All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

About

How Reddy Compressors works

10 min read13 sections

Why we start with the job, not the machine

Most compressor enquiries begin with a fragment of the requirement. Someone asks for “450 cfm on rent”, “a 50 hp screw compressor”, “a borewell compressor” or “this filter urgently”. Each of these is a useful starting point, but none of them is yet a complete technical requirement.

Two enquiries with the same nominal flow can need completely different machines. A plant that needs 500 cfm of utility air at 7 bar (101.5 psig) for a single shift is a very different duty from a drilling contractor who needs 500 cfm at 17 bar (246.6 psig) round the clock in 45 °C summer heat. The pressure differs, the demand profile differs, the air quality differs, the environment differs and the consequence of an interruption differs.

So our first question is not “what size compressor do you want?” It is “what must the compressed air accomplish, and what happens if it stops?” A customer does not need to know compressor technology before calling us. Knowing the job is enough; we take the discussion from there.

Our six-stage working method

The method is designed to remove uncertainty progressively, so that money is committed only once the requirement is clear. Not every enquiry needs every stage in depth. A straightforward spare part may move through identification and fit confirmation in a single conversation, while a plant-wide pressure problem may need a week of logging.

StageQuestion it answersTypical output
1. UnderstandWhat must the air do, at what pressure, for how long, and at what quality?A written duty statement: application, flow, pressure, duty cycle, air class, site conditions
2. MeasureIs the stated problem what the system is actually doing?Pressure, flow, power, dew-point or load/unload readings where they change the decision
3. SelectWhich technology and configuration fit the duty?A recommendation with the reasoning: screw or piston, diesel or electric, oil-injected or oil-free, buy, rent or used
4. IntegrateWill the machine work with the receiver, dryer, filters, piping and controls?A system view: treatment train, storage, pipe and hose sizes, control settings
5. SupportHow will the equipment be kept running?Service plan, spares list, AMC or hire servicing, breakdown route
6. VerifyDid the intervention solve the original problem?Post-work readings and a short record of what was found and done

Stage 1: understanding the requirement

The job determines the engineering pathway. A few examples show how differently enquiries develop once we know the work.

  • “We need air for DTH drilling.” The discussion moves to hammer size, bore diameter, depth, formation, flushing velocity and site access. Borewell duty typically sits around 600–1,500 cfm at 200–400 psig (13.8–27.6 bar), with special units up to about 35 bar (507.6 psig).
  • “Our factory pressure drops during production.” The discussion moves to demand pattern, pressure profile, leakage, pipe sizing, treatment losses and existing capacity.
  • “Our compressor is down.” We identify the machine, the fault and the operating condition, then decide between repair and temporary air to keep production running.
  • “We need oil-free air.” We look at the process, the contamination risk, the required ISO 8573-1 class and whether an oil-free compressor or an oil-injected machine with filtration is the honest answer.

Useful details at this stage include the equipment being operated, simultaneous consumers, operating hours, existing compressors, power or diesel availability, hose or pipe distance, mobility, future demand and the consequence of losing air.

Stage 2: measuring where it matters

Not every enquiry needs a site audit. But where the decision depends on how the system really behaves, a measurement is worth more than an assumption. Depending on the problem, we may check discharge and point-of-use pressure, flow, temperatures, motor current and power, loaded and unloaded time, filter differential pressure, pressure dew point, vibration and leakage.

Example: “we need a bigger compressor because pressure is low”

Before adding capacity, the system deserves a look. Low pressure at the point of use is often caused by something other than the compressor:

  • leaks consuming a large share of the output;
  • simultaneous peak demand from a few large users;
  • choked filters or a dryer with excessive pressure drop;
  • undersized headers, long hose runs or restrictive quick couplings;
  • poorly set regulators, unsuitable sequencing or incorrect set points;
  • too little storage close to an intermittent heavy user.

Our preferred order is simple: measure first, diagnose second, size third, invest fourth. Raising the set point to hide a distribution loss costs roughly 7% more power for every extra bar, every hour the plant runs.

Example: high electricity consumption

The answer is not automatically “install a VSD”. We first establish actual demand, how it varies across shifts, how many hours the machines run unloaded, the specific power in kW per m³/min, and whether leaks or artificial demand are inflating the load. A variable-speed machine helps where demand genuinely varies; it does little for a compressor that already runs fully loaded all day.

Example: water in the air lines

Moisture complaints are traced along the treatment train: aftercooler performance, separator and drain function, dryer inlet temperature, ambient conditions in the compressor room and the dryer’s pressure dew point. A refrigerated dryer typically delivers a pressure dew point around +3 °C; if a process needs drier air, the answer is a desiccant dryer at around −20 °C or −40 °C, not a second refrigerated unit.

Stage 3: selecting the technology

Because we sell, rent and service many makes, we can begin from the duty rather than a product catalogue. The comparisons we work through most often are:

DecisionWhat usually decides it
Rotary screw or reciprocatingDuty cycle and running hours; pistons suit intermittent workshop use, screws suit continuous duty
Diesel or electricGrid availability and quality at site, mobility, running hours and fuel logistics
Portable or stationaryWhether the air must move with the work or serve a fixed plant
Fixed speed or variable speedHow much and how often demand varies
Oil-injected or oil-freeProcess contamination risk and the required air class
New, used or rentalDuration of need, budget, lead time and risk tolerance
Repair, overhaul or replaceCondition, parts availability, efficiency and remaining service life

We do not buy or recommend on cfm or horsepower alone. A compressor is selected on free air delivery at the required working pressure, under the site’s ambient conditions, with enough margin for treatment losses and realistic growth.

Stage 4: integrating the system

A good compressor can be let down by everything around it. Integration covers the receiver size and position, aftercooler and separator, dryer and filtration to the required class, condensate drains, pipe and hose sizes, ventilation and cooling air in the compressor room, electrical supply and protection, and control settings when several machines share a header.

For temporary air we apply the same thinking to hire packages: the right hoses and couplings, aftercoolers and moisture separators for blasting or cable blowing, dryers where the process needs them, and fuel or power arrangements that suit the site.

Stage 5: supporting the lifecycle

Equipment value continues after delivery. Our support covers routine servicing, annual maintenance contracts, breakdown diagnosis, overhaul and spare parts for customer-owned machines of many brands. On hire jobs, our team services the machines every 300 running hours, including the oil change, so that long or round-the-clock duty does not run on worn consumables.

Spare parts follow a strict identification route. We identify the part from the machine itself, using make, model, serial number, a nameplate photograph and, where possible, the old part, and we confirm fit before quoting. Ordering by visual similarity is one of the most common and costly mistakes in compressor maintenance.

Stage 6: verifying the result

The final question is whether the work solved the problem it was meant to solve. After a repair, a service or an installation we check the operating condition that mattered: pressure at the point of use, discharge temperature (typically about 75–95 °C on an oil-injected screw), dew point, load pattern or current. Where it is useful, we leave a short record of what was found, what was done and what to watch next. That record makes the next decision better.

Five ways customers come to us

  1. Equipment sales. New and used or refurbished compressors, dryers and air-treatment equipment, selected to the duty. For long-term projects we can supply brand-new machines to site.
  2. Rental and hire. Our own fleet from 50 to 2,000 cfm and 2 to 30 bar (29–435.1 psig), diesel and electric, with operators where required.
  3. Service and breakdown. For machines above 10 hp (small 2–10 hp units are for sale and hire only), over 20 service engineers and technicians covering the whole of Telangana and Andhra Pradesh.
  4. Spare parts. Identified from the machine and supplied across India.
  5. System problems. Low pressure, high energy use, moisture or recurring trips, investigated before anything is sold.

Mistakes this method is designed to prevent

  • Buying by cfm or horsepower alone without stating pressure and duty.
  • Oversizing a compressor without understanding the demand profile.
  • Installing extra capacity to feed leaks.
  • Assuming higher pressure is always better.
  • Assuming a VSD always saves energy.
  • Renting whatever happens to be available rather than what the duty needs.
  • Ordering spares by appearance rather than by identification.

How Reddy Compressors helps

Reddy Compressors has served industry since 2002 from our office at Tarnaka, Secunderabad. We are an independent multi-brand specialist: we sell, rent and service machines of ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Sullair, Doosan, Kirloskar and other makes, without being an authorised dealer of any of them. That independence lets us recommend the configuration that fits your duty.

Our service teams cover the whole of Telangana and Andhra Pradesh, and we supply equipment, rentals and spare parts across India, with project-based site support wherever it is feasible. Our generator work is handled by Reddy Generators, under the same management, which helps where a site needs temporary power and air together.

Call +91 99590 60718 or +91 92468 88812, WhatsApp +91 99590 60718, or email info@reddycompressors.com or reddycompressors@gmail.com. The office address is Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017.

What to send us

  • What the air is used for and the tools or process it feeds.
  • Required pressure at the point of use (bar or psig) and an estimate of flow.
  • Running hours per day and whether demand is steady or intermittent.
  • Existing compressor make, model and serial number, with a nameplate photo.
  • Air-quality needs, site location and power or diesel availability.
  • For faults: the symptom, alarm or fault code, and when it started.

Frequently asked questions

Do I need to know which compressor I need before contacting Reddy Compressors?

No. Tell us the job the air must do, the tools or process it supplies, roughly how long it runs and where the site is. We work out pressure, flow, technology and treatment from that. Many of our most successful selections start with a customer who knew only the application and the problem they needed solved, not a model number.

Why do you ask about pressure when I have already told you the cfm?

Flow means little without pressure. A compressor’s free air delivery is rated at a stated working pressure, and the same cfm at 7 bar and at 17 bar needs very different machines and engines. We also need to know the pressure at the point of use, because hoses, pipes, filters and dryers all take some pressure before the air reaches the tool.

Will you always recommend a site audit?

No. Many enquiries, such as a correctly identified spare part or a standard hire, need no measurement at all. We suggest logging only where the decision depends on how the system actually behaves, for example persistent low pressure, high electricity consumption or moisture problems, because buying a larger compressor on a guess is usually more expensive than a few days of readings.

Can you service compressors of different brands at one site?

Yes. We service many makes, including ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic and others, as an independent specialist rather than an authorised dealer. Mixed fleets are normal in Indian plants, and we look at the whole system, including dryers, filters, receivers and controls, rather than treating each machine in isolation.

How do you make sure a spare part will fit before I pay for it?

We identify the part from the machine, using make, model, serial number, a nameplate photograph and, where possible, the old part or its markings. Fit is confirmed before we quote. If identification is uncertain we say so and ask for more information, rather than sending a part that looks similar and hoping it fits.

Which areas does Reddy Compressors cover?

Our office is at Tarnaka, Secunderabad, and our service teams cover the whole of Telangana and Andhra Pradesh. We supply compressors, rental machines and spare parts across India, and provide project-based site support elsewhere in India where it is feasible. Our past projects include work across Telangana, Andhra Pradesh and Karnataka.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812