
Abrasive blasting is one of the most air-hungry jobs a portable compressor does. It needs a large, steady volume, a pressure at the nozzle that does not sag as the shift goes on, and air that is cool and dry enough not to clog the pot or wet the steel before it is painted. Reddy Compressors hires diesel and electric compressors for blasting and surface preparation, with the hoses and moisture control sized to the job, from our base in Secunderabad to sites across Telangana, Andhra Pradesh and the rest of India.
How much air does a sandblasting nozzle use?
Air consumption is fixed by the nozzle bore and the pressure at the nozzle. The bore is a choked orifice: at a given pressure it passes a given volume, whatever compressor is behind it. Double the bore and the area, and the air, roughly quadruples. Raising pressure also raises flow, roughly in proportion to absolute pressure. That is why nozzle choice, not the size of the job, decides the compressor.
| Nozzle number | Bore (approx.) | Typical air use at 7 bar (101.5 psig) at the nozzle | Typical compressor for one nozzle |
|---|---|---|---|
| No. 4 | 1/4 in, about 6 mm | About 80 cfm | Around 120 cfm |
| No. 5 | 5/16 in, about 8 mm | About 140 cfm | Around 210 cfm |
| No. 6 | 3/8 in, about 9.5 mm | About 200 cfm | 300 cfm at 7–8 kg/cm² |
| No. 7 | 7/16 in, about 11 mm | About 255 cfm | Around 385 cfm |
| No. 8 | 1/2 in, about 12.5 mm | About 340 cfm | Around 510 cfm |
These are typical published values for new nozzles. Treat them as a starting point, not a guarantee, and check the nozzle maker’s chart for the exact pressure you plan to run.
Why the compressor must be bigger than the nozzle figure
- Nozzle wear. Bores open up with use, especially with hard mineral and steel abrasives. A nozzle worn by one size uses the air of the next size up, and a worn No. 6 can approach No. 7 consumption. Many contractors replace a nozzle when it has worn about 1.5 mm (1/16 in) over its original bore.
- Air-fed helmets and accessories. Supplied-air helmets, pot pressurisation, remote-control valves and air-driven dust collectors all take a share.
- Losses. Couplings, leaking gaskets and long hose runs waste air and pressure.
- Site conditions. Rated free air delivery (FAD) is stated at reference conditions. In a Telangana or coastal Andhra summer, high ambient temperature and dust load make a margin sensible.
A practical rule is to add 25–50% to the new-nozzle figure. Two No. 6 nozzles at about 200 cfm each are about 400 cfm on paper; a compressor of about 500–600 cfm gives room for wear, and about 750 cfm also covers long hoses and air-fed helmets. Our abrasive blasting air demand calculator walks through the same arithmetic.
Why pressure at the nozzle matters more than pressure at the compressor
Blasting productivity rises with nozzle pressure. As a widely quoted rule of thumb, every 1 psi lost at the nozzle costs about 1.5% of blasting productivity, so a drop from 100 psig to 85 psig (about 7 to 5.9 bar) can cut the area cleaned per hour by around a fifth. The compressor gauge can read 7 bar while the operator is working at 5.5 bar. Pressure is lost in:

- the air hose from the compressor to the blast pot, in proportion to its length and very steeply with smaller bore;
- the pot itself, its inlet valve, metering valve and moisture separator;
- the blast hose from pot to nozzle, which carries abrasive as well as air;
- every coupling, reducer and partly closed valve along the way.
The fix is usually not a bigger compressor. It is a larger-bore supply hose, fewer couplings and the pot placed sensibly. The best way to know is to measure: a hypodermic needle gauge inserted into the blast hose just behind the nozzle shows what the nozzle actually sees. Where the hose run is long or the coating specification calls for higher pressure, we can supply a compressor rated for 8.6–10 bar (124.7–145 psig) and set the delivery pressure to make up for the run, within the hose and pot rating.
How should air and blast hoses be sized?
As a general guide, the air supply hose should have an inside diameter of three to four times the nozzle bore, and the blast hose about three to four times as well. Under-sized hose is the most common cause of a crew blaming the compressor.
| Nozzle | Air supply hose (compressor to pot), typical minimum bore | Blast hose (pot to nozzle), typical bore |
|---|---|---|
| No. 4–5 | 1 in (25 mm); 1¼ in for long runs | 1 in (25 mm) |
| No. 6 | 1¼ in (32 mm) | 1–1¼ in (25–32 mm) |
| No. 7–8 | 1½ in (38 mm) or larger | 1¼–1½ in (32–38 mm) |
| Two or more nozzles | 2 in (50 mm) header to a manifold, then individual hoses | Per nozzle, as above |
Keep the blast hose as short as the work allows, typically not much more than the reach needed, because abrasive-laden air loses pressure faster than clean air. Use claw or blast couplings rated for the pressure, with safety pins or clips and whip checks at every joint. More on layouts is on our hoses, manifolds and distribution page.
Moisture: aftercoolers, separators and dryers
Air leaves a screw compressor hot and fully saturated. An oil-injected screw element typically discharges at about 75–95 °C before its oil cooler and built-in air cooler; even after that the air is warm and carries water vapour. As it cools in the hose and the pot, water condenses. In the blast pot that water makes abrasive clump, bridges in the metering valve, causes surging and stoppages, and leaves a damp, flash-rusting surface that harms coating adhesion.

The treatment ladder
- Aftercooler. Cools the discharge close to ambient so most of the water condenses before the hose rather than in the pot. Many portable compressors can be supplied with an integrated aftercooler; otherwise a separate unit is used. See portable aftercoolers.
- Moisture separator with a working drain. Removes the condensed water and oil droplets. A separator without a drain that is checked is only a water tank.
- Line filter and pot drain. Catches what is left and lets the operator purge the pot during breaks.
- Refrigerated dryer. Where the coating specification calls for dry air, a dryer gives a typical pressure dew point around +3 °C, well below the steel temperature on almost any Indian site.
- Desiccant dryer. Rarely needed for blasting itself, but used where the same air also feeds very sensitive coating or instrument duties; typical dew points are −20 °C or −40 °C.
Coating inspectors usually check the steel against the dew point and require the surface to be at least 3 °C above the ambient dew point before blasting and coating. Dry blast air does not replace that check, but wet blast air will fail it for you. Humid coastal sites such as Visakhapatnam, Kakinada and Chennai need the most care. Drain the separator and pot through the shift and keep the aftercooler fins clean.
Diesel or electric compressor for blasting?
| Factor | Portable diesel compressor | Electric compressor |
|---|---|---|
| Best for | Open sites, tank farms, pipelines, bridges, plant shutdowns without spare power | Fabrication yards, blasting booths and workshops with a reliable supply |
| Mobility | Towable or skid; moves with the work front | Usually fixed for the hire |
| Running needs | Fuel planning, daily checks, exhaust kept away from helmet air intakes | Correctly rated cable, starter and supply capacity |
| Hazardous areas | Needs the site’s permit and spark/exhaust controls in refineries and petroleum installations | Motor and starter must suit the area classification |
Our diesel or electric rental air page covers the choice in more detail.
Common problems on blasting jobs and their usual causes
- Weak blast, slow production: nozzle worn oversize, supply hose too small or too long, compressor too small for the number of nozzles, or a partly closed valve.
- Surging or stopping abrasive flow: wet air, damp abrasive, metering valve set wrong or blocked by debris.
- Water at the nozzle: no aftercooler, separator not drained, or a hose run that cools the air after the separator.
- Compressor unloading or tripping on temperature: blocked cooler in dusty air, poor ventilation around the machine, or running in direct afternoon sun with doors open the wrong way.
- Oil traces on the surface: separator element or scavenge problem on the compressor, or a missing coalescing filter where the specification needs one.

Typical blasting applications we support
- Surface preparation of steel structures, tanks, pipelines, pressure vessels and structural steel before painting.
- Corrosion-protection work in steel plants, refineries and petroleum installations, often round the clock during shutdowns.
- Fabrication yards preparing new steel to a specified cleanliness grade before primer.
- Restoration of concrete, stone and brick, where lower pressures and finer media are common.
- Rail, ship and heavy-equipment refurbishment.
Safety essentials
Abrasive blasting is hazardous work. Operators need supplied-air respiratory protection, and that breathing air must be clean and taken from a point away from engine exhaust. Use hoses rated for the working pressure, couplings with safety pins and whip checks, and a deadman control at the nozzle. Earth the blast hose and pot to discharge static. Follow the site’s permit-to-work, dust control and abrasive disposal rules, especially inside refineries and steel plants.
Nozzle air use at other pressures, and as the nozzle wears
A blast nozzle runs choked: the air reaches sonic speed in the throat. Flow then depends on throat area and the absolute pressure upstream, so it rises in proportion to bar a, not bar g, and with the square of the bore.
The table gives the air-consumption figures commonly published in blasting equipment charts for new nozzles. Charts from different makers differ by up to about 15%, so use the chart for the nozzle you are running where you have it. Worn nozzles use more air than these figures.
| Nozzle (new bore) | 80 psig (5.5 bar g) | 100 psig (6.9 bar g) | 125 psig (8.6 bar g) |
|---|---|---|---|
| No. 4 (1/4 in, 6.4 mm) | about 68 cfm | about 81 cfm | about 98 cfm |
| No. 5 (5/16 in, 7.9 mm) | about 113 cfm | about 137 cfm | about 168 cfm |
| No. 6 (3/8 in, 9.5 mm) | about 161 cfm | about 196 cfm | about 237 cfm |
| No. 7 (7/16 in, 11.1 mm) | about 217 cfm | about 254 cfm | about 314 cfm |
| No. 8 (1/2 in, 12.7 mm) | about 280 cfm | about 338 cfm | about 409 cfm |
| Factor relative to 100 psig | 0.82 | 1.00 | 1.21 |
The pressure factors follow the absolute-pressure rule: (80 + 14.7) ÷ (100 + 14.7) = 0.83 and (125 + 14.7) ÷ (100 + 14.7) = 1.22, within about 1–2% of the chart ratios.
Checking the chart against the physics
The choked-flow relationship for air is mass flow (kg/s) = 0.0404 × A × P ÷ √T, where A is the throat area in m², P is the upstream pressure in pascals (absolute) and T is the air temperature in kelvin. For a perfect No. 6 throat (9.525 mm bore) at 7 bar g, with air at 30 °C:
- A = π ÷ 4 × 0.009525² = 7.13 × 10⁻⁵ m²
- P = (7 + 1.01325) × 10⁵ = 8.013 × 10⁵ Pa; √303.15 = 17.41
- Mass flow = 0.0404 × 7.13 × 10⁻⁵ × 8.013 × 10⁵ ÷ 17.41 = 0.1326 kg/s
- Free air at 1.01325 bar a and 20 °C has a density of 1.204 kg/m³, so 0.1326 ÷ 1.204 × 60 = 6.6 m³/min, about 233 cfm
That is the ideal ceiling. The published 196 cfm at 100 psig is about 85% of the ideal figure at the same pressure, because a real nozzle entry and bore are not perfect and the abrasive stream takes up part of the throat. For sizing, start from the published figure: a new No. 6 nozzle at 7 bar g (101.5 psig) uses about 196 × (101.5 + 14.7) ÷ (100 + 14.7) = about 199 cfm, so call it 200 cfm, and then add margin for wear, helmets and losses.
Two practical consequences follow:
- Wear: a No. 6 nozzle worn to No. 7 bore has (11.11 ÷ 9.525)² = 1.36 times the throat area, and the published charts give 254 ÷ 196 = 1.30 times the air. Either way, a worn nozzle uses roughly 30–36% more air. Gauge the bore with a drill shank or nozzle gauge every shift, and replace the nozzle when it has worn about 1.6 mm (1/16 in) oversize. Otherwise the compressor runs out of air and nozzle pressure falls.
- Raising pressure costs air: going from 100 to 125 psig (6.9 to 8.6 bar g) at the nozzle raises air use by about 21%. It also raises cleaning rate, so it is usually worth it, but only if the compressor has the margin.
Supply hose pressure drop: a worked comparison
The hose sizing guidance above sets minimum sizes. The figures below show why. Pressure drop in a hose rises with roughly the 1.85th power of flow, rises in direct proportion to length, and falls with the fifth power of bore. A widely used estimate is Δp (bar) = 1.6 × 10⁸ × Q¹·⁸⁵ × L ÷ (d⁵ × p), where Q is free air in m³/s, L is length in metres, d is bore in mm and p is the inlet pressure in bar a.
For a single new No. 6 nozzle drawing 200 cfm (0.0944 m³/s) through 30 m of 1 in (25.4 mm) supply hose at 8.013 bar a, the drop is about 0.72 bar.
| Supply hose bore, 30 m length | 200 cfm (one No. 6, new) | 255 cfm (one No. 6 worn to No. 7 bore) | 400 cfm (two No. 6, new) |
|---|---|---|---|
| 1 in (25 mm) | about 0.72 bar | about 1.1 bar | about 2.6 bar |
| 1¼ in (32 mm) | about 0.24 bar | about 0.37 bar | about 0.85 bar |
| 1½ in (38 mm) | about 0.10 bar | about 0.15 bar | about 0.34 bar |
| 2 in (51 mm) | about 0.02 bar | about 0.04 bar | about 0.08 bar |
These figures are for smooth bore with no fittings. Rubber hose, claw couplings and a moisture separator add more, so treat them as minimums.
Applying the rule of about 1.5% productivity per psi lost, the 0.72 bar lost in a 1 in hose is 10.4 psi, or roughly 16% of the blaster’s output. Moving up one size to 1¼ in cuts the drop by a factor of 1.25⁵ = 3.05. The blast pot, metering valve and blast hose take a further pressure loss, often 0.3–0.7 bar, which is why the compressor discharge setting usually needs to be about 1 bar above the target nozzle pressure. Check with a needle gauge in the blast hose just behind the nozzle, while blasting.
How much water a blasting compressor makes, and breathing air
A moisture problem is easier to solve once you see the quantity. Take a 750 cfm compressor (21.24 m³/min) drawing air at 35 °C and 80% relative humidity, a typical monsoon afternoon.
- Saturation vapour pressure at 35 °C is 5.63 kPa, so the partial pressure is 0.8 × 5.63 = 4.50 kPa. The moisture content is 0.622 × 4.50 ÷ (101.325 − 4.50) = 0.0289 kg of water per kg of dry air.
- Dry-air flow is about 1,395 kg/h, so the air carries 1,395 × 0.0289 = about 40 kg (40 litres) of water an hour into the compressor.
- Compressed to 8.013 bar a and cooled to 45 °C in an aftercooler, saturated air can hold only 0.622 × 9.59 ÷ (801.3 − 9.59) = 0.0075 kg/kg. About 30 litres an hour therefore condense, and the separator must drain them. About 10.5 litres an hour still pass downstream as vapour.
- A refrigerated dryer at a +3 °C pressure dew point leaves only about 0.8 litres an hour as vapour.
Without an aftercooler, air leaves the compressor hot, and most of that 30 litres an hour condenses in the hose and pot instead, which causes the surging and clogging described above. Over an 8-hour shift, that is about 240 litres of water.
Breathing air for the blaster
Supplied-air blast helmets typically need about 10–20 cfm (0.28–0.57 m³/min) each, at the flow and pressure the helmet maker specifies. Allow for this in compressor sizing. ISO 8573-1 classes do not make air breathable. Breathing air needs a dedicated filter train and limits on carbon monoxide, oil, water and odour, taken from the breathing-air standard your site follows (for example EN 12021).
- Place the compressor upwind of the blasting area and away from vehicle and generator exhausts. A diesel compressor must never be allowed to draw in its own exhaust.
- Oil-injected and oil-lubricated compressors that overheat can produce carbon monoxide. Fit a carbon monoxide monitor with an alarm on the breathing-air line, and keep the high-temperature shutdown working.
- Use a breathing-air filter with a coalescing stage and an activated-carbon stage, and keep a separate low-pressure regulator and gauge for the helmet line.
Production rate, abrasive use and hire duration: a worked plan
Hire periods are best set from nozzle-hours, not calendar guesses. Use your own trial-patch rates once blasting starts, and adjust the plan.
| Planning input | Typical range, No. 6 nozzle at 7 bar g | What moves it |
|---|---|---|
| Cleaning rate to Sa 2½ | Light rust or loose scale about 10–15 m²/h; tight mill scale, heavy pitted rust or old coatings about 4–8 m²/h | Nozzle pressure, abrasive type and size, access, blaster skill |
| Abrasive flow | About 450–550 kg/h for expendable mineral abrasives | Metering valve setting, abrasive density |
| Arc-on time | About 55–70% of shift time | Pot refills, moving staging, inspection, breaks |
| Diesel use, 750 cfm-class compressor | About 28–36 L/h at blasting load | Load, ambient temperature, altitude, engine condition |
Worked example (illustrative): 2,000 m² of lightly rusted tank shell is to be blasted to Sa 2½ with two No. 6 nozzles, using a 12 m²/h rate taken from a trial patch.
- Nozzle-hours = 2,000 ÷ 12 = 167.
- Abrasive = 167 × 500 kg/h = about 83 tonnes, or about 42 kg/m². Plan delivery and dry storage, because damp abrasive bridges in the pot.
- Output per single 8-hour shift = 2 nozzles × 8 h × 0.65 arc-on × 12 m²/h = 124.8 m², so the job takes 2,000 ÷ 124.8 = about 16 working days.
- Engine hours = 16 days × 8 h = 128 h. At an assumed 32 L/h, that is about 4,100 litres of diesel. Plan tanker refills around the shift, not during it.
- Add days for weather. Blasting stops when the steel is less than 3 °C above the dew point, which can be common on monsoon mornings. Add days for coating hold points as well, then book the compressor for the whole window, with the service interval falling inside it.
Running two shifts halves the calendar time but doubles the daily fuel and abrasive logistics. Confirm that the coating crew can keep pace before you commit.
How Reddy Compressors helps
We are an independent multi-brand compressor specialist, serving industry since 2002 from Tarnaka, Secunderabad. We hire out compressors from our own fleet of diesel portables and high-pressure units, within a rental range of 50–2,000 cfm and 2–30 bar, and our service team of over 20 service engineers and technicians covers Telangana and Andhra Pradesh. Rentals are supplied across India.
For a blasting job we:
- size the compressor from your nozzles, number of operators, hose runs and specification, not from a guess;
- supply air hoses, couplings and manifolds to suit the flow and distance;
- arrange aftercoolers, moisture separators, filters and dryers where the job needs them;
- deliver, start up and collect, and service the machine during the hire, with operators where agreed.
Coating contractors are a large part of this work. Our projects include a 450 cfm diesel portable on round-the-clock hire for a corrosion-protection contractor at a steel plant in Andhra Pradesh, with operators on 12-hour shifts and maintenance in our scope, and work for the same type of contractor at an oil refinery and a petroleum installation. On hire jobs we change oil and service every 300 running hours. Blast pots, abrasive, nozzles and PPE are normally the contractor’s scope unless agreed in the rental proposal. See all compressor rentals.
What to send us
- Number of nozzles running at the same time, their size and the abrasive.
- Pressure you want at the nozzle, and any coating specification or dew-point requirement.
- Hose lengths from compressor to pot and from pot to nozzle.
- Site location, any hazardous-area or permit rules, and whether power is available.
- Hire period, shifts per day and whether you need our operators.
Call +91 99590 60718 or +91 92468 88812, WhatsApp +91 99590 60718, or email info@reddycompressors.com or reddycompressors@gmail.com. Our office is at Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017.
Frequently asked questions
What size compressor do I need for sandblasting?
Start from the nozzle. A No. 6 (3/8 in) nozzle at 7 bar uses about 200 cfm when new and about 30% more once worn one size, so one nozzle is normally run from a 300 cfm compressor at 7–8 kg/cm² (about 6.9–7.8 bar), and two need about 500–600 cfm. Add margin for nozzle wear, air-fed helmets and hose losses. A No. 8 nozzle on its own uses roughly 340 cfm when new, which calls for a compressor of about 510 cfm.
What pressure is best for sandblasting steel?
Most steel blasting is done at about 6.9–7 bar (100.1–101.5 psig) measured at the nozzle, and some specifications allow higher pressure for hard coatings or mill scale. The key point is the pressure at the nozzle, not at the compressor. Check it with a needle gauge behind the nozzle. Lower pressures with finer media suit softer substrates such as concrete, brick and stone.
Why is water coming out of my blast nozzle?
Hot, saturated air is cooling in the hose and pot and the water is not being removed. Usually there is no aftercooler, the moisture separator is not being drained, or the separator sits too close to the compressor so the air keeps cooling after it. Fit an aftercooler and separator, drain them and the pot through the shift, and add a dryer if the coating specification asks for dry air.
How long can a sandblasting hose be?
There is no single limit, but every metre costs pressure. Keep the blast hose between pot and nozzle as short as the work allows, because abrasive-laden air loses pressure quickly. Long distances are better covered with a larger-bore air supply hose to the pot, with the pot placed near the work. If the run is unavoidable, a higher-pressure compressor can make up the loss within the hose rating.
Do I need an air dryer for sandblasting?
Not always. An aftercooler and a well-drained moisture separator handle most jobs. A refrigerated dryer, with a typical pressure dew point around +3 °C, is worth adding when the coating specification requires dry air, on humid coastal sites, or when high-performance coatings are being applied the same day. Desiccant dryers are rarely needed for blasting alone.
Can you supply a compressor for round-the-clock blasting during a shutdown?
Yes. For 24-hour work we size the machine with margin, plan fuel and servicing around the shifts, and can provide operators where agreed. Servicing on hire is done every 300 running hours. Tell us the shutdown dates, the number of nozzles per shift and any refinery or plant permit conditions, so the machine and its paperwork are ready before mobilisation.
What sandblasting equipment do I need to rent for a blasting job?
A complete blasting set has an air supply side and a blasting side. The air supply side is a compressor sized from the nozzle, an aftercooler and moisture separator, a refrigerated dryer if the coating specification calls for dry air, and correctly sized supply hose. The blasting side is the blast pot with metering valve, the blast hose, nozzle and deadman control, plus a supplied-air helmet with a breathing-air filter. Tell Reddy Compressors the nozzle size, number of nozzles, hose lengths and which items you already own, so the compressor and air treatment are matched to the rest. Blast pots, abrasive, nozzles and PPE are normally the contractor’s scope.
How many days of compressor hire do I need for a blasting job?
Work it out from nozzle-hours. Divide the area by a cleaning rate measured on a trial patch to get nozzle-hours, then divide by the number of nozzles and by the effective blasting hours per shift. Blasting usually runs about 55–70% of shift time once pot refills and staging moves are counted. For example, 2,000 m² at 12 m²/h is about 167 nozzle-hours. With two nozzles on single shifts, that is about 16 working days. Then add days for weather, dew-point stoppages and coating hold points.
How much abrasive does compressor blasting use per hour?
A No. 6 nozzle at 7 bar g typically passes about 450–550 kg of expendable mineral abrasive an hour, depending on abrasive density and the metering valve setting. On rusted steel blasted to Sa 2½, that often works out at roughly 30–50 kg per square metre. Reduce consumption by setting the metering valve on a trial patch, not by eye, and by keeping nozzle pressure up. Low pressure wastes abrasive, because each particle strikes with less energy and more passes are needed.
Can the blasting compressor also supply breathing air to the blaster?
It can supply the air, but not straight from the compressor outlet. Breathing air needs a dedicated breathing-air filter with coalescing and activated-carbon stages, its own regulator, and a carbon monoxide monitor with an alarm. The compressor must sit upwind of exhaust fumes and blasting dust. Air from an overheated oil-injected compressor can contain carbon monoxide, so keep temperature shutdowns working. ISO 8573-1 classes on their own do not make air fit to breathe.
Related pages
- Abrasive blasting nozzle and air supply
- Blast pot and compressor interface
- Temporary air for blasting
- Aftercooling, moisture separation and condensate removal
- Diesel portable compressors
- How to brief us on a rental
- Air compressor on rent in Hyderabad
- Diesel portable compressors for sale, new and used
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.
Abrasive blasting air demand
Estimate the air a blast nozzle takes, so the compressor and hose can be chosen to hold pressure at the nozzle.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Nozzle bore (mm): 8
- Pressure at the nozzle (bar g): 7
- Discharge coefficient: 0.9
- Number of nozzles: 1
- Allowance for pot, hose and leaks (%): 10
Result
- Air demand, new nozzle: 4.69 m³/min = 166 cfm
- Nozzle number (bore in 1/16 inch): 5
- Air demand when worn one size (1/16 in larger bore): 6.74 m³/min = 238 cfm: size the compressor for this, then replace the nozzle
Method. Nozzle air treated as orifice flow at the nozzle pressure: free air = Cd × A × choked mass flow ÷ ρ₀. Venturi nozzles with an effective Cd near 0.9 are typical; use the supplier value. Add flow for the pot and for leaks. Nozzle numbers are the bore in sixteenths of an inch (No. 6 = 3/8 in = 9.5 mm). A nozzle wears larger in use, so size the compressor for the nozzle worn one size and replace it at that point.
What to take from it. A worn nozzle passes more air for less work. Check bore wear and keep the pressure at the nozzle, not at the compressor.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 7 November 2026. How our engineering content is reviewed.