01 — Engineering answer
A useful compressed-air audit enquiry defines the engineering decision to be supported, which systems and operating states matter, what measurements already exist, the access and safety constraints, and what evidence the customer expects from the study. It is a scope-definition intake, not a completed audit, certified measurement, guaranteed savings estimate or commitment to deploy instruments.
02 — Unique page ownership
Keep these page intents distinct.
03 — Audience and decisions
Serve plant engineers, energy managers, maintenance teams, utilities operators, consultants and procurement leads. Primary decision options: baseline energy use; compressor capacity; demand and leakage; pressure instability; air quality; sequencing; distribution restriction; equipment replacement; post-project verification; reliability or resilience.
04 — Define the decision before sensors
Require a short decision question: “Which option will these measurements help us choose?” Examples include whether to repair leaks before adding capacity, whether a downstream pressure issue is due to distribution, or whether a control upgrade can be justified. Do not start with a fixed instrument package.
05 — Scope boundary selector
Choose machine, compressor station, treatment train, distribution branch, full network or end-use process. Ask whether external rental or backup compressors share the header. Capture boundaries in plain language and attach a schematic if available. The audit proposal must not silently expand scope.
06 — Audit category branches
Offer energy baseline, air-demand profile, pressure profile, leakage survey, air-quality sampling, treatment loss, controls and sequencing, capacity assessment, temporary-air planning, post-intervention M&V and integrated plant review. Branch follow-up questions by category; avoid forcing unrelated laboratory or power-meter inputs.
07 — What a baseline means
Ask for the relevant representative periods: shifts, weekends, shutdowns, batch peaks and seasonal cycles. A short site visit can identify opportunities but may not establish an annual duty profile. The customer may submit existing records without claiming they are representative.
08 — Operating schedule
Capture daily shifts, operating days, planned downtime, peak production periods, process changeovers, intermittent loads, simultaneous demand events and special operating modes. Ask what operating conditions must be witnessed for the requested decision.
09 — Compressor inventory
Optional make, model, type, nominal capacity, pressure rating, control mode, operating hours and installed power. Capture the number of operating, standby and rental machines. Mark specifications as nameplate or customer reported until independently verified.
10 — Pressure measurement brief
Identify compressor discharge, common header, dryer/filter inlet and outlet, remote branches and critical point-of-use locations. Capture gauge/absolute basis, desired recording interval, operating states and pressure band. Request safe access information, not instructions for customers to open live or pressurised systems.
11 — Flow measurement brief
Record whether flow data exist, reference volume conditions, known flow-meter locations, pipe diameters, straight-run constraints and likely variability. A rated compressor capacity is not measured system flow. Measurement feasibility must be confirmed after survey and instrument review.
12 — Electrical power measurement brief
Identify proposed meter boundary, compressor packages, dryers, cooling equipment and auxiliary loads. Ask about electrical panel access, site-authorised electricians and available permanent submeters. Do not ask a customer to attach probes to live equipment.
13 — Leakage assessment brief
Collect reported leak locations, production versus non-production operating periods, existing leak tags, repair history and whether equipment can be isolated safely. An ultrasonic survey detects likely leaks but does not alone prove electrical savings; define follow-up verification separately.
14 — Air quality sampling brief
Ask what contaminant matters—moisture, particles, oil or process-specific risk—at which point, under which operating conditions and to what customer acceptance criterion. Identify sampling permissions and potential process contamination sensitivity. Do not assume every test method is appropriate for every duty.
15 — Distribution and restriction study
Capture available P&IDs, pipe sizes, known modifications, critical users, valve/filter inventories and pressure complaints. Require simultaneous pressure and flow context to distinguish actual distribution losses from changed demand.
16 — Controls and sequencing study
Ask for compressor operating states, setpoints, control philosophy, trim/base strategy, alarm history and whether controller trends are exportable. Avoid promising a control optimisation outcome before duty, OEM limits and operating constraints are reviewed.
17 — Storage and transients
Record receiver locations, nominal volumes, pressure bands, duration of critical bursts and observed pressure recovery. A receiver calculation needs actual transient flow and allowable pressure range; a nameplate volume is not enough.
18 — Treatment and condensate
Ask about dryers, filtration, drains, bypasses, condensate management, dew-point complaints and pressure losses. Any measurement plan must preserve safe treatment operation and avoid introducing contaminants into product-critical lines.
19 — Existing evidence classification
Allow bills, trend logs, compressor controller exports, maintenance records, previous audits, drawings, test certificates, photos and process schedules. Tag each file as measured, estimated, manufacturer literature, historical or draft. Capture date, units, source and system boundary.
20 — Site access and permits
Request access windows, escort requirements, site induction, permit-to-work rules, safe isolation policies, hazardous areas, working-at-height limitations, electrical restrictions and network/IT permissions. Actual survey method requires site approval and qualified personnel.
21 — Production continuity
Ask whether logging can occur during normal production, whether a shutdown is required for sensor installation and what processes must never be interrupted. Include customer-authorised safe work windows and escalation contacts; never infer that intrusive testing is permitted.
22 — Data governance
Ask whether controller exports, metering files and photographs contain confidential process data. Specify secure upload, least-privilege access, retention owner, redaction requirements and no public use without separate consent. Audit enquiry consent is not marketing or case-study consent.
23 — Timebase and resolution
For available trends, collect timestamp format, timezone, sample interval, logging period and gaps. A 15-minute average may hide a short pneumatic transient; a high-frequency sample may be unnecessary for a monthly energy baseline. Choose resolution against the decision.
24 — Instrument suitability
Request existing instrument IDs, ranges, last calibration dates and evidence if available. Do not reject an enquiry because records are missing; instead create a measurement-readiness gap.
25 — Preliminary measurement plan
The technical reviewer proposes variables, measurement locations, operating states, logging duration, instrument type, access method, data ownership and quality controls. Mark all choices PROPOSED until the site feasibility and commercial scope are accepted.
26 — Measurement uncertainty
Ask what difference must be detectable to support the decision. A proposed 1% energy saving cannot be substantiated by an uncontrolled 5% measurement uncertainty. Define an uncertainty budget and measurement method during technical planning, not via an automated web estimate.
27 — Comparison readiness
For before/after work, ask whether baseline conditions are recorded, which intervention is planned, what concurrent changes are expected and what operating variables can be normalised.
28 — Project deliverable selector
Allow audit scope proposal, measurement plan, baseline dataset, pressure-flow profile, leakage register, equipment duty assessment, air-quality sampling plan, control review, engineering findings, prioritised opportunities and post-project verification plan. Distinguish requested deliverables from contracted deliverables.
29 — Decision acceptance criteria
Ask what the user will do with the results: approve capital expenditure, select compressor duty, identify root cause, document baseline, validate remedial action or support procurement. Capture target criteria and uncertainty expectations; route unsupported or unsafe criteria to engineering review.
30 — Commercial and timing constraints
Collect preferred audit window, project decision deadline, outage constraints, travel location and procurement status. Do not promise an attendance date, instrument availability, free audit or guaranteed return on investment. Any response timeline requires an approved service policy.
31 — Form minimum viable fields
Require contact method, city/state, audit objective, system or process description, desired decision, approximate operating schedule and privacy acknowledgement. Permit “unknown/not measured” for technical values. Avoid making optional documents a submission blocker.
32 — Progressive disclosure
Show tailored fields for energy, leakage, air quality, pressure or controls only after selection. Offer a summary before submission, retain data on back navigation and allow the user to request assistance defining a measurement scope.
33 — Units and validation
Pressure must specify bar(g), bar(a), kPa or psi and location; flow m³/min, L/s or cfm plus reference basis if known; power kW; energy kWh and period; temperature °C; dew point with pressure basis. Store original values and any conversions separately. Reject impossible date formats, not plausible engineering unknowns.
34 — Attachments
Support drawings, logs and reports with server-side file type/size validation, malware scanning, private storage and restricted retrieval. Provide accessible upload status and a way to remove a selected file. Do not expose filenames or plant drawings in analytics or public URLs.
35 — Intake states
Proposed workflow: submitted → security/data checks → scope review → clarification needed → technical feasibility review → proposed measurement plan → proposal/declined → accepted scope → closed. Each transition requires timestamp, assigned owner and customer-safe explanation.
36 — Routing
Route energy and controls, air quality, distribution, reliability and general audit requests to configured qualified owners or a monitored central engineering queue. Do not invent staff names, emergency dispatch or local availability. Escalate site safety or product-critical concerns through approved processes.
37 — Acknowledgement
Display success only after the server confirms durable receipt and routing. Provide a reference number, safe summary, what happens next and how to correct submitted information. Do not treat the acknowledgement as an accepted audit order.
38 — Failure recovery
Test timeouts, duplicate submissions, expired sessions, lost connection, invalid units, oversized files, unsupported MIME types, malware rejection, failed notification and inaccessible attachment controls. Never show “submitted” when the server has not stored the enquiry.
39 — Privacy and security
Use approved privacy notice, purpose limitation, CSRF protection, rate limits, role-based access, secure storage and retention/deletion policy. Marketing opt-in must be separate. Final legal wording and retention periods require jurisdiction-specific approval.
40 — Mobile and accessibility
Keyboard-operable fields, visible focus, semantic labels, fieldset legends, error summaries, screen-reader announcements, zoom and narrow-screen support are release requirements. Ensure unit selectors, file uploads, long descriptions and review summaries are usable without a mouse.
41 — Analytics and quality
Track aggregate form completion, audit-category choice, validation errors, attachment failures, time to intake review and data-gap rates without sending raw site data or personally identifying details to generic analytics. Track revisions to form questions and their impact on usability.
42 — Engineering boundary
All intrusive testing requires qualified staff and site-authorised methods.
43 — Evidence and standards applicability
Potential method families include ISO 11011 for compressed-air energy assessment, ISO 8573 where air-quality measurements are relevant, and ISO/IEC 17025 for competence of testing/calibration laboratories. Applicability, edition and measurement method must be reviewed per engagement; this page makes no certification or accreditation claim.