Compressor Relocation, Decommissioning, Reinstallation & Recommissioning Engineering

50 min read151 sections

COMPRESSOR RELOCATION, DECOMMISSIONING, REINSTALLATION & RECOMMISSIONING ENGINEERING

It requires baseline photographs/nameplates/settings/connections/condition/fluids/faults before dismantling; manufacturer lifting points, suitable lifting planning, contamination protection and transport restraints; new-site review of foundation/skid, ventilation, cooling, electrical supply, drainage, piping loads and service clearances; and recommissioning verification of rotation, leaks, controls, protection, temperatures, pressure and dryer/auxiliary operation. These controls are expanded without assuming the old installation can be copied at the new site.

Provisional new-series slug: /compressed-air-engineering/relocation-decommissioning-reinstallation-recommissioning/ | CTA: Plan My Compressor Relocation

The compressor may be the same machine. the installation is not the same installation

A machine that operated acceptably in one room can perform poorly or unsafely elsewhere if ventilation, electrical supply, piping, cooling, drainage, foundation, access or controls change.

The relocation record must preserve the old state before disconnection so that the new installation can distinguish pre-existing defects from transport or reinstallation effects. Exact lifting points, centre of gravity, transport restraints, foundation loads, electrical protection, pipe loads, ventilation duty and commissioning acceptance criteria remain equipment/project specific.

1 — Project Identity

Relocation Governance: govern project identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

2 — Asset Identity

Relocation Governance: govern asset identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

3 — Make/Model/Serial

Relocation Governance: govern make/model/serial as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

4 — Airend Identity

Relocation Governance: govern airend identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

5 — Controller Identity

Relocation Governance: govern controller identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

6 — Motor/Engine Identity

Relocation Governance: govern motor/engine identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

7 — Dryer/Auxiliary Identity

Relocation Governance: govern dryer/auxiliary identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

8 — Old Site

Relocation Governance: govern old site as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

9 — New Site

Relocation Governance: govern new site as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

10 — Scope Owner

Relocation Governance: govern scope owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

11 — Technical Owner

Relocation Governance: govern technical owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

12 — Operations Owner

Relocation Governance: govern operations owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

13 — Lifting Owner

Relocation Governance: govern lifting owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

14 — Commissioning Owner

Relocation Governance: govern commissioning owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

15 — Revision Control

Relocation Governance: govern revision control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

16 — Nameplate Photo

Pre-Relocation Baseline: govern nameplate photo as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

17 — Overall Photos

Pre-Relocation Baseline: govern overall photos as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

18 — Connection Photos

Pre-Relocation Baseline: govern connection photos as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

19 — Controller Settings

Pre-Relocation Baseline: govern controller settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

20 — Vfd Settings

Pre-Relocation Baseline: govern VFD settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

21 — Sequencer Settings

Pre-Relocation Baseline: govern sequencer settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

22 — Operating Hours

Pre-Relocation Baseline: govern operating hours as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

23 — Fault History

Pre-Relocation Baseline: govern fault history as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

24 — Service History

Pre-Relocation Baseline: govern service history as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

25 — Fluid Levels

Pre-Relocation Baseline: govern fluid levels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

26 — Leak Condition

Pre-Relocation Baseline: govern leak condition as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

27 — Pressure Baseline

Pre-Relocation Baseline: govern pressure baseline as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

28 — Temperature Baseline

Pre-Relocation Baseline: govern temperature baseline as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

29 — Vibration/Noise Boundary

Pre-Relocation Baseline: govern vibration/noise boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

30 — Known Defects

Pre-Relocation Baseline: govern known defects as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

31 — Shutdown Window

Decommissioning Planning: govern shutdown window as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

32 — Critical-Air Dependency

Decommissioning Planning: govern critical-air dependency as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

33 — Standby/Temporary Air Boundary

Decommissioning Planning: govern standby/temporary air boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

34 — Production Clearance

Decommissioning Planning: govern production clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

35 — Electrical Isolation

Decommissioning Planning: govern electrical isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

36 — Pneumatic Isolation

Decommissioning Planning: govern pneumatic isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

37 — Stored Pressure

Decommissioning Planning: govern stored pressure as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

38 — Cooling-Water Isolation

Decommissioning Planning: govern cooling-water isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

39 — Condensate Drainage

Decommissioning Planning: govern condensate drainage as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

40 — Fluid Handling

Decommissioning Planning: govern fluid handling as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

41 — Control/Network Disconnection

Decommissioning Planning: govern control/network disconnection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

42 — Pipe Disconnection

Decommissioning Planning: govern pipe disconnection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

43 — Label/Tag Plan

Decommissioning Planning: govern label/tag plan as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

44 — Open-Port Protection

Decommissioning Planning: govern open-port protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

45 — Decommission Signoff

Decommissioning Planning: govern decommission signoff as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

46 — Electrical Cable Identification

Disconnection & Preservation: govern electrical cable identification as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

47 — Control Wiring Identification

Disconnection & Preservation: govern control wiring identification as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

48 — Communication Cable

Disconnection & Preservation: govern communication cable as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

49 — Air Piping

Disconnection & Preservation: govern air piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

50 — Cooling Piping

Disconnection & Preservation: govern cooling piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

51 — Drain Piping

Disconnection & Preservation: govern drain piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

52 — Fuel Boundary

Disconnection & Preservation: govern fuel boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

53 — Flexible Connectors

Disconnection & Preservation: govern flexible connectors as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

54 — Sensor Lines

Disconnection & Preservation: govern sensor lines as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

55 — Open-Port Blanking

Disconnection & Preservation: govern open-port blanking as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

56 — Fluid Containment

Disconnection & Preservation: govern fluid containment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

57 — Desiccant/Treatment Boundary

Disconnection & Preservation: govern desiccant/treatment boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

58 — Loose-Part Control

Disconnection & Preservation: govern loose-part control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

59 — Removed-Part Inventory

Disconnection & Preservation: govern removed-part inventory as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

60 — Configuration Archive

Disconnection & Preservation: govern configuration archive as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

61 — Manufacturer Lifting Points

Lifting Engineering: govern manufacturer lifting points as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

62 — Machine Mass

Lifting Engineering: govern machine mass as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

63 — Centre-Of-Gravity Boundary

Lifting Engineering: govern centre-of-gravity boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

64 — Lifting Frame Boundary

Lifting Engineering: govern lifting frame boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

65 — Crane/Hoist Capacity

Lifting Engineering: govern crane/hoist capacity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

66 — Slings/Shackles Boundary

Lifting Engineering: govern slings/shackles boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

67 — Lift Path

Lifting Engineering: govern lift path as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

68 — Overhead Clearance

Lifting Engineering: govern overhead clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

69 — Floor Loading Boundary

Lifting Engineering: govern floor loading boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

70 — Rigging Plan

Lifting Engineering: govern rigging plan as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

71 — Tagline/Control Boundary

Lifting Engineering: govern tagline/control boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

72 — Lift Exclusion Zone

Lifting Engineering: govern lift exclusion zone as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

73 — Competent Lifting Team

Lifting Engineering: govern competent lifting team as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

74 — Weather Boundary

Lifting Engineering: govern weather boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

75 — Lift Record

Lifting Engineering: govern lift record as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

76 — Transport Vehicle

Transport Engineering: govern transport vehicle as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

77 — Machine Restraint

Transport Engineering: govern machine restraint as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

78 — Tie-Down Points

Transport Engineering: govern tie-down points as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

79 — Shock/Vibration Boundary

Transport Engineering: govern shock/vibration boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

80 — Weather Protection

Transport Engineering: govern weather protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

81 — Dust/Water Protection

Transport Engineering: govern dust/water protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

82 — Openings Protected

Transport Engineering: govern openings protected as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

83 — Fluid Transport Boundary

Transport Engineering: govern fluid transport boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

84 — Component Support

Transport Engineering: govern component support as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

85 — Controller/Electrical Protection

Transport Engineering: govern controller/electrical protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

86 — Route Clearance

Transport Engineering: govern route clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

87 — Loading/Unloading

Transport Engineering: govern loading/unloading as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

88 — Transport Inspection

Transport Engineering: govern transport inspection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

89 — Damage Record

Transport Engineering: govern damage record as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

90 — Arrival Acceptance

Transport Engineering: govern arrival acceptance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

91 — Foundation/Skid

New-Site Engineering: govern foundation/skid as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

92 — Floor Condition

New-Site Engineering: govern floor condition as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

93 — Level Boundary

New-Site Engineering: govern level boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

94 — Service Clearance

New-Site Engineering: govern service clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

95 — Ventilation

New-Site Engineering: govern ventilation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

96 — Hot-Air Exhaust

New-Site Engineering: govern hot-air exhaust as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

97 — Intake Air

New-Site Engineering: govern intake air as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

98 — Cooling Water

New-Site Engineering: govern cooling water as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

99 — Electrical Supply

New-Site Engineering: govern electrical supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

100 — Earthing Boundary

New-Site Engineering: govern earthing boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

101 — Drainage

New-Site Engineering: govern drainage as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

102 — Condensate Treatment

New-Site Engineering: govern condensate treatment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

103 — Compressed-Air Piping

New-Site Engineering: govern compressed-air piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

104 — Piping Loads

New-Site Engineering: govern piping loads as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

105 — Future Maintainability

New-Site Engineering: govern future maintainability as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

106 — Machine Placement

Mechanical Reinstallation: govern machine placement as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

107 — Levelling Boundary

Mechanical Reinstallation: govern levelling boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

108 — Anchoring

Mechanical Reinstallation: govern anchoring as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

109 — Vibration Mounts

Mechanical Reinstallation: govern vibration mounts as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

110 — Pipe Alignment

Mechanical Reinstallation: govern pipe alignment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

111 — Flexible Connector

Mechanical Reinstallation: govern flexible connector as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

112 — Pipe Strain

Mechanical Reinstallation: govern pipe strain as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

113 — Cooling-Water Connections

Mechanical Reinstallation: govern cooling-water connections as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

114 — Drain Connections

Mechanical Reinstallation: govern drain connections as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

115 — Air Outlet

Mechanical Reinstallation: govern air outlet as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

116 — Intake Duct Boundary

Mechanical Reinstallation: govern intake duct boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

117 — Guards/Panels

Mechanical Reinstallation: govern guards/panels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

118 — Service Access

Mechanical Reinstallation: govern service access as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

119 — Alignment Recheck

Mechanical Reinstallation: govern alignment recheck as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

120 — Mechanical Completion

Mechanical Reinstallation: govern mechanical completion as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

121 — Incoming Supply

Electrical Controls Reinstallation: govern incoming supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

122 — Protection

Electrical Controls Reinstallation: govern protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

123 — Cable Size Boundary

Electrical Controls Reinstallation: govern cable size boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

124 — Phase Sequence

Electrical Controls Reinstallation: govern phase sequence as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

125 — Motor Connection

Electrical Controls Reinstallation: govern motor connection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

126 — Earthing

Electrical Controls Reinstallation: govern earthing as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

127 — Controller Supply

Electrical Controls Reinstallation: govern controller supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

128 — Vfd Connection

Electrical Controls Reinstallation: govern VFD connection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

129 — Sensor Wiring

Electrical Controls Reinstallation: govern sensor wiring as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

130 — I/O

Electrical Controls Reinstallation: govern I/O as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

131 — Communications

Electrical Controls Reinstallation: govern communications as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

132 — Remote Start Boundary

Electrical Controls Reinstallation: govern remote start boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

133 — Sequencer Integration

Electrical Controls Reinstallation: govern sequencer integration as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

134 — Configuration Restore

Electrical Controls Reinstallation: govern configuration restore as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

135 — Electrical Completion

Electrical Controls Reinstallation: govern electrical completion as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

136 — Pre-Start Inspection

Recommissioning & Handover: govern pre-start inspection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

137 — Rotation

Recommissioning & Handover: govern rotation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

138 — Fluid Levels

Recommissioning & Handover: govern fluid levels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

139 — Valve Lineup

Recommissioning & Handover: govern valve lineup as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

140 — Leak Check

Recommissioning & Handover: govern leak check as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

141 — Start/Stop

Recommissioning & Handover: govern start/stop as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

142 — Load/Unload

Recommissioning & Handover: govern load/unload as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

143 — Vsd Response

Recommissioning & Handover: govern VSD response as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

144 — Pressure Control

Recommissioning & Handover: govern pressure control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

145 — Temperature

Recommissioning & Handover: govern temperature as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

146 — Vibration/Noise

Recommissioning & Handover: govern vibration/noise as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

147 — Dryer/Auxiliary Operation

Recommissioning & Handover: govern dryer/auxiliary operation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

148 — Alarms/Protection

Recommissioning & Handover: govern alarms/protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

149 — Representative-Load Test

Recommissioning & Handover: govern representative-load test as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

150 — Handover

Recommissioning & Handover: govern handover as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.

151 — Premium Relocation Control Register

Field

Controlled record

Purpose

Project

ID/old-new site/date

Traceability

Asset

Make/model/serial/tag

Identity

Baseline

Photos/settings/condition

Pre-existing state

Isolation

Electrical/pneumatic/utilities

Safety

Disconnections

Tagged/recorded

Recovery

Lifting

Points/plan/equipment

Handling

Transport

Restraint/protection/inspection

Preservation

New site

Foundation/vent/cooling/electrical

Suitability

Piping/drainage

Connections/load/route

Integration

Controls

Settings/I-O/comms

Configuration

Mechanical completion

Placement/alignment/guards

Readiness

Electrical completion

Supply/protection/rotation

Readiness

Recommissioning

Pressure/temp/control/auxiliaries

Verification

Open defects

Risk/follow-up

Transparency

Revision

Reviewer/date

History

152 — Relocation Risk Matrix

Risk / condition

Engineering question

Controlled response

Old machine worked well

Does new site reproduce required utilities/environment?

Re-engineer new site; do not assume equivalence

No baseline photos/settings

Can original configuration be reconstructed?

Hold critical disconnects until evidence captured

Unknown lifting points

Is manufacturer lifting data available?

Do not improvise; obtain competent lift data

Transport shock/damage suspected

What changed from baseline?

Arrival inspection before installation

New room runs hotter

Ventilation/recirculation/heat load adequate?

New pressure poor

Piping/treatment/demand changed?

Dynamic pressure mapping

Motor direction wrong

Phase/rotation verification completed?

Controlled electrical correction

VFD/controller settings lost

Known-good backup available?

Restore only authorised configuration

Pipe does not align naturally

Pipe strain being imposed?

Rework piping; do not force machine nozzles

Dryer quality poor after move

Duty/drain/bypass/sensor/configuration?

153 — Relocation Is an Engineering Change

The new site can alter ventilation, piping, electrical, cooling and operating conditions even when the machine itself is unchanged.

154 — Baseline Before Disconnecting

Photographs, nameplates, settings, connections, condition, fluids and faults preserve the evidence needed to distinguish pre-existing condition from relocation effects.

155 — Lifting Points Are Not Guesswork

Use manufacturer lifting points and a suitable lifting plan. Package panels, piping or arbitrary structural members are not automatically approved lifting points.

156 — Transport Is a Preservation Phase

Protect the machine from contamination, weather, shock, loose components and uncontrolled movement; inspect against the pre-move baseline on arrival.

158 — Technical / Relocation Verification Gate

Verify baseline, isolation, lifting, transport, new-site engineering, mechanical/electrical completion and recommissioning. No 'same installation elsewhere' assumption is permitted.

160 — AEO / Engineering FAQ Layer

Answer what should be recorded before relocation, how compressors are decommissioned/lifted/transported, what must be re-engineered at the new site and why recommissioning is more than reconnecting.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812