Compressed-Air Leakage Reduction

1 min read1 sections

Why leaks matter

Every leak runs all the time, including when production stops. In many plants leakage is a large share of air production, and it also reduces the pressure available at the point of use.

How to find leaks

Common methods:

  • Ultrasonic leak detection during production
  • Listening and soapy-water checks for accessible joints
  • Measuring the load on the compressor when production is stopped
  • Tagging and recording every leak found

Typical leak points

Look at:

  • Hose connections, couplings and quick-release fittings
  • Threaded joints and flanges
  • Regulators, lubricators and filters
  • Valves, drains and condensate traps left open
  • Old or damaged hoses and tools

Repair and sustain

Repair, record, and re-survey on a schedule. Leaks return unless there are routines to find them and a way to report them. Compare the baseline before and after to see the result.

Starting data

To start, it helps to have:

  • Compressor make, model, rated power and controls
  • Operating pressure settings and the lowest pressure the processes need
  • Operating hours and shift pattern
  • Any existing power, flow or pressure records

Frequently asked questions

How much leakage is acceptable?

Less is better, and the level that is practical depends on the plant. We measure the current level and set a target together.

Can leaks be found while the plant is running?

Yes. Ultrasonic detectors work in noisy plants.

Do I need to stop production to measure leakage?

One way to estimate it is to measure compressor load with consumption stopped, but other methods avoid a stop.

Field guide

Leak reduction: often the cheapest air you can buy

Leaks are compressed air you pay for and never use. In many plants they account for a large share of compressor output, and they run 24 hours a day whenever the system is pressurised.

Find them

  • Weekend or shutdown test: with production stopped, note how often the compressor loads, or how fast receiver pressure falls. What it delivers then is mostly leakage.
  • Ultrasonic detector: finds leaks you cannot hear in a noisy plant.
  • Soap solution on accessible fittings.

Where they usually are

Quick couplings, hose connections, filter-regulator-lubricator units, drain valves stuck open, pipe threads, worn cylinder seals and tools left connected.

Make it stick

  1. Tag each leak, record its size estimate and location.
  2. Fix the biggest first; many need only a new fitting or seal.
  3. Re-test after repair and record the drop in demand.
  4. Repeat the survey regularly, because leaks return.
  5. Isolate idle areas and machines with valves when they are not working.

Use the leak cost calculator to put a figure on what your leaks cost each year.

What to send for a quotation

  • Compressor make, model and rated power of each machine.
  • Electricity tariff and annual running hours.
  • Typical pressure at the compressor and at the furthest user.
  • Any measurements you already have (power, flow, loaded hours).

Send it through find my part or the spare parts enquiry, or call +91 99590 60718 or +91 92468 88812.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812