All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Enquiry

Get a quote or ask for help

Tell us what you need: a compressor to buy or hire, service or repair, spare parts, or help with an existing job. A service engineer replies with a quotation or the questions we need answered first.

Give a phone number or an email address (at least one) so we can reply.

We usually respond the same working day; for breakdowns call or WhatsApp +91 99590 60718.

Prefer to talk?

Call or WhatsApp us

For a breakdown or urgent hire, calling is fastest. Send photos of the nameplate and the problem on WhatsApp.

Call +91 99590 60718 WhatsApp us

For an existing enquiry, mention your name and site so we can find it quickly.

After you send it

What happens after you send an enquiry

Every enquiry is read by a service engineer, not routed through a call centre. The engineer checks whether the details are enough to answer properly. If they are, you receive a quotation, a recommended machine or a visit plan. If something important is missing, such as the pressure needed at the point of use or the model and serial number of an existing compressor, you receive a short list of questions first, because a quotation built on a guess usually costs more later.

  1. Review. The engineer reads the duty, the photos and any nameplate details you uploaded.
  2. Clarify. We confirm anything that changes the answer: flow at working pressure, operating hours, site power, air quality or delivery date.
  3. Propose. You receive the machine, part, hire package or service scope, with the figures it is based on.
  4. Deliver and follow up. After supply, hire, service or repair, we check that the result works on site and record it for the next visit.

For a breakdown, do not wait for the form: call or WhatsApp +91 99590 60718 or +91 92468 88812 and send a photo of the nameplate and the fault.

Get an exact answer first time

What to send for each type of request

The fastest enquiries carry the figures an engineer would otherwise have to ask for. Use this table as a checklist.

RequestDetails that decide the answer
New compressor or sizingWhat the air operates, pressure needed at the point of use in bar or psig, flow if known in cfm or m³/min, running hours per day, air quality needed and site power
Rental airFlow and pressure, start date and duration, site location, diesel or electric preference, hose length and whether dry or oil-free air is needed
Service, AMC or overhaulMake, model, serial number, running hours, the fault or the service due, and photos of the nameplate and controller display
Spare partsMake, model and serial number, the part name or old part number, a photo of the part and the quantity
Air treatment or piping reviewCompressor and dryer details, the air-quality class the users need, the pressure lost between compressor and users, and a simple layout
Borewell or DTH air dutyHole diameter, target depth, hammer size, expected water level, site location and working period
Used or refurbished compressorThe duty, pressure, preferred drive and budget timing, and whether you need a test at working pressure before dispatch

Example of an enquiry that can be quoted at once: “Rental for a six-week plant shutdown at Kakinada: 450 cfm at 10 bar (145 psig), electric supply available, 60 m of hose to the header, refrigerated-dryer air needed, start 1 March.” Compare that with “need 450 cfm compressor”, which leaves pressure, power, air quality, duration and delivery open.

Who you are dealing with

What Reddy Compressors supplies and supports

Reddy Compressors works from Tarnaka, Secunderabad, as an independent multi-brand compressor specialist. We are not a single-brand dealer: we supply, rent, service and source spares across all major makes, with tie-ups with the leading brands and a team of more than 20 service engineers and technicians.

  • Sales: new compressors, including brand-new machines for long-term projects, and air treatment matched to the duty.
  • Rental: our own fleet from 50 to 2,000 cfm at 2–30 bar (29–435.1 psig), diesel and electric, serviced every 300 running hours while on hire.
  • Borewell and DTH: drilling compressors of 600–1,500 cfm at 200–400 psig (13.8–27.6 bar), with special units up to 35 bar (507.6 psig), for sale, hire, service and spares.
  • Used and refurbished: machines sold with a six-month warranty from delivery on the whole compressor, excluding consumables, misuse, service by others and site damage.
  • Service, AMC and overhaul: for compressors above 10 hp; small 2–10 hp units are for sale and hire only.
  • Specialist equipment: gas compressors (CNG, nitrogen, process gas and boosters), centrifugal compressors, blowers and vacuum pumps, with spares; for axial compressors we provide service and spares.

Where and when

Coverage, hours and contact details

We serve all of Telangana and Andhra Pradesh, every district within about 300 km of Hyderabad, and supply equipment and spares across India. Project work further afield is planned case by case.

Phone and WhatsApp+91 99590 60718 (primary) and +91 92468 88812
Emailinfo@reddycompressors.com and info@reddycompressors.com or reddycompressors@gmail.com
Hours8:30 am to 8:30 pm, seven days a week
BaseTarnaka, Secunderabad, Telangana

Existing jobs

Following up an existing job or raising a concern

To follow up a quotation, hire, service visit or part order, send your name, company, site and the approximate date of the original request, and add the machine’s serial number where one is involved. That lets us find the record at once and reply with the current status rather than a general answer.

If a result is not what you expected, such as a pressure that does not hold, a part that does not fit or a hire machine that is not performing, tell us what you measured and when. A service engineer reviews it against the original duty, and unresolved concerns go to the managing partner. We would rather hear about a problem early, while it is still simple to put right.

Photos that save a visit

How to photograph a compressor nameplate and fault

A sharp nameplate photo identifies the make, model, serial number, rated pressure, free air delivery and motor rating in one image, and it is the single most useful thing you can send. Most delays in parts and service come from a blurred, cropped or reflective photo, so take a few seconds over it.

  • Nameplate: stand square to the plate, avoid flash glare, include the whole plate and wipe off oil or dust first. If the plate is faded, also photograph the airend and motor plates.
  • Controller display: photograph the running hours, the latest alarm or fault code and the pressure and temperature readings while the machine runs, if it is safe to do so.
  • The fault itself: a leaking joint, a cracked pipe, an oily separator, a clogged cooler or a damaged part, with something in the frame for scale.
  • The installation: one wide photo of the compressor room or site showing ventilation openings, the receiver, dryer and the pipe leaving the room.
  • A short video: 15–20 seconds of an unusual noise, knocking or vibration often tells an engineer more than a description.

Never open panels, remove guards or work on a pressurised or energised machine to take a photo. If the nameplate can only be reached by doing so, send what is safely visible and we will read the rest on site.

Before the engineer arrives

Preparing for a service or site visit

A visit is most productive when the engineer can see the machine running, read its history and reach it safely. A little preparation turns a diagnostic visit into a repair visit.

PrepareWhy it matters
Safe access, isolation points and a person who knows the plantWork can start at once, and isolation is done to your site rules
The service history, last oil and filter change and running hoursShows whether a fault is wear, a missed service or a new problem
Normal pressure, temperature and dew-point readingsGives the engineer a healthy reference to compare against
A note of when the fault started and what changedNew production, hotter weather, a new pipe or a different oil are common triggers
Permission to run the machine on loadMany faults, such as high temperature or slow pump-up, only show under load

For hire jobs, confirm the delivery route, the ground where the machine will stand, power or fuel arrangements, and where the hose will connect to your system. For borewell work, add the rig location and access for a truck. These details let us bring the right hoses, fittings and treatment the first time.

Questions

Customer support questions

How quickly will I get a reply?

We usually respond the same working day. For a breakdown, calling or sending a WhatsApp message to +91 99590 60718 is faster than the form.

Do I need to know the cfm I need?

No. Tell us what the air operates, the pressure it needs and how long it runs; the engineer works out the flow. If you know the flow, give it with its pressure, because a cfm figure without pressure cannot be compared.

Can you supply outside Telangana and Andhra Pradesh?

Yes. We supply compressors, spares and rental packages across India, and plan service for projects outside our regular area case by case.

Which makes do you work with?

All major makes, including ELGi, Atlas Copco, Ingersoll Rand, KAESER and Chicago Pneumatic, as an independent multi-brand specialist.

Can I send photos instead of typing details?

Yes. Upload up to three photos or PDFs with the form, or send them on WhatsApp. A clear nameplate photo often answers half the questions at once.