Video chapters
- Portable air compressors: mobile industrial energy
- The portable compressor landscape
- Pressure and flow: the foundation of selection
- Inside a diesel rotary-screw portable compressor
- Rotary-screw compression: what happens inside
- Application engineering: select from the work backwards
- DTH and borewell drilling: where pressure meets airflow
- Compressor sizing: design at the point of use
- Pressure drop: the invisible productivity tax
- Air quality: compressed air is not automatically clean
- Site conditions: altitude, heat and dust
- Fuel, productivity and lifecycle economics
- Rental or ownership: the asset strategy
- Electric, battery, hybrid and oil-free: the energy transition
- Connected compressors: predictive reliability
- The future: intelligent mobile compressed-air systems
The video has no spoken audio: each slide stays on screen for five seconds, so pause on any chapter you want to read in full. The notes below explain what each group of slides means on a real site in Telangana or Andhra Pradesh, with worked figures.
Pressure and flow: the two numbers that decide everything
Every portable compressor carries two ratings: working pressure in bar g (or psig) and free air delivery (FAD) in cfm or m³/min. Pressure decides whether a tool or hammer works at all; flow decides how many of them can work at once. A breaker rated for 6–7 bar needs about 87–101.5 psig at the tool, not at the compressor outlet, which is why hose losses matter (see the pressure-drop chapter).
| Typical work | Working pressure | Typical portable class |
|---|---|---|
| Breakers, rock drills, general site tools | 7 bar (101.5 psig) | 185–450 cfm |
| Sandblasting with one No. 6 nozzle | 7–8 bar (101.5–116.0 psig) | about 300 cfm |
| Shotcrete, pipe testing, long hose runs | 10–12 bar (145.0–174.0 psig) | 375–750 cfm |
| DTH borewell and blast-hole drilling | 13.8–27.6 bar (200.2–400.3 psig), special units to 35 bar (507.6 psig) | 600–1,500 cfm |
Inside a diesel rotary-screw portable
Most portables above about 100 cfm are oil-injected rotary screw machines driven by a diesel engine. Two meshing rotors trap air and reduce its volume continuously; injected oil seals the rotor clearances, carries away the heat of compression and lubricates the bearings. The air-oil mixture then passes through the separator tank and separator element, a minimum-pressure valve and the oil cooler. An inlet valve and the engine governor together match output to demand: when tools stop, the inlet closes and the engine drops to idle to save fuel.
Selecting from the work backwards
The video’s sizing slides follow the same order we use when a customer calls:
- List every tool or the drilling duty, with its pressure and air consumption.
- Decide how many run together. Breaker crews rarely all hammer at the same instant; DTH drilling is continuous.
- Add the pressure lost in hoses, couplings and lubricators, so the compressor setting delivers the required pressure at the tool.
- Add margin for heat, altitude and wear, usually 10–20 per cent on flow.
- Choose the class, then check the fuel, transport and hire-or-buy economics.
Pressure drop, air quality and site conditions
A long, undersized hose is the most common reason a “big enough” compressor fails on site: the gauge on the machine reads 7 bar while the breaker sees 5.5 bar and cuts slowly. Keep hoses short, use the correct bore for the flow and avoid stacked couplings. Air from a portable is hot, wet and carries oil aerosol; painting, blasting and instrument work need an aftercooler, water separator and filters. Heat and altitude reduce what a machine can deliver: at Hyderabad’s elevation of about 540 m the air is about 6 per cent less dense than at sea level, and on 45 °C summer afternoons engine and cooling margins shrink further.
Fuel, hire or own, and what comes next
Fuel is usually the largest running cost of a diesel portable over its life, so an oversized machine idling half the day is expensive even when its hire rate looks cheap. Hiring makes sense for short projects, peaks and breakdowns; ownership pays where the machine works most days of the year and has an operator who looks after it. The final slides look ahead to electric portables, battery and hybrid packs, oil-free units for clean air and telematics that report hours, faults and location so service can be planned before a breakdown.
How Reddy Compressors helps
We hire, sell and service diesel and electric portable compressors from 50 to 2,000 cfm at 2 to 30 bar, with special DTH units to 35 bar, and supply hoses, receivers and manifolds with the machine.
Reddy Compressors has worked from Secunderabad since 2002 as an independent, multi-brand supplier: sales of new, used and refurbished compressors, hire from our own fleet of 50 to 2,000 cfm, service by our own engineers for machines above 10 hp, and spare parts matched to the nameplate. We cover Hyderabad, the whole of Telangana and Andhra Pradesh and districts within about 300 km, and supply across India. Call or WhatsApp +91 99590 60718, open 7 days, 8:30 am to 8:30 pm.
Frequently asked questions
What size portable compressor do I need for two breakers?
Most 25–30 kg breakers use about 40–55 cfm each at 6–7 bar, so two breakers with a short hose run comfortably on a 185 cfm class machine with margin for hose losses and wear. Send us the breaker model and hose length and we will confirm.
Is the cfm rating at the compressor the air I get at the tool?
The FAD rating is measured at the compressor outlet under standard conditions. Hose losses, leaks, heat and altitude all reduce what reaches the tool, which is why we add a margin of about 10–20 per cent when sizing.
Can a portable compressor supply clean air for painting?
Not on its own. Portable air is hot, wet and contains oil aerosol, so painting and instrument work need an aftercooler, water separator and coalescing filters, or an oil-free portable for sensitive work.
Why does the video have no sound?
The video is a slide-by-slide engineering explainer with no spoken audio, so it can be watched on site or in an office without sound. Each slide stays on screen for five seconds; pause to read any chapter in full.
Should I hire or buy a portable compressor?
Hire for short jobs, peaks, shutdowns and breakdown cover; buy when the machine will work most days of the year and you have someone to look after it. Our hire-or-buy guide works through the break-even with real figures.
Related pages
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 24 November 2026. How our engineering content is reviewed.