All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Reddy Compressors

KAESER Compressor Sales, Service and Spares

4 min read7 sections

KAESER compressors we work on

  • Oil-injected rotary screw compressors (for example the SK, ASD and BSD families).
  • Refrigerated and desiccant dryers and line filters.
  • Portable diesel compressors (for example the MOBILAIR family).

KAESER installations are often part of a larger system with a dryer, filters and a central controller. Service should cover the whole station: filters and separators on the compressor, dryer performance, drain function and the pressure settings that decide how much energy the system uses.

KAESER compressor service and repair

We service and repair KAESER compressors on site, as one-off visits or under an annual maintenance contract. Typical work includes:

  • Scheduled services with filter, separator and fluid changes.
  • Controller alarm and sensor diagnosis.
  • Dryer and drain checks.
  • Cooler cleaning and temperature fault finding.
  • Leak and pressure-drop checks around the station.
  • Airend inspection and overhaul planning.

Every job is identified by the machine's model and serial number, and ends with a written record of what was checked, measured and replaced. Where a repair would cost more than the machine is worth, we tell you before starting.

KAESER spare parts

We supply air filters, oil filters, separators, compressor fluid, service kits, drain parts, filter elements and other parts for KAESER machines. Parts are matched from the nameplate details, model and serial number, the part number on the old part where it is readable, and the machine's running hours. Send a photo of the nameplate and the old part through find my part and we will confirm the match before quoting.

Across brands

Models we supply and service

Yellow Kaeser Kerr piston compressors in horizontal, vertical and twin layouts
Kaeser / KerrPiston Compressor Range

Manufacturer product images, shown to identify machines we sell, service and support. Brand names are trademarks of their owners.

Buying a KAESER compressor, new or used

If you are considering a KAESER machine, we can supply new or used and refurbished units where available, and compare them honestly with other makes for your duty. The choice should follow the pressure, air demand, running hours, air quality and service plan, not the badge.

Hire while your KAESER compressor is down

If your KAESER compressor is out of service for repair or overhaul, a breakdown rental from our fleet of 50 to 2,000 CFM machines can keep the site running until it returns.

Signs your KAESER compressor needs attention

  • High discharge temperature or temperature trips: often a blocked cooler, low or degraded oil, a sticking thermostatic valve or a hot, poorly ventilated room.
  • Oil in the air lines: commonly a saturated separator, a blocked scavenge line or overfilling.
  • Pressure falling under load: demand above capacity, leaks, a blocked intake filter, a worn valve or an unloader fault.
  • Frequent loading and unloading: too small a receiver, a narrow pressure band or a leak on the system.
  • New noise or vibration: bearing wear, loose mountings, belt or coupling problems. Stop and inspect before it gets worse.
  • Water at the point of use: a failed drain, an overloaded or faulty dryer, or no dryer where one is needed.
  • Hard starting on a diesel portable: battery, starter, fuel filters or fuel quality.

Write down any alarm code on the controller and the readings at the time. That information often lets us bring the right parts on the first visit.

Questions about KAESER compressors

Will independent service affect my KAESER warranty?

Check your warranty terms before any work is done while the machine is under manufacturer warranty. Some warranties require service by an authorised partner. Once the warranty has ended, or for work the warranty does not cover, an independent multi-brand service provider can maintain the machine. We will ask about warranty status before we start.

Do you fit original KAESER parts?

We can supply original manufacturer parts or quality compatible alternatives. The quotation always states which, so that you can choose with full information.

Can you service the KAESER dryer and filters as well?

Yes. Dryers, line filters and drains are checked as part of the system, because wet or dirty air can cause problems even when the compressor is healthy.

How quickly can you reach my site?

It depends on where the site is and what is already booked. Sites in Hyderabad and Secunderabad are the quickest to reach. When you call, we give you a realistic time.

What to send us

  • Model and serial number (nameplate photo).
  • Running hours.
  • The fault or the service due, with any controller alarm codes.
  • Site location.

Call +91 99590 60718 or +91 92468 88812, email reddycompressors@gmail.com, or use the service enquiry. See also all brands we support.

KAESER is a trademark of its owner. Reddy Compressors is an independent multi-brand compressor business and is not an authorised KAESER distributor, dealer or service partner unless this is stated in writing for a specific product. Where we supply parts, the quotation states whether they are original manufacturer parts or compatible alternatives.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812