AIREND CONDITION, PERFORMANCE DEGRADATION & OVERHAUL DECISION ENGINEERING
RESEARCH LAYER: uploaded benchmark/reference sources inform service, rebuild, parts, instrumentation, performance-verification and lifecycle topic coverage; supplier wording and unsupported capability claims are not copied.
Deployment requires current vessel identity, inspection/certification evidence and site/jurisdiction review. Legacy remains separately preserved.
Provisional new-series slug: /compressed-air-engineering/airend-condition-performance-degradation-overhaul-decision/ | CTA: Review My Airend Condition
Do not overhaul an airend because it has hours. overhaul it when the evidence shows that restoring internal condition is the right lifecycle decision
It prevents capacity, temperature, vibration or energy symptoms from being assigned to the airend before package and system causes are tested.
Capacity loss may arise from intake restriction, controls, leakage, separator restriction, cooling, speed/load state or measurement error. High temperature may arise from cooling or fluid problems. Vibration may arise from motor, coupling, foundation or piping. An overhaul decision therefore follows a controlled diagnostic chain and exact airend identification.
1 — Airend Identity
Airend Decision Foundation: govern airend identity using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
2 — Compressor Identity
Airend Decision Foundation: govern compressor identity using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
3 — Airend Technology
Airend Decision Foundation: govern airend technology using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
4 — Drive Arrangement
Airend Decision Foundation: govern drive arrangement using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
5 — Lubrication Architecture
Airend Decision Foundation: govern lubrication architecture using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
6 — Operating Hours
Airend Decision Foundation: govern operating hours using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
7 — Load Hours
Airend Decision Foundation: govern load hours using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
8 — Starts/Cycles
Airend Decision Foundation: govern starts/cycles using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
9 — Pressure History
Airend Decision Foundation: govern pressure history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
10 — Ambient History
Airend Decision Foundation: govern ambient history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
11 — Maintenance History
Airend Decision Foundation: govern maintenance history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
12 — Overhaul History
Airend Decision Foundation: govern overhaul history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
13 — Failure History
Airend Decision Foundation: govern failure history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
14 — Current Symptoms
Airend Decision Foundation: govern current symptoms using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
15 — Decision Owner
Airend Decision Foundation: govern decision owner using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
16 — Required Fad
Functional Performance: govern required FAD using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
17 — Measured Fad
Functional Performance: govern measured FAD using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
18 — Required Pressure
Functional Performance: govern required pressure using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
19 — Delivered Pressure
Functional Performance: govern delivered pressure using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
20 — Specific Power
Functional Performance: govern specific power using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
21 — Input Power
Functional Performance: govern input power using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
22 — Speed/Load Relationship
Functional Performance: govern speed/load relationship using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
23 — Loaded Temperature
Functional Performance: govern loaded temperature using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
24 — Unloaded Behaviour
Functional Performance: govern unloaded behaviour using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
25 — Load/Unload Cycling
Functional Performance: govern load/unload cycling using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
26 — Vsd Envelope
Functional Performance: govern VSD envelope using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
27 — Oil-Carryover Context
Functional Performance: govern oil-carryover context using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
28 — Noise Condition
Functional Performance: govern noise condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
29 — Vibration Condition
Functional Performance: govern vibration condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
30 — Accepted Baseline
Functional Performance: govern accepted baseline using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
31 — Intake Restriction
Degradation Screening: govern intake restriction using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
32 — Air-Filter Condition
Degradation Screening: govern air-filter condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
33 — Inlet-Valve Function
Degradation Screening: govern inlet-valve function using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
34 — Separator Restriction
Degradation Screening: govern separator restriction using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
35 — Oil-Filter Restriction
Degradation Screening: govern oil-filter restriction using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
36 — Cooler Condition
Degradation Screening: govern cooler condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
37 — Lubricant Condition
Degradation Screening: govern lubricant condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
38 — Thermostatic/Bypass Condition
Degradation Screening: govern thermostatic/bypass condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
39 — Minimum-Pressure Valve
Degradation Screening: govern minimum-pressure valve using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
40 — Blowdown System
Degradation Screening: govern blowdown system using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
41 — Internal Leakage Suspicion
Degradation Screening: govern internal leakage suspicion using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
42 — External Leakage
Degradation Screening: govern external leakage using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
43 — Controls/Setpoint Issue
Degradation Screening: govern controls/setpoint issue using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
44 — Sensor Accuracy
Degradation Screening: govern sensor accuracy using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
45 — Measurement Uncertainty
Degradation Screening: govern measurement uncertainty using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
46 — Airend Vibration
Mechanical Condition: govern airend vibration using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
47 — Bearing Vibration
Mechanical Condition: govern bearing vibration using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
48 — Bearing Temperature
Mechanical Condition: govern bearing temperature using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
49 — Rotor-Contact Suspicion
Mechanical Condition: govern rotor-contact suspicion using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
50 — Gear Condition
Mechanical Condition: govern gear condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
51 — Coupling Condition
Mechanical Condition: govern coupling condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
52 — Shaft Condition
Mechanical Condition: govern shaft condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
53 — Seal Condition
Mechanical Condition: govern seal condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
54 — Lubrication Evidence
Mechanical Condition: govern lubrication evidence using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
55 — Wear Debris
Mechanical Condition: govern wear debris using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
56 — Abnormal Noise
Mechanical Condition: govern abnormal noise using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
57 — End-Float Boundary
Mechanical Condition: govern end-float boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
58 — Alignment Context
Mechanical Condition: govern alignment context using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
59 — Foundation/Piping Influence
Mechanical Condition: govern foundation/piping influence using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
60 — Specialist Review
Mechanical Condition: govern specialist review using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
61 — Capacity Decline
Performance Degradation: govern capacity decline using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
62 — Specific-Power Increase
Performance Degradation: govern specific-power increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
63 — Temperature Increase
Performance Degradation: govern temperature increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
64 — Pressure Instability
Performance Degradation: govern pressure instability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
65 — Unloaded-Power Increase
Performance Degradation: govern unloaded-power increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
66 — Cycling Increase
Performance Degradation: govern cycling increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
67 — Separator-Dp Increase
Performance Degradation: govern separator-DP increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
68 — Intake-Dp Increase
Performance Degradation: govern intake-DP increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
69 — Cooler-Approach Increase
Performance Degradation: govern cooler-approach increase using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
70 — Oil-Consumption Change
Performance Degradation: govern oil-consumption change using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
71 — Carryover Change
Performance Degradation: govern carryover change using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
72 — Vibration Trend
Performance Degradation: govern vibration trend using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
73 — Noise Trend
Performance Degradation: govern noise trend using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
74 — Alarm Frequency
Performance Degradation: govern alarm frequency using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
75 — Degradation Rate
Performance Degradation: govern degradation rate using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
76 — External Inspection
Inspection & Evidence: govern external inspection using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
77 — Borescope Boundary
Inspection & Evidence: govern borescope boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
78 — Oil Analysis
Inspection & Evidence: govern oil analysis using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
79 — Vibration Analysis
Inspection & Evidence: govern vibration analysis using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
80 — Thermal Analysis
Inspection & Evidence: govern thermal analysis using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
81 — Performance Test
Inspection & Evidence: govern performance test using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
82 — Leak Test
Inspection & Evidence: govern leak test using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
83 — Control Review
Inspection & Evidence: govern control review using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
84 — Service Records
Inspection & Evidence: govern service records using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
85 — Parts History
Inspection & Evidence: govern parts history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
86 — Failure Debris
Inspection & Evidence: govern failure debris using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
87 — Filter/Separator Evidence
Inspection & Evidence: govern filter/separator evidence using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
88 — Cooler Evidence
Inspection & Evidence: govern cooler evidence using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
89 — Photographic Evidence
Inspection & Evidence: govern photographic evidence using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
90 — Measurement Traceability
Inspection & Evidence: govern measurement traceability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
91 — Bearing Replacement Boundary
Overhaul Scope: govern bearing replacement boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
92 — Seal Replacement Boundary
Overhaul Scope: govern seal replacement boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
93 — Gasket/O-Ring Boundary
Overhaul Scope: govern gasket/O-ring boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
94 — Rotor Inspection
Overhaul Scope: govern rotor inspection using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
95 — Housing Inspection
Overhaul Scope: govern housing inspection using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
96 — Shaft Inspection
Overhaul Scope: govern shaft inspection using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
97 — Gear Inspection
Overhaul Scope: govern gear inspection using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
98 — Clearance Measurement
Overhaul Scope: govern clearance measurement using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
99 — Surface-Condition Review
Overhaul Scope: govern surface-condition review using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
100 — Cleaning Process
Overhaul Scope: govern cleaning process using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
101 — Parts Traceability
Overhaul Scope: govern parts traceability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
102 — Assembly Cleanliness
Overhaul Scope: govern assembly cleanliness using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
103 — Special Tools
Overhaul Scope: govern special tools using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
104 — Metrology Requirement
Overhaul Scope: govern metrology requirement using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
105 — Scope Deviation Control
Overhaul Scope: govern scope deviation control using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
106 — Rotor-To-Rotor Clearance Boundary
Internal Condition: govern rotor-to-rotor clearance boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
107 — Rotor-To-Housing Clearance Boundary
Internal Condition: govern rotor-to-housing clearance boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
108 — End-Clearance Boundary
Internal Condition: govern end-clearance boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
109 — Bearing-Fit Boundary
Internal Condition: govern bearing-fit boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
110 — Shaft-Fit Boundary
Internal Condition: govern shaft-fit boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
111 — Gear-Backlash Boundary
Internal Condition: govern gear-backlash boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
112 — Preload Boundary
Internal Condition: govern preload boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
113 — Seal Running Surface
Internal Condition: govern seal running surface using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
114 — Housing Condition
Internal Condition: govern housing condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
115 — Rotor Coating Boundary
Internal Condition: govern rotor coating boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
116 — Corrosion/Erosion
Internal Condition: govern corrosion/erosion using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
117 — Scoring/Rubbing
Internal Condition: govern scoring/rubbing using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
118 — Deposit Formation
Internal Condition: govern deposit formation using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
119 — Measurement-Temperature Context
Internal Condition: govern measurement-temperature context using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
120 — Oem Data Requirement
Internal Condition: govern OEM data requirement using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
121 — Repairability
Overhaul vs Replacement: govern repairability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
122 — Parts Availability
Overhaul vs Replacement: govern parts availability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
123 — Airend Age
Overhaul vs Replacement: govern airend age using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
124 — Repeat-Failure History
Overhaul vs Replacement: govern repeat-failure history using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
125 — Housing/Rotor Condition
Overhaul vs Replacement: govern housing/rotor condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
126 — Bearing-Seat Condition
Overhaul vs Replacement: govern bearing-seat condition using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
127 — Obsolete Design
Overhaul vs Replacement: govern obsolete design using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
128 — Replacement-Airend Availability
Overhaul vs Replacement: govern replacement-airend availability using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
129 — New-Compressor Alternative
Overhaul vs Replacement: govern new-compressor alternative using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
130 — Energy-Performance Gap
Overhaul vs Replacement: govern energy-performance gap using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
131 — Future Capacity Need
Overhaul vs Replacement: govern future capacity need using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
132 — Future Pressure Need
Overhaul vs Replacement: govern future pressure need using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
133 — Downtime Exposure
Overhaul vs Replacement: govern downtime exposure using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
134 — Warranty/Support Boundary
Overhaul vs Replacement: govern warranty/support boundary using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
135 — Lifecycle Economics
Overhaul vs Replacement: govern lifecycle economics using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
136 — Assembly Verification
Post-Rebuild Validation: govern assembly verification using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
137 — Rotation/Free-Movement Check
Post-Rebuild Validation: govern rotation/free-movement check using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
138 — Lubrication Readiness
Post-Rebuild Validation: govern lubrication readiness using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
139 — Leak Check
Post-Rebuild Validation: govern leak check using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
140 — Initial Start
Post-Rebuild Validation: govern initial start using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
141 — Temperature Stabilisation
Post-Rebuild Validation: govern temperature stabilisation using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
142 — Vibration Baseline
Post-Rebuild Validation: govern vibration baseline using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
143 — Noise Baseline
Post-Rebuild Validation: govern noise baseline using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
144 — Pressure Control
Post-Rebuild Validation: govern pressure control using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
145 — Capacity Verification
Post-Rebuild Validation: govern capacity verification using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
146 — Power Verification
Post-Rebuild Validation: govern power verification using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
147 — Specific-Power Comparison
Post-Rebuild Validation: govern specific-power comparison using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
148 — Carryover Observation
Post-Rebuild Validation: govern carryover observation using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
149 — Alarm/Trip Review
Post-Rebuild Validation: govern alarm/trip review using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
150 — Handover Baseline
Post-Rebuild Validation: govern handover baseline using exact compressor and airend make/model/serial, operating history, configuration, measured performance and condition evidence. Separate confirmed defects from symptoms and assumptions. Exact bearings, seals, fits, preload, internal clearances, torque values, rotor geometry and acceptance limits must come from current manufacturer/specialist data for the identified airend. Preserve as-found evidence before cleaning/disassembly removes it and verify the as-left state after intervention.
151 — Premium Airend Condition & Decision Register
Field | Controlled record | Purpose |
|---|---|---|
Compressor | Make/model/serial/tag | Identity |
Airend | Make/model/serial | Exact component |
Hours/duty | Run/load/start history | Exposure |
Symptoms | Capacity/temp/vibration | Problem |
Baseline | Accepted healthy reference | Comparison |
Performance | FAD/power/pressure | Function |
Condition | Vibration/oil/thermal | Evidence |
External causes | Intake/cooling/controls | Exclusion |
Internal finding | Bearing/rotor/seal | Diagnosis |
Repairability | Scope/parts/metrology | Feasibility |
Alternatives | Overhaul/replace/new machine | Decision |
Downtime | Recovery window | Business |
Validation | Post-work tests | Acceptance |
Residual risk | Open limitation | Transparency |
Revision | Reviewer/date | History |
152 — Overhaul Decision Matrix
Observed evidence | Decision question | Potential disposition |
|---|---|---|
Performance normal, hours high | Is there actual degradation? | Continue monitored service within requirements |
Capacity low, package cause present | Is airend really the cause? | Correct package/system issue first |
Bearing evidence corroborated | Can defect be repaired before secondary damage? | Planned specialist assessment |
Wear debris + vibration + heat | Is internal damage progressing? | Escalated inspection / controlled outage |
Rotor/housing damage | Can geometry/integrity be restored? | Replacement airend/compressor review |
Obsolete airend | Is overhaul supportable long-term? | Replacement/lifecycle modernisation |
Poor efficiency, mechanically healthy | Would overhaul restore efficiency? | System/control/new-machine comparison |
Repeat post-overhaul failure | Was root cause external? | RCA before another rebuild |
Future duty changed | Does current machine still fit? | Master-plan decision |
Successful rebuild | Was required function restored? | Validation + new baseline |
153 — Diagnostic Separation: Airend or System?
Confirm flow measurement boundary before declaring capacity loss.
Confirm discharge pressure and representative load.
Check intake restriction and inlet-valve behaviour.
Check separator DP and minimum-pressure valve.
Check cooler, ventilation and fluid condition before blaming high temperature.
Check external leakage and demand changes.
Check controller, sensors, VSD and sequencing.
Check motor/drive/coupling before attributing vibration to airend.
Correlate oil wear evidence with vibration and inspection.
Compare against accepted baseline/reference.
Account for ambient/altitude where relevant.
Do not use one symptom as proof of internal failure.
Escalate to specialist inspection when evidence justifies it.
Preserve uncertainty when measurements are incomplete.
Avoid unnecessary dismantling solely to obtain evidence.
154 — Overhaul Work-Pack Architecture
Exact airend/compressor identification.
Reason for removal and symptoms.
Pre-removal performance/condition evidence.
Isolation, lifting and handling plan.
Cleanliness controls.
As-found photographs.
Authorised as-found measurements.
Traceable parts list.
Inspection disposition for rotors/housing/shafts/gears/bearings/seals.
Specialist repair/acceptance evidence.
Controlled assembly and cleanliness.
Exact OEM/specialist assembly data.
Deviation/nonconformance record.
Reinstallation/alignment checks.
Post-rebuild commissioning and baseline.
155 — Failure-Mechanism Review
Lubrication starvation or unsuitable lubricant.
Contamination ingress or poor cleanliness.
Overtemperature / thermal stress.
Water/moisture contamination.
Operation outside approved pressure envelope.
Misalignment/drive influence.
Foundation or piping loads.
Bearing deterioration.
Seal degradation.
Gear deterioration where applicable.
Rotor contact/scoring/coating damage.
Corrosion/erosion/process contamination.
Foreign-object damage.
Maintenance-induced assembly error.
Unresolved root cause from earlier failure.
156 — Lifecycle Economics & Decision Logic
Compare more than repair price: restored performance, parts/support availability, downtime, energy performance, repeat-failure risk, remaining package condition, controls obsolescence, future demand and temporary-air or lost-production exposure.
A repairable airend may still be the wrong investment if the package is obsolete, inefficient for the duty or unsupported. Conversely, a newer compressor should not be replaced merely because an airend bearing requires a technically supportable overhaul. State assumptions and compare overhaul, replacement airend, verified exchange/remanufactured options, complete compressor replacement or system redesign on a defined horizon.
157 — Technical / Airend Verification Gate
Exact compressor/airend identity verified
Symptoms separated from confirmed failure modes
External causes screened
Flow/power/pressure boundaries controlled
Vibration/oil/thermal evidence correlated
Internal dimensions/assembly data model-specific
No generic bearing/seal/clearance/preload/torque published
As-found condition preserved
Parts applicability/traceability controlled
Repair processes preserve geometry/integrity
Repeat failure triggers RCA
Economics include downtime/future duty/obsolescence
Post-rebuild validation establishes new baseline
Specialist rebuild capability claims evidence-gated
When does an airend need overhaul?
When model-specific condition/performance evidence shows internal degradation best corrected by specialist rebuild—not merely because a generic hour threshold is reached.
Does low capacity mean worn airend?
Not automatically. Intake, controls, speed, leakage, separator restriction, measurement error and demand can mimic capacity loss.
Can vibration prove bearing failure?
It can support diagnosis with trend and corroborating evidence; high-impact decisions require competent analysis.
What should be measured before removal?
Where safe: flow, pressure, power, temperatures, vibration, oil condition, operating state and package restrictions/settings.
What is checked during overhaul?
Depending on design: bearings, seals, rotors, housing, shafts/gears, fits/clearances and evidence of rubbing, contamination, corrosion or overheating.
Can generic bearing numbers be used?
No. Exact bearings, fits, preload and related data must be verified for the identified airend.
Should rotors always be recoated?
No universal rule applies; rotor/coating condition and approved repair process are design-specific.
Is overhaul always cheaper than replacement?
No. Compare downtime, efficiency, obsolescence, future duty, supportability and package condition.
What if failure repeats after overhaul?
Preserve evidence and investigate root cause before repeating the same rebuild.
How is a rebuilt airend accepted?
Through controlled reinstallation/startup and verification of relevant temperature, vibration, pressure, capacity/power and alarm behaviour.
Can AI decide overhaul?
AI can organise evidence; exact limits, repairability and acceptance require identified equipment data and specialist review.