning

The airflow used in:

Qa=VaAa

must represent volumetric flow at the conditions where annular velocity is being evaluated.

Do not insert compressor FAD directly into an in-hole actual-volume equation without converting conditions appropriately.

This is one of the most common sources of incorrect drilling-air calculations.

13 Step 8 — Compare Hammer Demand and Cleaning Demand

The compressor must satisfy both functions.

Conceptually:

Qrequired≥max(Qh,Qcleaning)

plus allowances for:

  • legitimate leakage
  • operating variation
  • appropriate engineering reserve

Do not simply add two complete airflow values if the hammer exhaust itself is performing the hole-cleaning function.

Avoid double-counting the same air.

14 Airflow Balance

A more useful system relationship is:

Qcompressor=Qhammer path+Qother legitimate demand+Qlosses

The hammer exhaust normally becomes part of the return airflow.

Therefore hammer air consumption and annular cleaning are interconnected requirements.

15 Step 9 — Calculate Surface Pressure Losses

Pressure can be lost through:

  • compressor outlet
  • aftercooling/separation components where fitted
  • hose
  • valves
  • manifold
  • couplings
  • drill head/swivel

Represent:

ΔPs=∑ΔPsurface

These losses should preferably come from:

  • manufacturer data
  • pressure-drop calculations
  • measured field data

16 Step 10 — Calculate Drill-String Pressure Loss

Conceptually:

ΔPd=f(L,Di,Q,ρ,ϵ,fittings)

Where:

L = drill-string length,

Di = internal diameter,

Q = airflow,

ρ = air density,

ϵ = roughness.

Because compressed air is compressible, rigorous high-pressure calculations require an appropriate compressible-flow method.

A simple incompressible-water pressure-drop equation should not be blindly applied.

17 Why Drill-Pipe Internal Diameter Matters

For a given flow:

Di↓⇒Vpipe↑

which can substantially increase frictional pressure loss.

Therefore a drill pipe selected only for mechanical strength can unintentionally create a pneumatic restriction.

The drill string must satisfy both:

Mechanical Requirement

and:

Airflow Requirement

18 Step 11 — Calculate Hydrostatic Backpressure

For a water column:

Pw=ρwgh

For freshwater, approximately:

Pw≈0.0981h bar

when h is in metres.

19 Worked Water-Head Example

Suppose the effective water head opposing the drilling air is:

h=150m

Then:

Pw≈0.0981×150

Pw≈14.7bar

This is already a substantial pressure requirement before adding:

  • hammer differential pressure
  • drill-string loss
  • surface losses
  • controlled margin

20 Water Head Is Not Necessarily Equal to Hole Depth

A 300 m borehole does not automatically create:

  • 300m
  • of hydrostatic water head
  • The relevant fluid column depends on actual borehole and groundwater conditions

Therefore:

Hole Depth≠Water Head

unless the actual conditions make them equivalent.

21 Build the source pressure budget

Using a hammer differential-pressure requirement, the planning relationship is:

Psource,g=ΔPh+Ph,out,g+ΔPs+ΔPd+ΔPo+Pm.

Here Ph,out,g is the gauge pressure at the hammer exhaust; ΔPs is the surface supply loss; ΔPd is drill-string supply loss; ΔPo contains additional losses not already counted; and Pm is a named operating allowance.

For the illustrative static freshwater cases, Ph,out,g is approximated by Pw=ρwgh/105 bar. This approximation does not predict the moving air-water-cuttings return. Do not add full static water head to an exhaust pressure that already includes it. State the return-flow model and avoid counting annular losses twice.

An alternative route, where the supplier supplies the required hammer inlet gauge pressure for the actual exhaust condition, is Psource,g=Ph,in,g+ΔPs+ΔPd+ΔPo+Pm. Both routes must refer to the same operating case.

22 Do Not Add Arbitrary Pressure Margin

The engineering margin should account for legitimate uncertainty such as:

  • depth variation
  • measured loss variation
  • water conditions
  • operating fluctuations

It should not be used to conceal:

  • unknown pressure losses
  • poor calculation
  • leakage
  • restrictions
  • The objective is controlled reserve—not arbitrary oversizing

23 Step 13 — Establish Required Compressor Flow

At the relevant reference condition:

Qc≥Qrequired

with appropriate allowance for actual site conditions.

The selected compressor must deliver the required airflow at the required pressure, not merely at a lower catalogue pressure.

24 Pressure–Flow Operating Point

The true selection point is:

(Qrequired,Prequired)

Therefore compressor comparison should ask:

Can this machine deliver the required flow at this pressure under these site conditions?

Not merely:

What is its maximum CFM?

or:

What is its maximum pressure?

25 Maximum CFM and Maximum Pressure May Not Be Simultaneous

Depending on compressor design, a machine’s:

Qmax

and:

Pmax

may not represent one simultaneous operating point.

Therefore use verified pressure-flow performance information rather than combining unrelated maximum specifications.

26 Step 14 — Correct for Altitude

At increased altitude, atmospheric pressure and air density decrease.

This can affect:

  • engine power
  • compressor mass-flow capability
  • cooling

Therefore:

Qavailable,site

may differ from rated reference-condition performance.

Use manufacturer altitude correction or derating data.

27 Step 15 — Correct for Ambient Temperature

High ambient temperature can influence:

  • air density
  • cooling
  • engine capability
  • compressor operating temperature
  • Use equipment-specific correction data where required
  • Do not invent a universal percentage derating per degree

28 Step 16 — Verify Engine Capability

A compressor package must have sufficient engine capability to produce the required pressure-flow condition under site conditions.

Therefore verify:

  • altitude derating
  • ambient conditions
  • compressor loading
  • cooling capacity

The compressor air end cannot continuously deliver a condition that the prime mover cannot support.

29 Step 17 — Check Compressor Operating Reserve

After site correction:

Qreserve=Qavailable,site−Qrequired

and:

Preserve=Pavailable−Prequired

Reserve should be positive and technically justified.

A system operating continuously with virtually zero reserve can become vulnerable to:

  • depth increase
  • water entry
  • leakage
  • wear
  • environmental changes

30 Airflow Reserve Percentage

A project-specific indicator is:

RQ(%)=Qavailable−QrequiredQrequired×100

This is useful for comparison but should not be treated as a universal required reserve percentage.

31 Pressure Reserve Percentage

Similarly:

RP(%)=Pavailable−PrequiredPrequired×100

Again, acceptable reserve depends on:

  • application
  • equipment
  • uncertainty
  • manufacturer operating envelope

32 Step 18 — Determine Whether a Booster Is Required

A booster becomes relevant when:

Prequired>Ppractical,primary

while the primary system can still provide suitable upstream mass flow for the booster.

Therefore:

Booster Decision=Pressure Deficit with Adequate Upstream Flow

not simply:

Deep Hole⇒Booster

33 Booster Is Not an Airflow Substitute

If:

Qprimary<Qrequired

a booster does not solve the fundamental upstream mass-flow deficit.

The correct response may require:

  • greater primary compressor capacity
  • different compressor architecture
  • reduced avoidable losses
  • revised hammer/bit configuration

34 Booster Inlet Requirement

Verify:

Qprimary≥Qbooster,inlet

at the required inlet pressure and reference conditions.

Also verify:

  • booster allowable inlet pressure
  • maximum discharge pressure
  • pressure ratio
  • cooling
  • temperature
  • duty cycle

35 Booster Pressure Ratio

Using absolute pressures:

PR=Pout,absPin,abs

Example:

Primary compressor:

Pin=20bar(g)

Required booster outlet:

Pout=35bar(g)

Approximately:

Pin,abs=21bar

Pout,abs=36bar

Therefore:

PR=3621

PR≈1.71

Actual allowable operating conditions must come from booster manufacturer data.

36 Step 19 — Verify Complete Pressure Rating

Every downstream component must be rated appropriately for the maximum credible pressure.

Verify:

  • booster discharge piping
  • hose
  • manifold
  • valves
  • couplings
  • drill head
  • swivel
  • drill string
  • associated components
  • The lowest-rated component can establish the safe system limit

37 Step 20 — Check Compressor Fuel/Productivity Implication

Once several technically acceptable compressor configurations are identified, compare:

  • L/h
  • L/m
  • ROP
  • ₹/m
  • Availability

The smallest technically suitable machine is not automatically the lowest-cost drilling solution.

38 Compressor Sizing Calculation Sheet

A controlled selection worksheet should contain:

Parameter

Symbol

Value

Hole diameter

Dh

—

Pipe OD

Dp

—

Pipe ID

Di

—

Depth

L

—

Hammer

—

—

Hammer pressure

ΔPh

—

Hammer airflow

Qh

—

Annular area

Aa

—

Cleaning airflow

Qclean

—

Surface loss

ΔPs

—

Drill-string loss

ΔPd

—

Water head

h

—

Water pressure

Pw

—

Required source pressure

Preq

—

Required airflow

Qreq

—

Altitude

—

—

Temperature

—

—

Site-corrected compressor flow

Qsite

—

Compressor max working pressure

—

—

Booster required

—

Yes/No

This worksheet creates traceability between drilling requirement and equipment selection.

39 Worked Example A — Shallow Dry DTH Hole

Assume, for illustration:

  • hole diameter = 115 mm
  • drill pipe OD = 76 mm
  • depth = 80 m
  • dry borehole

selected hammer requires a manufacturer-verified airflow Qh,

assumed hammer differential pressure = 18 bar,

calculated/verified surface + drill-string losses = 2 bar,

controlled margin = 2 bar.

With:

Pw=0

required source pressure becomes:

Preq=18+2+2

Preq=22bar(g)

The compressor must then be checked for adequate airflow at approximately this operating pressure.

The example intentionally does not invent hammer CFM; that value must come from the selected hammer’s verified data.

40 Example A — Annular Area

Using:

Dh=0.115m

and:

Dp=0.076m

the annular area is:

Aa=π4(0.1152−0.0762)

0.1152=0.013225

0.0762=0.005776

Therefore:

Aa=π4(0.007449)

Aa≈0.00585m2

This area is then used to evaluate whether the selected hammer airflow provides adequate return-flow velocity under the relevant in-hole conditions.

41 Example A — Compressor Selection Logic

The selection sequence becomes:

Qhammer→Qcleaning→Qrequired

and:

Phammer+ΔPsystem+Pmargin→Prequired

For Example A:

Prequired≈22bar(g)

The candidate compressor must therefore provide:

Qavailable,site≥Qrequired

at:

P≈22bar(g)

after any applicable site correction.

If the primary compressor can satisfy both requirements with appropriate reserve, a booster is unnecessary.

42 Example A — Why Maximum Compressor Pressure Is Irrelevant

Suppose a candidate compressor has a maximum rating substantially above 22 bar.

That alone does not make it the preferred machine.

The important question remains:

What airflow can the compressor continuously deliver at the required operating pressure, under actual site conditions?

Therefore:

Pmax>Prequired

is necessary only to the extent required for a suitable operating envelope.

Excess maximum pressure does not automatically create drilling value.

43 Worked Example B — Deeper Dry Hole

Assume:

  • hole diameter = 152 mm
  • drill-pipe OD = 89 mm
  • target depth = 300 m
  • dry borehole
  • hammer differential pressure assumption = 20 bar
  • surface-system loss = 1.5 bar
  • calculated/verified drill-string loss = 4.0 bar
  • other justified loss = 0.5 bar
  • engineering margin = 2.0 bar

Because the hole is dry:

Pw=0

Therefore:

Prequired=20+1.5+4.0+0.5+2.0

Prequired=28bar(g)

The pressure requirement has increased substantially even though no hydrostatic head exists.

44 Example B — Annular Area

Using:

Dh=0.152m

and:

Dp=0.089m

Aa=π4(0.1522−0.0892)

0.1522=0.023104

0.0892=0.007921

Therefore:

Aa=π4(0.015183)

Aa≈0.011925m2

This is more than twice the annular area in the smaller-hole Example A.

Therefore the same actual return airflow would produce a substantially lower annular velocity.

45 Example B — Annular Velocity Sensitivity

Suppose actual in-hole volumetric flow at the evaluated location is:

Qa

Then:

Va=Qa0.011925

If the bore diameter increases while Qa remains unchanged:

Aa↑

therefore:

Va↓

This illustrates why compressor selection for a larger bore cannot be based only on hammer consumption.

Hole cleaning must also be verified.

46 Example B — Primary Compressor Decision

Suppose the candidate primary compressor is rated for the required airflow but only at:

25bar

while the calculated source requirement is:

28bar

Then:

Pavailable<Prequired

The configuration fails the pressure gate.

Possible engineering responses include:

  • select a higher-pressure compressor
  • evaluate a properly matched booster
  • reduce verified avoidable pressure losses
  • reconsider the complete drilling architecture

Do not simply assume the 25-bar machine will be adequate because the difference appears small.

47 Worked Example C — Deep Water-Bearing Hole

Assume:

  • hole diameter = 165 mm
  • drill-pipe OD = 102 mm
  • target depth = 400 m
  • hammer differential pressure assumption = 20 bar
  • surface loss = 1.5 bar
  • drill-string loss = 4.5 bar
  • other losses = 1.0 bar
  • effective freshwater head = 120 m
  • engineering margin = 2 bar

First calculate hydrostatic pressure:

Pw=0.0981×120

Pw≈11.77bar

Then:

Prequired=20+1.5+4.5+1.0+11.77+2

Prequired≈40.77bar(g)

This illustrates how groundwater can fundamentally change compressor architecture.

48 Example C — Why Hole Depth Alone Would Have Failed

The hole depth is:

400m

but the water head used in the calculation is only:

120m

Therefore using:

400×0.0981

would incorrectly assume a 400 m effective water column.

The correct pressure calculation must use the actual relevant fluid head.

This reinforces:

Drilling Depth≠Hydrostatic Head

49 Example C — Booster Decision

Suppose the primary compressor can supply the required mass flow at approximately:

20bar(g)

but cannot reach:

  • 40.77bar(g)
  • Then the system has principally a pressure deficit

A high-pressure booster may therefore be evaluated, provided:

Qprimary≥Qbooster,inlet

and the complete booster operating envelope is suitable.

50 Example C — Booster Pressure Ratio

Assume:

Pin=20bar(g)

and:

Pout=41bar(g)

approximately.

Convert to absolute pressure:

Pin,abs≈21bar

Pout,abs≈42bar

Then:

PR=4221

PR≈2.0

Whether this pressure ratio is permissible must be established from the actual booster manufacturer’s performance data.

51 Example C — Complete High-Pressure Rating Check

If boosted discharge pressure is approximately:

  • 41bar(g)
  • do not check only the booster

Verify the ratings of:

  • discharge hose
  • manifold
  • valves
  • couplings
  • drill head
  • swivel
  • drill string
  • other downstream components

The safe operating limit is constrained by the weakest appropriately identified component in the pressure circuit.

52 Worked Example D — Large-Diameter Hole

Assume:

  • hole diameter = 203 mm
  • drill-pipe OD = 114 mm

Then:

Aa=π4(0.2032−0.1142)

0.2032=0.041209

0.1142=0.012996

Difference:

0.028213

Therefore:

Aa=π4(0.028213)

Aa≈0.02216m2

This is a large annular area.

Hole-cleaning airflow can therefore become a major selection driver.

53 Example D — Required Actual Flow for Selected Velocity

If an engineering assessment establishes a target actual annular velocity:

Vtarget

then:

Qactual=AaVtarget

For illustration only, if:

Vtarget=20m/s

then:

Qactual=0.02216×20

Qactual=0.4432m3/s

or:

Qactual≈26.6m3/min

Important: this is actual volumetric flow at the location/conditions being evaluated—not automatically compressor FAD.

The chosen target velocity itself must be justified for the actual drilling application.

54 Example D — Convert Actual Flow Carefully

To relate an in-hole actual flow to compressor reference flow, use an appropriate gas relationship.

For an idealized mass balance:

P1Q1T1≈P2Q2T2

subject to the actual system and reference definitions.

Therefore:

QFAD

cannot be assumed numerically equal to:

Qannulus,actual

at high pressure.

55 Standard vs Actual Flow Conversion Concept

For the same mass flow:

ṁ=ρQ

Therefore:

ρ1Q1=ρ2Q2

and, using the ideal-gas approximation:

Q2=Q1P1P2T2T1

provided pressures are absolute and the selected reference basis is consistent.

Real drilling systems require appropriate allowance for:

  • pressure variation
  • temperature
  • leakage
  • hammer exhaust behaviour

56 Do Not Double Count Air Expansion

A common error is to:

  • use compressor free-air flow directly as annular actual flow, and then
  • separately add an air-expansion factor
  • This can produce an internally inconsistent calculation
  • Choose one defined mass-flow/reference basis and convert systematically

57 Worked Example E — Altitude Correction Concept

Assume a compressor satisfies the requirement at its reference rating.

The drilling site is at significant altitude.

Do not simply use:

Qrated

as:

Qavailable,site

Instead obtain manufacturer correction data and calculate:

Qsite=Qrated×Kaltitude

where:

Kaltitude

is the verified equipment-specific correction factor.

The same principle applies to engine capability.

58 Example E — Selection Gate After Derating

Suppose:

Qrequired=1000CFM

and a machine is nominally rated:

Qrated=1050CFM

If site correction produces:

Qsite=960CFM

then:

Qsite<Qrequired

The machine fails the airflow gate despite apparently exceeding the requirement on the catalogue rating.

59 Temperature Correction Concept

Similarly:

Qsite=f(Qrated,Altitude,Temperature,Equipment Design)

Do not invent a universal correction factor.

Use verified manufacturer information for the candidate compressor.

60 Combined Site Derating

Where manufacturer methodology permits:

Qsite=QratedKAKTKother

Where:

KA = altitude factor,

KT = temperature factor,

Kother = other specified correction.

Only use multiplicative factors if the manufacturer specifies that method.

61 Worked Example F — Pressure-Loss Reduction

Suppose:

ΔPh=20bar

water head:

Pw=10bar

and original system losses are:

∑ΔP=8bar

with:

Pm=2bar

Then:

Prequired=20+10+8+2

Prequired=40bar

Now suppose engineering improvements reduce avoidable losses by:

3bar

New losses:

5bar

Then:

Prequired,new=20+10+5+2

Prequired,new=37bar

A distribution-system improvement has reduced source pressure requirement by 3 bar without changing the hammer or borehole.

62 Example F — Why This Matters

That 3-bar reduction may:

  • reduce booster duty
  • reduce compression energy
  • improve operating reserve
  • lower thermal loading
  • It may even change which compressor/booster combination is technically viable

Therefore:

Reduce Avoidable Losses Before Buying More Pressure

63 Worked Example G — Airflow Deficit

Suppose:

Qrequired=1200CFM

but the selected primary compressor can provide only:

Qavailable=1000CFM

at the required operating pressure.

Then:

Qdeficit=1200−1000

Qdeficit=200CFM

A booster does not solve this fundamental airflow deficit.

The primary compressor architecture must be reconsidered.

64 Worked Example H — Pressure Deficit

Suppose:

Qrequired=1000CFM

and the primary compressor provides:

Qavailable=1100CFM

but:

Prequired=35bar

while primary practical pressure is:

25bar

Then airflow is adequate:

1100>1000

but pressure is not:

25<35

This is the type of condition in which booster assistance may be evaluated.

65 Worked Example I — Both Flow and Pressure Deficient

Suppose:

Qrequired=1200CFM

Prequired=35bar

but the candidate primary system provides:

Qavailable=950CFM

and:

Pavailable=25bar

Then:

Qavailable<Qrequired

and:

Pavailable<Prequired

The system fails both selection gates.

A booster attached to the same undersized upstream system does not constitute a complete engineering solution.

66 Four Compressor Selection Conditions

Every candidate falls into one of four broad conditions:

Condition

Airflow

Pressure

Engineering Direction

A

Adequate

Adequate

Primary compressor potentially suitable

B

Adequate

Inadequate

Evaluate higher-pressure machine/booster

C

Inadequate

Adequate

Increase airflow capability

D

Inadequate

Inadequate

Redesign compressor architecture

This simple matrix prevents pressure and airflow from being confused.

67 Hammer Consumption Curve

Hammer airflow should ideally be evaluated at several pressures:

Qh(P1)

Qh(P2)

Qh(P3)

because air consumption can change as hammer operating pressure changes.

Therefore a single CFM value without associated pressure may be incomplete.

68 Compressor Performance Curve

Similarly, candidate compressor data should establish:

Qc(P)

The selection condition is where:

Qc(Prequired)≥Qrequired

subject to site corrections.

This is much stronger than comparing nameplate maximums.

69 Graphical Selection Method

Plot:

Hammer/System Requirement

Qrequired(P)

and:

Compressor Capability

Qc(P)

The candidate compressor must maintain adequate capability around the required operating region.

This provides a visual engineering method for comparing alternatives.

70 Operating Point

The actual operating point occurs where the compressor/system controls and downstream demand establish a stable combination of:

(Q,P)

The selected compressor should operate within its approved and efficient range at this point.

71 Avoid Selecting Exactly at the Limit

A compressor whose corrected capability is exactly:

Qrequired

and:

Prequired

has essentially no reserve for:

  • uncertainty
  • wear
  • leakage
  • deeper drilling
  • water changes
  • Therefore practical selection should include justified reserve

72 Avoid Excessive Reserve

Conversely, excessive reserve can increase:

  • purchase/rental cost
  • fuel consumption
  • logistics

The goal is:

Requirement+Justified Reserve

not arbitrary oversizing.

73 Selection Reserve vs Safety Factor

These terms should not be confused.

Operating Reserve

Capacity available for normal variation.

Safety Factor

A design concept applied where relevant to mechanical/engineering limits.

Do not treat additional compressor pressure as a substitute for properly rated pressure-system components.

74 Pressure Equipment Safety

If the calculated system requires high pressure, component ratings must be independently verified.

Never use:

Pmargin

to justify operating an underrated hose or coupling.

Safe working pressure remains an equipment constraint.

75 Worked Example J — Compressor Comparison

Assume the calculated drilling requirement is:

Qrequired=1050CFM

Prequired=28bar

after site correction.

Three candidate systems provide:

  • Compressor A
  • 1000CFM@28bar
  • Compressor B
  • 1150CFM@28bar
  • Compressor C
  • 1400CFM@28bar

Then:

  • A fails the airflow requirement
  • B satisfies the calculated requirement with moderate airflow reserve

C also satisfies the technical requirement but provides substantially greater reserve.

Airflow reserve for B:

RQ,B=1150−10501050×100

RQ,B≈9.5%

For C:

RQ,C=1400−10501050×100

RQ,C≈33.3%

This calculation does not automatically establish B or C as the preferred compressor.

The technically acceptable candidates must next be compared for:

  • actual pressure-flow capability
  • expected future depth
  • water conditions
  • fuel consumption
  • availability
  • rental/ownership cost
  • operating reserve
  • cost per accepted metre

76 Technical Gate Before Economic Comparison

The selection process must occur in the correct order:

TECHNICAL QUALIFICATION → ECONOMIC COMPARISON.

Do not economically compare a compressor that fails:

Qavailable≥Qrequired

or:

Pavailable≥Prequired

as though it were an equivalent alternative.

A cheaper machine that cannot perform the required drilling duty is not a valid economic option.

77 Worked Example K — Fuel/Productivity Comparison

Suppose Compressors B and C both satisfy the technical requirement.

Compressor B

Fuel:

38L/h

Effective ROP:

18m/h

Then:

Fm,B=3818

Fm,B≈2.11L/m

Compressor C

Fuel:

46L/h

Effective ROP:

21m/h

Then:

Fm,C=4621

Fm,C≈2.19L/m

In this hypothetical case, C drills faster but B consumes slightly less fuel per metre.

Neither result alone determines the final selection.

78 Example K — Cost per Metre

Suppose total attributable hourly operating cost is:

B

CB,h=₹6,500/h

C

CC,h=₹7,200/h

Then:

CB,m=650018

CB,m≈₹361.11/m

and:

CC,m=720021

CC,m≈₹342.86/m

Therefore C has higher:

L/m

but lower:

  • ₹/m
  • under these assumptions because of higher productivity

79 Productivity Requirement Can Change Selection

Suppose the project must complete:

  • 420m/day
  • within the available productive operating window

If B cannot reliably achieve the required daily output but C can, then the larger machine’s productivity capability becomes commercially important.

Compressor sizing should therefore consider:

Technical Air Requirement+Required Project Production

80 Required Daily Production

If project requirement is:

Md

and available productive drilling time is:

Tp

then required effective ROP is:

ROPrequired=MdTp

Example:

Md=160m

Tp=8h

Then:

ROPrequired=1608

ROPrequired=20m/h

A technically adequate compressor-hammer system producing only 15 m/h may therefore fail the project productivity requirement.

81 Technical Capacity vs Project Capacity

These must be distinguished.

Technical Capacity

Can the compressor operate the hammer and clean the hole?

Project Capacity

Can the complete drilling system produce the required accepted metres within the available schedule?

A machine can pass the first test and fail the second.

82 Worked Example L — Productivity Gate

Suppose:

System B

ROP=18m/h

System C

ROP=22m/h

Available productive time:

Tp=8h/day

Then:

MB=18×8=144m/day

MC=22×8=176m/day

If contractual/project requirement is:

160m/day

then:

144<160

while:

176>160

System C satisfies the simplified productivity gate; B does not under these assumptions.

83 Availability Must Be Included

Nominal daily production assumes equipment remains available.

If:

A=90%

then simplified effective available drilling time becomes:

Tavailable=TsA

If utilization is also:

U

then:

Tproductive=TsAU

Therefore:

Mday=Ts×A×U×ROP

before any accepted-yield adjustment.

84 Worked Example M — Availability Effect

Assume:

Ts=10h

A=0.90

U=0.80

ROP=20m/h

Then:

Tp=10×0.90×0.80

Tp=7.2h

Therefore:

Mday=7.2×20

Mday=144m

A 20 m/h hammer-on-bottom penetration rate therefore does not automatically mean 200 m/day from a 10-hour shift.

85 Accepted Yield

If only:

Y=95%

of gross output becomes accepted output:

Maccepted=MgrossY

For:

Mgross=144m

Maccepted=144×0.95

Maccepted=136.8m/day

This is the more meaningful production number for project economics.

86 Complete Productivity Equation

Therefore:

Maccepted=Ts×A×U×ROP×Y

This equation should accompany compressor sizing whenever project schedule matters.

87 Worked Example N — Compressor Too Small Economically

Suppose a smaller compressor technically operates the hammer but produces:

ROP=12m/h

while a properly matched larger system produces:

ROP=20m/h

If both systems are required for 1,000 accepted metres, simplified productive drilling hours are:

Small system:

T1=100012≈83.3h

Larger system:

T2=100020=50h

Difference:

ΔT≈33.3h

The smaller machine’s lower hourly cost may be overwhelmed by additional operating time.

88 Worked Example O — Compressor Excessively Large

Suppose required airflow is:

900CFM

at:

20bar

A candidate compressor can supply:

  • 1600CFM
  • at the required pressure

If the hammer and hole-cleaning system cannot use the additional capacity productively, the larger machine may add:

  • fuel
  • rental cost
  • transport burden
  • without equivalent ROP improvement

Therefore:

Qavailable≫Qrequired

requires economic justification.

89 Compressor Utilization Window

A suitable compressor should operate effectively across the expected demand range:

Qmin→Qmax

and:

Pmin→Pmax

The project should avoid selecting a machine that is:

  • inadequate at the upper requirement
  • grossly inefficient throughout most of the lower requirement

90 Variable pressure operation

Where the package permits it, the operating setting may follow the approved stage pressure target. On this page Prequired already includes the explicitly chosen pressure allowance. Do not add that allowance again when translating the selection target into a setting. Apply the manufacturer’s control procedure, tolerances and maximum equipment limits; a worksheet result is not an instruction to change a regulator.

91 Variable Demand by Depth

The drilling requirement may evolve approximately as:

D↑

leading to changes in:

ΔPstring

Pw

Qcleaning

and potentially:

Prequired

Therefore compressor selection should be based on the expected complete drilling envelope, not only surface conditions.

92 Depth-Stage Selection

A project can model:

Stage 1

0−D1

Stage 2

D1−D2

Stage 3

D2−Dfinal

For each stage calculate:

Qrequired,i

and:

Prequired,i

This reveals whether one compressor can efficiently cover the complete hole.

93 Staged Compressor Architecture

Where project scale justifies it, possible strategies include:

  • Strategy A
  • One compressor for complete depth
  • Strategy B
  • Lower-pressure compressor initially, then change to high-pressure equipment
  • Strategy C
  • Primary compressor throughout, booster introduced at deeper stage

The technical and economic optimum depends on:

  • changeover cost
  • project metres
  • depth profile
  • equipment availability

94 Booster Introduction Depth

Define:

DB

as the depth at which:

Prequired(DB)

approaches or exceeds practical primary-compressor capability.

The booster should not be introduced solely because a predetermined depth number has been reached.

Actual system pressure requirement controls the decision.

95 Worked Example P — Booster Start Depth

Suppose calculated pressure requirement is:

Depth

Required Pressure

100 m

22 bar

200 m

24 bar

300 m

27 bar

350 m

31 bar

400 m

36 bar

Assume primary compressor practical operating capability for the required airflow is:

30bar

Then the pressure requirement first exceeds this capability between approximately:

300m

and:

350m

The actual booster introduction decision should consider measured field conditions and suitable operating reserve.

96 Interpolation Concept

If a simplified linear approximation between 300 and 350 m is considered for planning:

At 300 m:

P=27bar

At 350 m:

P=31bar

Increase:

4bar

over:

50m

To reach 30 bar requires:

  • 3bar
  • above the 300 m condition

Approximate depth increment:

50×34=37.5m

Therefore:

D≈337.5m

This is only an illustrative interpolation.

Real pressure requirement may not vary linearly with depth.

97 Field Verification Overrides Planning Approximation

The calculated:

DB

is a planning value.

During drilling, verify:

  • actual source pressure
  • drill-head pressure
  • hammer performance
  • water conditions
  • ROP

A sudden water-bearing zone can change booster requirement earlier than a dry-hole calculation predicts.

98 Worked Example Q — Water Entry Changes Selection

Suppose at 280 m:

Prequired=27bar

and the primary compressor remains adequate.

At 300 m, a significant water zone introduces an additional:

  • 8bar
  • of effective hydrostatic backpressure

New requirement becomes approximately:

  • 27+8
  • 35bar

The compressor architecture may therefore change abruptly because of water—not simply because another 20 m was drilled.

99 Dynamic Recalculation

DTH compressor sizing should therefore be treated as:

Initial Design+Field Verification+Recalculation When Conditions Change

Important triggers include:

  • significant water entry
  • bore diameter change
  • hammer change
  • bit change
  • drill-string change
  • unexpected pressure loss

100 Change-Control Rule

When a major drilling variable changes, do not assume the original compressor calculation remains valid.

Recalculate at least the affected portions.

Examples:

  • Larger Bit
  • Recalculate annular area and cleaning requirement
  • Different Hammer
  • Recalculate airflow and pressure demand
  • Deeper Target
  • Recalculate drill-string losses and water exposure
  • Different Drill Pipe
  • Recalculate internal pressure loss and annular geometry

101 Worked Example R — Larger Bit Installed

Original:

Dh=152mm

New:

Dh=203mm

with the same:

Dp=102mm

Original annular area:

Aa1=π4(0.1522−0.1022)

0.1522=0.023104

0.1022=0.010404

Aa1≈0.00997m2

New:

Aa2=π4(0.2032−0.1022)

Aa2≈0.02419m2

The annular area increases by more than two times.

Therefore the original cleaning-air calculation is no longer valid.

102 Example R — Area Ratio

RA=Aa2Aa1

RA=0.024190.00997

RA≈2.43

At the same actual annular volumetric flow:

Va2=Va12.43

approximately.

This demonstrates how dramatically larger bore diameter can alter hole-cleaning performance.

103 Worked Example S — Larger Drill Pipe

Suppose hole diameter remains:

203mm

but drill-pipe OD increases from:

89mm

to:

  • 114mm
  • The larger pipe reduces annular area
  • This can increase annular velocity for the same actual return flow

However, drill-pipe selection must also consider:

  • internal diameter
  • pressure loss
  • mechanical strength
  • rig compatibility

Changing pipe size can improve one part of the pneumatic system while worsening another.

104 Annular Area vs Pipe Internal Area

Two different areas matter:

Internal Flow Area

Ai=πDi24

controls compressed-air velocity inside the drill pipe.

Annular Return Area

Aa=π4(Dh2−Dp2)

controls return-flow velocity around the pipe.

Therefore drill-pipe sizing creates a two-sided optimization problem.

105 Larger Pipe — Potential Benefit

A larger internal diameter can reduce:

ΔPstring

for a given flow.

A larger external diameter can also reduce annular area and potentially increase:

Va

for the same actual return flow.

However, the larger pipe also affects:

  • weight
  • rig load
  • handling
  • hole clearance
  • Selection must therefore remain system-based

106 Drill-Pipe Sizing Principle

Do not select drill pipe solely from mechanical strength or outside diameter. Its internal diameter affects pressure delivery, while its outside diameter affects annular return geometry.

Thus:

Drill Pipe=Structural Component+Pressure Conduit+Annular Geometry Component

107 Worked Example T — Internal Pipe Velocity

Suppose actual volumetric flow inside a drill pipe at the evaluated condition is:

Q=0.20m3/s

and internal diameter:

Di=0.075m

Internal area:

Ai=π4(0.075)2

Ai≈0.00442m2

Then:

Vi=0.200.00442

Vi≈45.2m/s

This illustrates why high-flow drill strings can experience significant frictional pressure loss.

108 Example T — Larger Internal Diameter

If internal diameter increases to:

Di=0.090m

then:

Ai=π4(0.090)2

Ai≈0.00636m2

For the same actual volumetric flow:

Q=0.20m3/s

the internal velocity becomes:

Vi=0.200.00636

Vi≈31.4m/s

Compared with the previous 75 mm ID pipe:

45.2m/s→31.4m/s

This illustrates why increasing internal flow area can materially reduce air velocity and potentially reduce frictional pressure loss.

The actual pressure-loss calculation must still account for compressible flow and the complete drill-string geometry.

109 Internal Area Ratio

For the two pipe sizes:

A75≈0.00442m2

A90≈0.00636m2

Therefore:

A90A75=0.006360.00442

≈1.44

The 90 mm internal diameter provides approximately 44% more internal flow area.

This demonstrates why relatively modest diameter changes can materially affect pneumatic performance.

110 Diameter Has a Strong Pressure-Loss Influence

For internal flow systems, pressure loss is highly sensitive to pipe diameter.

The exact relationship for high-pressure compressed air depends on:

  • flow regime
  • density variation
  • pressure
  • temperature
  • pipe roughness
  • fittings
  • compressibility

Therefore:

Do not estimate deep DTH drill-string pressure loss solely from pipe length. Internal diameter can be equally or more important.

111 Drill-String Length Effect

For otherwise comparable conditions:

L↑⇒ΔPstring↑

Therefore the pressure requirement should be recalculated as drilling progresses.

A compressor selected for:

100m

may not necessarily remain adequate at:

  • 400m
  • even when hammer and bit remain unchanged

112 Joint Losses

The drill string is not a perfectly smooth continuous pipe.

It contains:

  • threaded connections
  • internal transitions
  • tool joints
  • possible diameter changes

Therefore:

ΔPstring=ΔPpipe+∑ΔPjoint

where applicable.

For high-flow deep drilling, accumulated local losses can become significant.

113 Leakage Across Drill-Pipe Joints

With increasing depth:

Njoints↑

Therefore potential leakage locations also increase.

Conceptually:

Qhammer=Qcompressor−Qsurface leakage−∑Qjoint leakage

This is why drill-string integrity must be considered in deep-hole compressor sizing.

114 Worked Example U — Leakage Allowance

Suppose calculated useful airflow requirement is:

Quseful=1000CFM

and a controlled design allowance of:

5%

is justified for the specific system.

Then:

Qdesign=1000(1.05)

Qdesign=1050CFM

However, this does not mean known leaks should be accepted.

Known significant leakage should be repaired.

115 Reserve vs Leakage Allowance

These concepts should remain separate.

Leakage Allowance

Accounts for realistic minor system losses where justified.

Operating Reserve

Provides capacity for:

  • changing conditions
  • depth
  • wear
  • uncertainty
  • Do not hide both inside one arbitrary percentage

116 Worked Example V — Combined Airflow Allowances

Suppose:

Quseful=1000CFM

justified minor-loss allowance:

QL=50CFM

and operating reserve:

QR=100CFM

Then:

Qselection=1000+50+100

Qselection=1150CFM

The calculation should show each component separately.

This makes the sizing decision auditable.

117 Airflow Selection Equation

A transparent relationship is:

Qselection=Quseful+Qlegitimate losses+Qreserve

where:

Quseful

must already satisfy the governing hammer and hole-cleaning requirement without double-counting the same air.

118 Pressure selection equation

Use the boundary-defined budget in Section 21. In the static freshwater examples only:

Pselection,g=ΔPh+Pw+ΔPs+ΔPd+ΔPo+PR.

ΔPh is hammer differential pressure, Pw is the assumed exhaust backpressure represented by static head, and PR is the allowance counted once. For a supplier-defined hammer inlet requirement that already includes exhaust conditions, replace the first two terms with that inlet requirement. Confirm the actual manufacturer’s pressure and consumption basis before selecting a machine.

119 Required Pressure Is Dynamic

For depth D:

Pselection=Pselection(D)

because:

ΔPd=f(D)

and:

Pw=f(water conditions)

Therefore the final compressor selection should normally consider the maximum credible operating requirement, not merely the initial drilling condition.

120 Required Airflow Can Also Change

Although hammer consumption may dominate, required effective airflow can change with:

  • bit diameter
  • hammer pressure
  • annular geometry
  • leakage
  • drilling method

Therefore:

Qselection=Qselection(D,geometry,P,tooling)

conceptually.

121 Maximum Requirement Envelope

Define:

Qmax,req=max(Qrequired,1,Qrequired,2,...,Qrequired,n)

and:

Pmax,req=max(Prequired,1,Prequired,2,...,Prequired,n)

But do not automatically combine these two independent maxima into one fictitious operating point.

The maximum airflow and maximum pressure may occur at different drilling stages.

122 Simultaneous Requirement Is What Matters

The actual compressor duty at stage i is:

(Qi,Pi)

Therefore equipment must satisfy every required operating point:

(Q1,P1)

(Q2,P2)

⋯

(Qn,Pn)

The compressor selection envelope should contain all relevant points.

123 Worked Example W — Multi-Stage Requirement

Suppose:

Stage

Airflow

Pressure

Shallow

1100 CFM

18 bar

Intermediate

1100 CFM

24 bar

Deep

1050 CFM

30 bar

Deep + Water

1000 CFM

38 bar

The selected architecture must accommodate the relevant combinations.

A compressor capable of:

1200CFM@20bar

does not automatically satisfy:

1000CFM@38bar

124 Multi-Stage Architecture Decision

The table above may lead to evaluation of:

One High-Pressure Compressor

or:

Primary Compressor + Booster at Depth

or:

Equipment Change by Stage

The preferred architecture depends on:

  • pressure-flow capability
  • project metres
  • changeover cost
  • fuel
  • availability
  • logistics

125 Worked Example X — One Compressor vs Booster

Assume the project requires:

  • First 300 m
  • 1100CFM@24bar
  • Final 150 m
  • 1000CFM@38bar

Two possible architectures:

  • Option A: High-pressure compressor for all 450 m
  • Option B: Primary compressor for complete hole + booster for final 150 m
  • Both may be technically feasible
  • reliability

126 Do Not Select Architecture From Pressure Alone

Even if Option B reaches 38 bar, verify that the booster can process the required:

ṁ

at the actual inlet condition.

Similarly, Option A must provide adequate:

  • Q
  • at 38 bar
  • Pressure capability alone does not establish suitability

127 Compressor Capacity at Working Pressure

For every candidate, obtain:

Q(Pworking)

not simply:

Qnameplate,max

If verified data is unavailable, the selection remains provisional.

Do not invent intermediate pressure-flow performance.

128 Manufacturer Data Gate

Before final equipment approval, obtain where applicable:

  • compressor performance curve/data
  • site derating information
  • hammer airflow curve
  • booster inlet/outlet envelope
  • maximum temperature limits
  • component pressure ratings
  • Manufacturer data confirms whether a specific machine can supply it

129 Field Verification Gate

After mobilization, verify actual:

Pcompressor

Pdrillhead

ROP

Cuttings Return

and, where available:

  • Q
  • Calculated suitability must ultimately be confirmed by safe field performance

130 Compare losses across matching measurement boundaries

Read source and drill-head pressures simultaneously during the same stable duty. Their difference estimates only the losses between those two taps:

ΔPsurface,measured=Psource,g−Pdrillhead,g.

Compare that value with the calculated surface route between the same taps. It does not measure the pressure loss down the drill string or establish pressure at the down-hole hammer. Drill-string loss requires a separately justified calculation or appropriate down-hole measurement. Record tap locations, instrument accuracy, flow estimate and operating state with every comparison.

131 Investigate higher surface loss

If the measured source-to-drill-head loss exceeds the calculated loss for that route, inspect the hose, surface valves, manifolds, fittings, treatment devices where fitted and measurement assumptions. Identify leaking connections and confirm simultaneous readings at the same duty. Assess drill-string restrictions separately because they lie beyond the drill-head pressure tap. Resolve the cause before considering any pressure-setting change.

132 Lower-Than-Expected Pressure Loss

If measured loss is lower than predicted, the system may have more pressure reserve than expected.

However, do not immediately reduce design requirements until:

  • measurement accuracy
  • drilling condition
  • depth
  • airflow
  • are confirmed

133 Pressure Instrument Accuracy

A 2-bar apparent pressure difference may be meaningless if gauges are inaccurate.

Therefore important sizing validation should use suitable instruments with known condition/calibration appropriate to the task.

Measurement quality controls engineering quality.

134 Flow Measurement Challenge

Airflow is often more difficult to measure in field drilling than pressure.

Where direct flow measurement is unavailable, use:

  • verified compressor performance information
  • machine operating data
  • hammer manufacturer consumption data
  • while clearly identifying assumptions
  • Do not convert uncertain flow estimates into false precision

135 Compressor Sizing Confidence Levels

A useful classification is:

  • Preliminary
  • Based on estimated geology/water and nominal equipment data
  • Engineered
  • Based on defined hole geometry, hammer data and calculated losses
  • Verified
  • Supported by actual site measurements and equipment performance
  • This prevents preliminary calculations from being presented as final certainty

136 Worked Example Y — Preliminary Selection

Suppose only these values are known:

  • target depth = 300 m
  • hole diameter = 152 mm
  • approximate hammer class

But the following are unknown:

  • hammer airflow curve
  • drill-pipe ID
  • groundwater head
  • altitude
  • A final compressor size cannot yet be responsibly calculated

The correct output is a preliminary compressor class, with the missing inputs explicitly listed.

137 Missing-Input Rule

Do not manufacture numbers merely to complete a compressor-sizing worksheet.

If a required input is unknown:

MARK IT UNKNOWN

Then determine:

  • whether it can be measured
  • obtained from manufacturer data
  • reasonably bounded
  • This is superior to false numerical precision

138 Bounding Unknown Inputs

Sometimes an unknown can be represented as a range.

Example:

Pw=5 to 12bar

Then calculate:

Prequired,min

and:

Prequired,max

This produces a selection envelope rather than a single unsupported value.

139 Worked Example Z — Water-Head Range

Assume:

ΔPh=20bar

system losses:

∑ΔP=6bar

margin:

2bar

and expected water head:

50m≤h≤120m

Minimum hydrostatic pressure:

Pw,min=0.0981×50

Pw,min≈4.91bar

Maximum:

Pw,max=0.0981×120

Pw,max≈11.77bar

140 Example Z — Pressure Envelope

Minimum required source pressure:

Pmin=20+6+2+4.91

Pmin≈32.91bar

Maximum:

Pmax=20+6+2+11.77

Pmax≈39.77bar

The selection problem is therefore better represented as:

Prequired≈33−40bar

until groundwater conditions are better defined.

141 Sensitivity Analysis

For uncertain variables, determine which one most strongly affects compressor selection.

Potential sensitivity variables include:

  • water head
  • hammer pressure
  • drill-string pressure loss
  • airflow
  • altitude

Focus data-gathering effort on the variables capable of changing the equipment decision.

142 Water-Head Sensitivity

For freshwater:

dPwdh≈0.0981bar/m

Therefore every additional:

10m

of effective water head adds approximately:

  • 0.981bar
  • of hydrostatic pressure
  • This makes water head a highly transparent pressure sensitivity

143 Pressure-Loss Sensitivity

Every avoidable:

1bar

of additional system pressure loss adds approximately:

  • 1bar
  • to required source pressure

This makes pressure-drop control particularly valuable when compressor or booster capability is near its limit.

144 Airflow Sensitivity to Hole Diameter

Annular area is:

Aa=π4(Dh2−Dp2)

Therefore hole diameter enters as a squared term.

A modest increase in bit diameter can produce a much larger increase in annular area.

This can materially change the cleaning-air requirement.

145 Worked Diameter Sensitivity

Assume pipe OD:

Dp=0.102m

152 mm Hole

A152=π4(0.1522−0.1022)

A152≈0.00997m2

178 mm Hole

A178=π4(0.1782−0.1022)

A178≈0.016713m2

203 mm Hole

A203≈0.02419m2

The increase is substantial.

146 Relative Annular Area

Relative to the 152 mm hole:

A178A152≈1.6756

and:

A203A152≈2.43

Thus, for the same actual annular flow:

Va

would fall inversely with these area increases.

This is why “just use a larger bit” can fundamentally alter compressor requirements.

147 Hammer Change Sensitivity

Changing the hammer can change:

Qh(P)

and:

ΔPh

Therefore a compressor calculation tied to one hammer should not automatically be reused for another hammer of similar nominal diameter.

Use the actual hammer manufacturer’s performance data.

148 Bit Change Sensitivity

Changing only bit diameter can alter:

  • annular area
  • cuttings volume
  • cleaning demand

Therefore the compressor may need reassessment even when the hammer remains unchanged.

149 Drill-Pipe Change Sensitivity

Changing pipe geometry alters:

Internal Side

Di→ΔPstring

External Side

Dp→Aa→Va

Therefore drill-pipe change requires both supply-path and return-path recalculation.

150 Depth Change Sensitivity

Increasing target depth changes:

  • drill-string length
  • potential pressure loss
  • joint count
  • water exposure
  • handling time

Therefore a compressor selected for 200 m should not automatically be approved for 500 m merely because the hammer remains the same.

151 Compressor Selection Failure Modes

Incorrect sizing can fail in four principal ways:

Flow-Undersized

Qavailable<Qrequired

Pressure-Undersized

Pavailable<Prequired

Both Undersized

Both conditions fail.

Excessively Oversized

Technically capable but potentially inefficient or uneconomic.

The objective is balanced sizing.

152 Symptoms of Flow Undersizing

Possible symptoms include:

  • compressor unable to maintain desired pressure under hammer demand
  • weak hole cleaning
  • cuttings accumulation
  • poor water lifting
  • low ROP

These symptoms require diagnosis because leakage or restriction can produce similar effects.

153 Symptoms of Pressure Undersizing

Possible symptoms include:

  • hammer performs satisfactorily at shallow depth but weakens as depth increases
  • compressor operates continuously near its pressure limit
  • penetration deteriorates after significant water entry
  • drill-head pressure falls below the hammer’s required operating range
  • hammer becomes intermittent under increasing backpressure
  • adequate cuttings airflow appears available but impact performance remains poor
  • These symptoms do not independently prove compressor pressure undersizing

First verify:

Pcompressor

Pdrillhead

ΔPsystem

and:

Phydrostatic

A restriction or excessive pressure loss can imitate an undersized compressor.

154 Symptoms of Combined Flow and Pressure Undersizing

When both:

Qavailable<Qrequired

and:

Pavailable<Prequired

the drilling system may exhibit:

  • weak hammer action
  • inability to maintain working pressure
  • poor cuttings return
  • low penetration
  • difficulty clearing water
  • compressor operating continuously at maximum load

In this condition, simply adding a booster to an inadequate primary compressor is unlikely to provide a properly balanced solution.

155 Symptoms of Excessive Compressor Capacity

Oversizing may be indicated when:

  • required hammer airflow is substantially below installed capacity
  • the machine spends significant time in inefficient low-demand operation
  • additional CFM provides no measurable ROP improvement
  • rental/ownership cost is disproportionately high
  • fuel/metre is poorer than a correctly sized alternative

However, apparent excess capacity may be intentional reserve for:

  • deeper drilling
  • future water entry
  • larger bits
  • changing hammer requirements
  • Therefore oversizing should be judged against the complete project envelope

156 Compressor Selection Is a Constraint Problem

A candidate compressor must satisfy multiple constraints simultaneously:

Qc≥Qrequired

Pc≥Prequired

Toperating≤Tallowable

Pcomponents≥Psystem,max

and must remain compatible with:

  • hammer
  • booster where applicable
  • rig
  • hoses
  • drill string
  • site conditions
  • Selection therefore cannot be reduced to one specification

157 Minimum Technically Acceptable Compressor

Define the minimum technically acceptable configuration as one that satisfies every required operating point after site correction with justified reserve.

Conceptually:

Cmin=min(C) subject to all technical constraints

This does not necessarily mean the smallest physical compressor.

158 Economic Selection After Technical Qualification

Once several systems pass the technical gate, compare:

Caccepted,m

Faccepted,m

Mday

Availability

Mobilization

Reliability

The preferred project configuration is determined by complete drilling economics, not compressor size alone.

159 Compressor Selection Matrix

Parameter

Candidate A

Candidate B

Candidate C

Site-corrected airflow

—

—

—

Airflow requirement

—

—

—

Working pressure capability

—

—

—

Pressure requirement

—

—

—

Airflow reserve

—

—

—

Pressure reserve

—

—

—

Booster required

—

—

—

Fuel L/h

—

—

—

Expected L/m

—

—

—

Expected ROP

—

—

—

Availability

—

—

—

₹/accepted metre

—

—

—

This provides a transparent technical-commercial comparison.

160 PASS / FAIL Technical Gate

Each candidate should first receive individual technical dispositions:

  • AIRFLOW
  • PASS/FAIL
  • PRESSURE
  • PASS/FAIL
  • SITE DERATING
  • PASS/FAIL
  • HAMMER COMPATIBILITY
  • PASS/FAIL
  • HIGH-PRESSURE CIRCUIT
  • PASS/FAIL
  • BOOSTER COMPATIBILITY — IF APPLICABLE
  • PASS/FAIL

A candidate failing a mandatory technical gate should not proceed as an equivalent economic option.

161 Selection Margin Must Be Transparent

Instead of writing:

“Add 20% safety factor.”

show the actual basis:

Quseful=1000CFM

Qminor losses=50CFM

Qoperating reserve=100CFM

Therefore:

Qselection=1150CFM

Likewise for pressure.

Transparent engineering is superior to unexplained percentages.

162 Do Not Stack Margins Repeatedly

A common sizing error is adding:

  • hammer manufacturer’s allowance
  • consultant allowance
  • compressor reserve
  • contractor safety factor
  • without checking whether they cover the same uncertainty
  • Repeated margins can create severe oversizing

Therefore:

Identify Each Margin Once

and state what it protects against.

163 Worst-Case vs Credible-Case Design

Designing for every imaginable extreme can make the compressor unnecessarily large.

Instead distinguish:

  • Expected Condition
  • Normal project operation
  • Credible Maximum Condition
  • Realistically foreseeable demanding operation
  • Abnormal/Emergency Condition
  • Managed separately where appropriate

The compressor should be selected for the defined engineering envelope, not unlimited hypothetical extremes.

164 Scenario-Based Compressor Sizing

Create scenarios such as:

Scenario A — Dry Hole

Pw=0

Scenario B — Expected Water

Pw=Pexpected

Scenario C — Credible High Water

Pw=Phigh

Calculate:

  • (Q,P)
  • for each scenario
  • This makes the effect of uncertainty visible

165 Scenario Example

Assume:

ΔPh=20bar

∑ΔP=6bar

PR=2bar

Dry

Preq=28bar

50 m Water Head

Pw=4.91bar

Preq≈32.91bar

120 m Water Head

Pw=11.77bar

Preq≈39.77bar

The equipment architecture can change materially across these scenarios.

166 Architecture Decision from Scenario Analysis

The previous example could support evaluation of:

  • Dry Project
  • High-pressure primary compressor alone
  • Moderate Water
  • Higher-pressure compressor or booster evaluation
  • High Water
  • Engineered high-pressure/booster package

The correct architecture depends on how probable and consequential each scenario is.

167 Probability Should Not Be Invented

If groundwater information is insufficient, do not claim:

  • “There is a 70% chance of requiring a booster.”
  • unless defensible project data supports that probability

Instead state:

  • known conditions
  • uncertainty
  • pressure range
  • contingency plan

168 Contingency Planning

When booster need is uncertain, a project may prepare:

  • compatible connection points
  • appropriately rated hose/manifold plan
  • booster availability
  • mobilization procedure

This can reduce emergency delay without necessarily operating the booster from the beginning.

169 Compressor Selection and Mobilization Risk

An undersized compressor can require emergency replacement.

An excessively large compressor can impose unnecessary cost from day one.

Therefore selection balances:

Undersizing Risk

against:

Oversizing Cost

using actual project uncertainty.

170 Selection Confidence Matrix

Input

Confidence

Impact on Selection

Hole diameter

High/Medium/Low

—

Final depth

High/Medium/Low

—

Hammer data

High/Medium/Low

—

Drill-pipe ID

High/Medium/Low

—

Water head

High/Medium/Low

—

Formation

High/Medium/Low

—

Altitude

High/Medium/Low

—

Compressor curve

High/Medium/Low

—

High-impact, low-confidence variables deserve further investigation before equipment commitment.

171 Data Quality Gate

If hammer airflow is unknown:

Qrequired

cannot be finalized.

If water head is unknown:

Prequired

may need to remain a range.

If compressor pressure-flow performance is unavailable:

Qavailable(P)

cannot be verified.

172 Preliminary vs Final Selection

Preliminary Selection

Suitable for:

  • budgeting
  • equipment planning
  • early project discussions
  • Final Engineered Selection

Requires:

  • verified hammer data
  • defined drill-string geometry
  • pressure-loss analysis
  • groundwater assumptions
  • site corrections
  • candidate compressor performance
  • Field-Verified Selection
  • Adds actual drilling measurements
  • This distinction protects engineering integrity

173 Compressor Sizing Calculation Record

Every final selection should retain:

  • input data
  • source of hammer data
  • pressure-loss assumptions
  • groundwater assumption
  • site conditions
  • compressor performance data
  • correction factors
  • reserve basis
  • booster calculation
  • final disposition
  • This allows the calculation to be reviewed later

174 Calculation Revision Control

If the drilling plan changes, issue a revised calculation.

Example:

then:

Do not overwrite the original assumptions without traceability.

175 Unit Control

DTH compressor calculations frequently mix:

  • CFM
  • m³/min
  • psi
  • bar
  • mm
  • inch
  • ft
  • Unit errors can produce major sizing mistakes
  • Therefore every calculation should explicitly state units

176 Basic Flow Conversion

Approximately:

1m3/min≈35.315CFM

Therefore:

QCFM≈35.315Qm3/min

and:

Qm3/min≈QCFM35.315

provided both values refer to equivalent reference conditions.

177 Worked Flow Conversion

Suppose:

Q=30m3/min

Then:

QCFM=30×35.315

Q≈1059CFM

Again, the conversion changes units—not reference conditions.

178 Pressure Conversion

Approximately:

1bar≈14.504psi

Therefore:

Ppsi≈14.504Pbar

and:

Pbar≈Ppsi14.504

179 Worked pressure conversion

For 35 bar, Ppsi=35×14.504≈507.6 psi. Preserve gauge or absolute basis during the conversion. Pressure alone does not establish stored energy; contained volume, gas state and the system boundary also matter.

180 Diameter Conversion

1in=25.4mm

Therefore:

Dmm=25.4Din

and:

Din=Dmm25.4

Use exact dimensional data wherever possible rather than nominal names.

181 Area Calculation Requires Consistent Units

If:

Dh

is entered in metres, then:

Aa

will be in:

m2

Do not mix millimetres and metres inside:

Aa=π4(Dh2−Dp2)

without conversion.

182 Gauge vs Absolute Pressure

Most field pressure gauges display:

Pg

But gas-law and pressure-ratio calculations may require:

Pabs

Approximately:

Pabs=Pg+Patm

Use local atmospheric pressure where higher accuracy is required.

183 Worked Gauge-to-Absolute Example

At approximately sea-level atmospheric pressure:

Pg=20bar

Then:

Pabs≈21bar

This difference becomes particularly important in booster pressure-ratio calculations.

184 Temperature Must Be Absolute in Gas Equations

When using:

P1Q1T1=P2Q2T2

temperature must be expressed on an absolute scale such as kelvin.

Do not insert degrees Celsius directly into gas-law ratios.

185 Celsius to Kelvin

TK=TC+273.15

Example:

30∘C

becomes:

303.15K

186 Absolute-Pressure and Temperature Discipline

Many incorrect compressor calculations arise from mixing:

  • gauge pressure with absolute pressure
  • Celsius with Kelvin
  • FAD with actual flow

Therefore every calculation sheet should state:

Pressure Basis+Temperature Basis+Flow Basis

before equations are applied.

187 Simplified Gas Conversion Example

Suppose a defined free-air reference flow is:

Q1=1000CFM

at:

P1=1bar(abs)

T1=293K

At a hypothetical location where:

P2=10bar(abs)

and:

T2=323K

idealized actual volume is:

Q2=Q1P1P2T2T1

Q2=1000×110×323293

Q2≈110CFM

This demonstrates why FAD and high-pressure actual volume are numerically very different.

188 Simplified Conversion Is Not Full Borehole Modelling

The previous calculation assumes a defined thermodynamic state.

Actual DTH drilling involves:

  • pressure changes through hammer
  • exhaust expansion
  • heat transfer
  • leakage
  • water
  • two-phase cuttings transport

Therefore simple gas-law conversion is useful for understanding but does not replace rigorous borehole-flow modelling where required.

189 Calculation Complexity Should Match Project Risk

For routine shallow drilling, a relatively simple sizing method may be adequate.

For:

  • deep drilling
  • large diameter
  • severe water head
  • very high pressure
  • critical projects
  • more detailed engineering is justified

Do not use either:

  • unnecessary complexity for simple work
  • oversimplified calculations for high-risk work

190 Engineering Escalation Criteria

Escalate to more detailed analysis when:

  • required pressure approaches equipment limits
  • booster operation is required
  • water head is substantial
  • annular cleaning is uncertain
  • drill-string pressure loss is large
  • multiple compressor stages are considered
  • site conditions are severe

191 Compressor Selection Workflow — Master Sequence

The complete workflow is:

DEFINE HOLE

↓

SELECT BIT

↓

SELECT HAMMER

↓

OBTAIN HAMMER Q(P)

↓

CALCULATE ANNULAR AREA

↓

VERIFY CLEANING AIR

↓

ESTABLISH AIRFLOW REQUIREMENT

↓

CALCULATE SURFACE LOSSES

↓

CALCULATE DRILL-STRING LOSSES

↓

CALCULATE WATER HEAD

↓

ESTABLISH PRESSURE REQUIREMENT

↓

CORRECT FOR SITE CONDITIONS

↓

ADD JUSTIFIED RESERVE

↓

CHECK PRIMARY COMPRESSOR

↓

CHECK BOOSTER NEED

↓

VERIFY COMPONENT RATINGS

↓

COMPARE ENERGY + COST

↓

FIELD VERIFY

192 Selection Rule — Airflow

Never select compressor airflow solely from hammer nominal diameter. Use the hammer’s verified air-consumption data and independently verify that the resulting exhaust airflow can provide adequate borehole cleaning for the actual annular geometry.

193 Pressure selection rule

Define the hammer requirement and exhaust condition first. Add only losses and allowances outside that stated boundary. Use Section 21 to distinguish a differential-pressure requirement from an inlet-pressure requirement, and record water/backpressure once.

194 Selection Rule — Booster

Use a booster to solve a demonstrated high-pressure requirement when adequate upstream mass flow exists. Do not use a booster as a substitute for fundamentally insufficient primary airflow.

195 Selection Rule — Depth

Never select a drilling compressor from borehole depth alone. Depth influences the system through drill-string pressure loss, water exposure, leakage opportunity, handling and circulation—not through a universal CFM-or-pressure-per-metre rule.

196 Selection Rule — Water

Use actual or reasonably bounded hydrostatic head, not total hole depth, when calculating groundwater backpressure.

For freshwater:

Pw≈0.0981h bar

with h in metres.

Thus approximately:

50m→4.9bar

100m→9.8bar

150m→14.7bar

200m→19.6bar

These values represent hydrostatic pressure only.

They do not include:

  • hammer pressure requirement
  • drill-string loss
  • hose/manifold loss
  • other restrictions
  • operating reserve

197 Selection Rule — Annular Velocity

Never assume that sufficient air to operate the hammer automatically means sufficient air to clean the borehole.

Verify:

Aa=π4(Dh2−Dp2)

and:

Va=QaAa

using an airflow value appropriate to the thermodynamic conditions at the point being evaluated.

198 Selection Rule — Flow Reference

Never directly compare FAD, SCFM, ACFM and Nm³/min unless their reference conditions are understood and, where necessary, converted to a common basis.

The underlying relationship is mass flow:

ṁ=ρQ

The same mass of air occupies very different volumes at atmospheric and high-pressure conditions.

199 Selection Rule — Pressure Basis

Use gauge pressure for clearly defined field operating values where appropriate, but use absolute pressure for gas-law and compression-ratio calculations.

Approximately:

Pabs=Pg+Patm

and:

PR=Pout,absPin,abs

200 Selection Rule — Site Conditions

A compressor that satisfies the requirement on a reference-condition datasheet does not automatically satisfy the requirement at a hot or high-altitude drilling site.

Verify:

Qavailable,site

and prime-mover capability using equipment-specific correction information.

201 Selection Rule — Reserve

Provide justified operating reserve for credible changes in drilling conditions, but do not repeatedly stack arbitrary safety margins until the compressor becomes grossly oversized.

Every allowance should have a defined purpose.

202 Selection Rule — Pressure Loss

Before purchasing additional pressure capability, identify how much existing compressor pressure is being consumed by avoidable restrictions.

Measure:

ΔP=Pcompressor−Pdrillhead

where practical.

Then determine whether the loss is:

  • necessary
  • expected
  • excessive
  • correctable

203 Selection Rule — Drill Pipe

Treat the drill string as both a structural system and a compressed-air distribution system.

Internal diameter affects:

ΔPstring

while outside diameter affects:

Aa

and therefore:

Va

The two effects must be considered together.

204 Selection Rule — Compressor Catalogue

Do not select a compressor by matching one catalogue CFM number with one hammer CFM number.

The correct selection point is:

(Qrequired,Prequired)

after accounting for:

  • site conditions
  • pressure losses
  • water
  • hole cleaning
  • reserve

205 Selection Rule — Maximum Ratings

Maximum airflow and maximum pressure printed for a compressor should not be assumed to occur simultaneously unless verified by manufacturer performance data.

Use:

Qc(P)

rather than unrelated maximum specifications.

206 Selection Rule — Field Validation

A compressor calculation is not fully closed until actual drilling confirms that the selected system can maintain required hammer performance, hole cleaning, pressure stability and productivity.

Therefore:

CALCULATE → SELECT → COMMISSION → MEASURE → VERIFY.

207 Final Worked Example — Integrated Deep-Hole Calculation

Consider a hypothetical deep DTH project.

Borehole

Dh=165mm

Drill Pipe

Outside diameter:

Dp=102mm

Target Depth

L=350m

Hammer Requirement

For this hypothetical example, assume the hammer differential-pressure requirement is:

ΔPh=20 bar differential

and:

Qh=Qmanufacturer

The airflow value is deliberately left manufacturer-dependent rather than invented.

Effective Water Head

h=100m

Surface Loss

ΔPs=1.5bar

Drill-String Loss

ΔPd=4bar

Other Justified Loss

ΔPo=0.5bar

Operating Margin

PR=2bar

208 Integrated Example — Annular Area

Convert:

Dh=0.165m

Dp=0.102m

Then:

Aa=π4(0.1652−0.1022)

0.1652=0.027225

0.1022=0.010404

Therefore:

Aa=π4(0.016821)

Aa≈0.01321m2

This annular area is then used with the appropriate actual airflow to verify hole-cleaning velocity.

209 Integrated Example — Hydrostatic Pressure

For:

h=100m

Pw=0.0981×100

Pw≈9.81bar

210 Integrated Example — Required Source Pressure

Calculate:

Prequired=ΔPh+Pw+ΔPs+ΔPd+ΔPo+PR

Substitute:

Prequired=20+9.81+1.5+4+0.5+2

Therefore:

Prequired≈37.81bar(g)

This is the approximate source-pressure target under the stated hypothetical assumptions.

211 Integrated Example — Airflow Gate

Assume for this numerical demonstration:

Qh=950CFM

at the selected operating condition for illustration only.

After the annular-cleaning calculation and flow-reference conversion, suppose the engineering assessment establishes:

Quseful=1000CFM

Then justified minor losses:

QL=50CFM

and operating reserve:

QR=100CFM

give:

Qselection=1000+50+100

Qselection=1150CFM

These airflow figures are illustrative; actual hammer and cleaning requirements must use verified project data.

212 Integrated Example — Candidate Primary Compressor

Suppose the site-corrected primary compressor can deliver:

1200CFM

but only up to the required flow at approximately:

25bar(g)

Then:

Airflow

1200>1150

PASS

Pressure

25<37.81

FAIL

The primary compressor is therefore not independently sufficient.

213 Integrated Example — Booster Evaluation

Because upstream airflow is adequate but final pressure is insufficient, a booster can be evaluated.

Required approximate outlet:

Pout≈37.81bar(g)

Primary inlet:

Pin≈25bar(g)

Convert approximately to absolute:

Pout,abs≈38.81bar

Pin,abs≈26bar

Therefore:

PR=38.8126

PR≈1.49

The candidate booster must then be verified for:

  • required inlet mass flow
  • inlet pressure
  • discharge pressure
  • pressure ratio
  • discharge temperature
  • cooling
  • duty cycle

214 Integrated Example — High-Pressure Circuit

Before operation at approximately:

  • 38bar(g)
  • verify all downstream equipment for the actual maximum credible system pressure

This includes:

  • hose assemblies
  • couplings
  • manifold
  • valves
  • swivel
  • drill head
  • drill-string components
  • No calculation can override a component’s approved pressure limit

215 Integrated Example — Site Derating

Suppose the compressor’s catalogue airflow is:

1250CFM

but manufacturer site correction gives:

Ksite=0.96

under the specified conditions.

Then:

Qsite=1250×0.96

Qsite=1200CFM

This is the figure that should be compared with:

Qselection=1150CFM

—not the uncorrected 1250 CFM rating.

216 Separate included allowance from extra capacity

The example selects 1150 CFM, comprising 1000 CFM useful duty, 50 CFM minor-loss allowance and 100 CFM planned operating allowance. The site-corrected candidate supplies 1200 CFM at its stated primary operating point.

Additional capacity above the selection target is 1200−1150=50 CFM, or 50/1150×100=4.35%. This is additional headroom after the 100 CFM allowance already included. Relative to useful duty plus minor losses, total headroom is 1200−1050=150 CFM, or 150/1050×100=14.29%.

These are different denominators, not competing answers. Neither percentage establishes booster-delivered flow or overall package suitability. Verify the coupled compressor and booster duty with common reference conditions and all package losses.

217 Integrated Example — What Could Invalidate the Selection?

The calculation should be revisited if:

  • water head exceeds 100 m
  • target depth increases
  • bit diameter changes
  • hammer changes
  • drill-pipe geometry changes
  • measured pressure loss exceeds 4 bar
  • site conditions differ from the correction basis
  • leakage becomes significant
  • Compressor selection is therefore tied to a defined operating envelope

218 Integrated Example — Higher Water Head

Suppose effective water head later increases from:

100m

to:

150m

Additional hydrostatic pressure:

ΔPw=0.0981(150−100)

ΔPw=4.905bar

New approximate requirement:

Prequired,new=37.81+4.905

Prequired,new≈42.72bar(g)

This may materially alter booster selection and downstream pressure-rating requirements.

219 Integrated Example — Pressure-Loss Improvement

Suppose engineering changes reduce drill-string/system losses by:

2bar

Then:

Prequired,new=42.72−2

Prequired,new≈40.72bar(g)

This illustrates why pressure-loss control can reduce the high-pressure burden even after water conditions worsen.

220 Integrated Example — Final Selection Gate

The configuration is not approved merely because:

Qsite≥Qselection

and:

Pbooster≥Prequired

Also verify:

  • annular cleaning
  • hammer compatibility
  • compressor/booster thermal performance
  • high-pressure component ratings
  • rig capability
  • expected ROP
  • fuel/metre
  • cost/metre
  • field performance
  • This is the complete engineering gate

221 Master Calculation Sheet

For every DTH compressor-selection case, record:

A — Hole

Dh, L

B — Drill String

Dp, Di, Ld

C — Hammer

ΔPh, Qh(P)

D — Annulus

Aa=π4(Dh2−Dp2)

E — Hole Cleaning

Va=QaAa

F — Hydrostatic Head

Pw=ρgh

G — System Losses

ΔPs+ΔPd+ΔPo

H — Required Source Pressure

Prequired=ΔPh+Pw+∑ΔP+PR

I — Required Airflow

Qselection=Quseful+QL+QR

J — Site Correction

Qsite=f(Qrated,Altitude,Temperature)

K — Primary Compressor Gate

Qsite≥Qselection?

Pprimary≥Prequired?

L — Booster Gate

If required:

PR=Pout,absPin,abs

M — Final Verification

safety,

performance,

energy,

economics,

field validation.

222 Compressor Selection Checklist

Before approving a compressor, confirm:

hole diameter defined,

final depth defined,

bit selected,

hammer selected,

hammer airflow curve available,

hammer pressure range available,

drill-pipe OD known,

drill-pipe ID known,

annular area calculated,

hole-cleaning requirement evaluated,

airflow reference basis defined,

surface pressure loss evaluated,

drill-string pressure loss evaluated,

water head evaluated,

hydrostatic pressure calculated,

operating reserve justified,

altitude checked,

temperature checked,

site-corrected compressor capacity established,

pressure-flow operating point verified,

booster requirement evaluated,

booster inlet flow verified,

booster pressure ratio calculated using absolute pressure,

downstream pressure ratings verified,

expected fuel/metre considered,

expected cost/metre considered,

field-verification plan established.

223 Calculation Integrity Checklist

Before releasing the calculation, check:

  • all dimensions use consistent units
  • pressure basis is identified
  • absolute pressure used where required
  • temperature converted to absolute scale where required
  • FAD and actual flow are not confused
  • hammer air is not double-counted as separate cleaning air
  • hole depth is not automatically used as water head
  • catalogue maximum CFM and maximum pressure are not incorrectly combined
  • altitude correction is equipment-specific
  • margins are not duplicated
  • unknown values are identified
  • illustrative assumptions are labelled
  • manufacturer limits remain controlling

224 Final engineering decision

At every required drilling stage, compare site-corrected equipment capability with the simultaneous pressure and flow target. Use one common airflow reference and the pressure boundaries in Section 21. Verify hammer operation and cuttings transport as separate requirements served partly by the same air stream. A numerical capacity comparison is one part of the decision; equipment compatibility, return conditions, ratings and commissioning evidence must also be satisfied.

225 Final Selection Principle

The correct compressor is not the machine with the largest CFM or highest pressure. It is the technically verified compressor—or compressor/booster architecture—that delivers the required mass flow and working pressure at actual site conditions, preserves adequate annular cleaning, operates within all equipment ratings, provides justified reserve, and produces acceptable metres reliably and economically.

In compact form:

HOLE → BIT → HAMMER → AIRFLOW → ANNULAR CLEANING → PRESSURE LOSSES → WATER HEAD → SITE CORRECTION → COMPRESSOR → BOOSTER → FIELD VERIFICATION.

Questions about DTH compressor sizing

Can borehole depth alone determine compressor size?

No. Depth changes drill-string losses, water exposure and operating conditions. Sizing also needs the hammer data, hole and pipe geometry, air demand and a supported pressure-flow operating point.

Should hammer air and cleaning air be added together?

First identify the flow paths and put both requirements on one reference basis. Hammer exhaust can serve hole cleaning. Add only distinct simultaneous consumers and justified losses; confirm that the hammer or approved bypass can pass the required flow.

How is water head used in a pressure calculation?

For an illustrative static freshwater column, pressure is approximately 0.0981 bar per metre. Use the effective column rather than total hole depth. Do not add it again if the stated hammer inlet requirement already includes exhaust backpressure.

Does a booster increase available primary airflow?

A booster raises pressure within its documented operating envelope. It does not remedy a shortage of upstream mass flow. Verify inlet conditions, throughput, losses and final delivered duty for the combined package.

Can maximum CFM and maximum pressure be used together?

Only when manufacturer data confirms that simultaneous operating point for the offered configuration and site conditions. Separate catalogue maxima do not establish the required duty.

What information should accompany a sizing enquiry?

Send hole diameter and target depth, pipe outside and inside diameters, hammer and bit identity, available consumption data, expected water conditions, site temperature and altitude, hose layout, operating hours and the intended duty stages.

Request a duty based compressor proposal

Send the drilling brief, hammer data and available nameplate or layout photographs to reddycompressors@gmail.com. Identify whether the requirement is purchase, rental, booster evaluation or reassessment of an existing package. Reddy Compressors can use the available duty information to guide the next enquiry step. Equipment availability and project suitability require confirmation.