All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Since 2002 Secunderabad · Hyderabad · Telangana · Andhra Pradesh · Supply across India

Every brand. Every compressor. One accountable partner.

Reddy Compressors sells, rents, services and supplies spare parts for portable, rotary screw and reciprocating compressors of all makes, with the dryers, filters and piping that complete the system; small 2–10 hp units are for sale and hire only.

  • 2002Serving industry from Secunderabad
  • 50–2,000 cfmRental range, diesel and electric
  • 2–30 barLow pressure to deep drilling
  • All brandsSales, service and spares for every major make

Start here

What we do

Everything a compressor needs, from one team.

Buy it, hire it, keep it running and find its parts in one place. One point of contact for every machine on your site, whatever the badge on it.

Compressor types

Every type of compressor. Every major make.

All compressor types →

Rental range

From 50 to 2,000 cfm. Pick the job, we size the machine.

Select a capacity band to see the work it usually covers. We confirm the final size from your tools, hoses, depth or plant demand before anything is dispatched.

50–200 cfm

Compact portable

Breakers, rock drills and hand tools, small workshops, maintenance crews, short site jobs.

200–450 cfm

Mid-size portable

Sandblasting with one or two nozzles, construction sites, shallow borewells, plant maintenance.

450–900 cfm

Drilling class

Borewell and DTH drilling, quarry drilling, larger blasting crews and pipeline work.

Typically 10–17 barAsk for this classRead more →

900–1,300 cfm

High-pressure drilling

Deep borewells, larger hammers, high-pressure drilling and project sites needing headroom.

Up to about 25–30 barAsk for this classRead more →

1,300–2,000 cfm

Plant and project air

Factory shutdowns, compressor breakdowns, peak demand and multi-machine stations.

Matched to plant pressureAsk for this classRead more →

Multi-brand

All brands. All models.

  • Atlas Copco
  • Ingersoll Rand
  • ELGi
  • KAESER
  • Chicago Pneumatic
  • Gardner Denver
  • Sullair
  • Doosan
  • Bobcat
  • Kirloskar
  • Sullivan Palatek

We sell, rent and service ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Sullair, Doosan, Kirloskar, Bobcat and many more brands. Brand names belong to their owners; Reddy Compressors is an independent multi-brand specialist, not an authorised dealer. We have tie-ups with all major and reputed brands.

Our fleet and workshop

Real machines. Our own yard.

Rental fleet →
High-pressure portable compressor, 450 cfm class
High-pressure portable compressor, 450 cfm class
Portable compressor, 600 cfm at 200 psig
Portable compressor, 600 cfm at 200 psig
Skid-mounted diesel compressor
Skid-mounted diesel compressor
Engine bay after overhaul
Engine bay after overhaul
450 cfm skid package
450 cfm skid package

Photographs of Reddy Compressors’ own machines and work, Secunderabad.

How we work

Duty first. Machine second. Support for life.

  1. 01

    Tell us the job

    What the air must run, the pressure, the hours and the site. A nameplate photo helps.

  2. 02

    We recommend

    Buy, rent, repair or refurbish: the option that fits the duty and the budget, in writing.

  3. 03

    We deliver

    Supply, installation or mobilisation, commissioned and checked on site.

  4. 04

    We stay

    Service, spares and AMC for the life of the machine, whichever brand it is.

Watch

Engineering, explained in a minute.

All videos →

Short slide-by-slide explainers on portable air, drilling, receivers and choosing the right compressor technology.

No spoken audio in this video.

Portable air compressors: mobile industrial energy1:20Watch with chapters and notes →

No spoken audio in this video.

From compressed air to productive metres: DTH and borewell drilling1:40Watch with chapters and notes →

No spoken audio in this video.

Air receiver tanks: sizing rule of thumb and why they matter1:15Watch with chapters and notes →

No spoken audio in this video.

Air compressor technologies: piston, scroll, screw, centrifugal and portable1:20Watch with chapters and notes →

FAQ

Questions customers ask us first.

Still unsure? Call +91 99590 60718 and speak to a service engineer.

How should a compressor be selected?

Start from the work, not the horsepower: the pressure the tools or process need, the real air demand and how it varies through the day, the running hours, the air quality required, the site conditions and any expansion you expect. From these we size the compressor and the dryer, filters and receiver around it. A machine chosen only by hp or a rough cfm figure is usually too big, too small or wrong for the duty.

When should rental air be planned?

Before you need it: ahead of a planned shutdown, a blasting, borewell or DTH job, construction work or a seasonal peak, and as standby wherever a breakdown or power outage would stop production. A good plan fixes the pressure and flow, the hose layout, any air treatment and how the machine will be commissioned, so the hired machine works from the first hour.

Why does pressure drop at the point of use?

Usually because of something between the compressor and the tool: undersized pipes or long hose runs, clogged filters, a badly placed receiver, too many users drawing air at once, wrong regulator settings or leaks. Sometimes it is the compressor’s own control band. Measuring the pressure at a few points along the line shows where it is lost.

How are dryers and filters selected?

First by the air quality the use needs, then by the conditions they must work in: the flow, the pressure, the inlet and ambient temperatures, the moisture load and the pressure drop you can accept. A dryer sized for a cool climate will not hold its dew point in a Hyderabad summer, so we size for the hottest months.

How should compressor servicing be planned?

By running hours and site conditions, not by the calendar alone. Each visit should check the oil, filters, separator differential pressure, cooler, controls, drains, leaks and electrical health, and record the readings so the next service starts from a known state. Hot and dusty sites need shorter intervals.

How does Reddy verify spare-part compatibility?

From the nameplate: we take the make, model and serial number, check the parts book for that serial range and the options fitted, and confirm the part number before we quote. The part number is stated on the quotation, and the fit is checked again before dispatch.

What information is needed before quotation?

The application, the pressure, the approximate air demand, the running hours, the site location and whether electric power or diesel suits the site. Add the air quality you need, details or photos of any existing compressor and how urgently you need it, and we can reply with a proper quotation in one step.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812