REDDY COMPRESSORS

Compressors

BLOWERS vs COMPRESSORS

11 min read10 sections
Variable-speed rotary screw air compressor
Variable-speed screw compressor. Representative image.

The first principle

Industrial blowers as machines that move:

Large volumes of air or gas

at a:

Relatively low pressure rise

compared with conventional compressed-air systems.

That is the most useful starting distinction.

But the boundary should not be reduced to:

“Blower = below x bar.”

BLOWER vs COMPRESSOR IN ONE ENGINEERING SENTENCE

A blower is generally selected to move large flow through a relatively low differential pressure

While a compressor is generally selected where a greater pressure increase is required

But the actual equipment must be selected from flow, pressure ratio, system curve, medium, duty & manufacturer operating envelope

Important terminology warning

The words:

Blower

and:

Compressor

are not always completely separate machine families.

The uploaded compressed-air engineering manual actually describes a Roots blower as a:

“VALVE-LESS DISPLACEMENT COMPRESSOR WITHOUT INTERNAL COMPRESSION.”

That is important.

The selection equation

Medium / gas+Required volume or mass flow+Inlet absolute pressure+Outlet absolute pressure+Differential pressure+Compression ratio+System resistance curve+Minimum / normal / peak demand+Turndown+Temperature+Contamination+Control method+Noise / heat / reliability+Lifecycle performance=Blower or compressor technology decision

01 — START WITH THE DUTY—not THE NAME

Do not begin with:

“Do I need a blower or a compressor?”

Begin with:

“What flow must move through what pressure difference?”

Duty should be defined from:

  • Required Inlet Pressure
  • Required Outlet Pressure

and:

Total System Resistance

rather than simply:

bar

or:

Motor kW.

02 — flow is a primary variable

Blowers are often associated with:

High-volume flow

Compressors can also deliver high flow.

Therefore:

High CFM alone does not define a blower

Flow must always be paired with pressure requirement.

03 — pressure rise is the central distinction

The phrase:

Relatively low pressure rise

for industrial blowers compared with conventional compressed-air systems.

This is more defensible than publishing an unsupported universal pressure threshold.

Differential pressure

That means evaluating the difference between:

Inlet pressure

and:

OUTLET PRESSURE.

05 — gauge pressure alone can be misleading

The authoritative blower-pressure page says:

GAUGE PRESSURE ALONE CAN HIDE IMPORTANT INLET-CONDITION EFFECTS.

This matters particularly for:

  • Vacuum
  • Altitude
  • Low-Pressure Air

and:

Process-Gas Duty.

USE ABSOLUTE PRESSURE FOR COMPRESSION RATIO.

A useful conceptual relation is:

Compression Ratio = Absolute Outlet Pressure / Absolute Inlet Pressure

07 — why absolute pressure matters

Suppose a machine is used in vacuum duty.

The outlet may still be near atmospheric pressure.

But the inlet pressure is lower than atmosphere.

The pressure relationship cannot be correctly understood from discharge gauge pressure alone.

08 — altitude can matter more than buyers expect

For low-pressure machines, changes in:

Inlet Pressure

or:

Altitude

can materially affect:

Density

and:

  • Mass Flow
  • This is particularly important in blower applications

09 — volume flow & mass flow are not identical

Blower duty can be specified in volume flow.

But if inlet:

  • Temperature
  • Pressure

or:

  • Gas Composition
  • changes, the corresponding mass flow can change
  • Therefore reference conditions matter

10 — state the flow basis

Flow should be identified as:

  • Actual
  • Normal

or:

  • Standard
  • with the associated reference temperature and pressure

Therefore:

“1000 m³/h” WITHOUT CONDITIONS MAY BE AN INCOMPLETE SPECIFICATION

11 — motor power does not define whether a machine is a blower or compressor

Against selecting a blower from:

MOTOR kW

alone.

The same logic applies to blower-versus-compressor comparison.

12 — free-air flow alone does not define it either

In practice:

NO BLOWER SELECTION FROM FREE-AIR FLOW ALONE.

You need:

  • Flow Basis
  • Inlet Conditions
  • Differential Pressure

and:

Operating Envelope.

13 — system resistance defines the operating point

The blower hub says:

  • Piping
  • Diffusers
  • Filters
  • Valves

and:

  • Process Backpressure
  • determine the real operating point

14 — the machine does not choose its operating point in isolation

The operating point emerges from:

Machine characteristic

interacting with:

System resistance

This is particularly important for dynamic blowers.

15 — system curve matters

The controlled selection guide specifically lists:

System curve

among the system-dynamics inputs required for blower selection.

Therefore:

Blower selection = machine + system

16 — blowers are not one technology

The Reddy blower hub explicitly separates:

  • Positive-Displacement
  • Screw
  • Turbo

and:

  • Side-Channel
  • blower technologies
  • These technologies do not behave identically

17 — compressors are also not one technology

The wider Reddy compressor architecture includes:

  • Reciprocating
  • Rotary Screw
  • Scroll
  • Tooth
  • Centrifugal

and:

  • Axial
  • compression

Therefore:

BLOWER vs COMPRESSOR

is not a comparison between two individual machine types.

18 — positive-displacement blowers

Positive-displacement blowers—commonly rotary-lobe machines—deliver approximately:

Fixed displacement per revolution

and are widely used for:

  • Aeration
  • Pneumatic Conveying
  • and other low-pressure air/gas duties

19 — roots / rotary-lobe blower principle

The uploaded compressor manual describes a Roots blower as a:

VALVE-LESS DISPLACEMENT COMPRESSOR WITHOUT INTERNAL COMPRESSION.

Two synchronised counter-rotating rotors operate inside the housing.

20 — roots blower pressure development differs from internal-compression machines

The manual explains that a Roots blower does not internally compress the trapped gas in the same way as an internal-compression screw machine.

When the trapped volume opens to the outlet, pressure-side gas influences the chamber.

This is a significant technology distinction.

21 — positive-displacement blowers can continue moving flow against rising resistance

PD blowers can continue to displace flow against increasing resistance.

Therefore:

RELIEF & CONTROL ARE ESSENTIAL.

22 — this makes overpressure protection important

A blocked or highly restrictive system does not automatically stop a positive-displacement machine from attempting to displace volume.

Protection must follow the actual blower/package design.

23 — screw blowers

Screw blowers use:

Internal compression

to produce low-pressure air.

This distinguishes them from simple external-compression lobe blowers.

24 — screw blower ≠ rotary screw air compressor

Both may use screw-type rotors.

But their:

  • Pressure Duty
  • Package Design
  • Operating Envelope

and:

  • Application
  • can differ

25 — turbo / centrifugal blowers

The controlled blower hub identifies turbo technology as another blower class.

These are dynamic machines.

26 — centrifugal blower ≠ centrifugal plant-air compressor

Both may use centrifugal aerodynamic principles.

But the intended:

Pressure rise

and:

Process duty

can be different.

27 — side-channel blowers

Key points:

Side-channel

as a distinct blower technology.

28 — technology names can cross the blower / compressor boundary

Examples in the source include:

  • Screw Blower / Screw Compressor
  • Centrifugal Blower / Centrifugal Compressor
  • and a Roots blower described technically as a displacement compressor

Therefore:

Technology principle ≠ duty classification

29 — the process duty defines which version of the technology you need

A centrifugal machine operating at a relatively low pressure rise can serve blower duty.

A centrifugal compressor may serve a significantly different pressure duty.

Similarly, screw machines exist on both sides of the terminology.

30 — do not use a universal bar cutoff without an agreed standard

Many industry sources classify blowers and compressors by pressure ratio or pressure rise.

unless a later standards-controlled source explicitly establishes the classification being used.

31 — pressure duty should be stated directly instead

A more useful specification is:

Inlet pressure

  • Outlet pressure
  • Differential pressure
  • Absolute compression ratio
  • Required flow

That avoids semantic ambiguity.

32 — pressure service & vacuum service must be separated

A machine configured for:

Suction / vacuum duty

can have different:

Cooling

and:

  • Operating Limits
  • from positive-pressure duty
  • So the same basic machine family may not have identical ratings in both modes

33 — “vacuum blower” does not mean the same thing as a positive-pressure blower

Always define:

  • Inlet Absolute Pressure
  • Outlet Absolute Pressure
  • Differential Pressure
  • Flow Basis

34 — compressor duty generally emphasises pressure delivery

Conventional compressed-air systems commonly focus on delivering air at a required working pressure to:

  • Pneumatic Equipment
  • Plant Headers
  • Tools
  • Process Equipment
  • and other users

35 — blower duty generally emphasises moving large flow against system resistance

Typical blower design asks:

How much air?

through:

What resistance / differential pressure?

This is often more meaningful than simply asking for a discharge “bar” value.

36 — aeration is a blower-type duty in the controlled source

Positive-displacement blowers are explicitly identified for:

AERATION.

Later pages will address wastewater and aquaculture aeration separately.

37 — pneumatic conveying is also a blower application

Both the Reddy source and the uploaded compressor manual identify pneumatic conveying as a blower application.

But conveying duty can vary widely.

Final selection remains project-specific.

38 — BLOWER APPLICATIONS CAN INCLUDE PROCESS AIR—not JUST “VENTILATION”

The controlled Reddy architecture includes dedicated blower pages for:

  • Wastewater
  • Pneumatic Conveying
  • Combustion Air
  • Fermentation

and:

  • Aquaculture
  • Therefore blowers are industrial process machines, not merely large fans

39 — “fan, blower, compressor” should not be reduced to casual terminology

The important lesson is:

Nameplate terminology is not enough

Use actual:

  • Pressure
  • Flow
  • Compression Ratio

and:

Operating Envelope.

40 — system curve can make the same blower behave differently in two installations

If one system contains more:

  • Piping Resistance
  • Diffuser Resistance
  • Filter Pressure Drop
  • Valve Loss

or:

  • Process Backpressure
  • the operating point changes

42 — pressure drop is especially important at low-pressure duty

Where the total pressure rise is relatively small, a restriction can consume a significant share of the available differential pressure.

Therefore:

  • Filters
  • Diffusers
  • Silencers
  • Piping

and:

  • Valves
  • must be evaluated as part of the system

43 — control philosophy differs by technology

In practice:

  • Positive-Displacement
  • Screw
  • Turbo

and:

Side-Channel

technologies behave differently across:

  • Flow
  • Pressure

and:

  • Turndown
  • Therefore one control philosophy should not be applied to every blower

44 — turndown matters

A blower that performs well at design duty may not be the best machine if the actual process spends much of its time at reduced flow.

The controlled selection guide requires:

Turndown

to be evaluated as part of system dynamics.

45 — seasonal variability matters

The selection guide also requires:

SEASONAL VARIABILITY.

This can be important for:

  • Wastewater
  • Aquaculture
  • Process Plants
  • and other variable-load systems

46 — start frequency matters

This includes:

Start frequency

as a selection input.

Different technologies and drive/control systems may tolerate starts differently.

Exact limits remain manufacturer-specific.

47 — redundancy matters

The selection guide includes:

REDUNDANCY.

For process-critical aeration or conveying systems, loss of the blower can be a production or biological-risk event.

No universal N+1 rule is supported.

48 — future expansion matters

This includes:

Future expansion

in system-dynamics review.

Do not oversize blindly.

Evaluate credible future flow and pressure changes.

49 — gas medium matters

The blower hub says selection depends partly on the:

GAS MEDIUM.

Air is not the only possible medium.

50 — temperature matters

This includes:

Temperature

as a technology-selection variable.

Actual inlet and discharge limits must come from model data.

51 — contamination matters

This includes:

CONTAMINATION.

A clean-air aeration duty and a contaminated process-gas duty may require different technologies and materials.

52 — oil-contact requirements matter

The controlled selection guide says to define:

Allowable oil / contact conditions

during process-requirement definition.

Do not assume every blower is automatically suitable for contamination-sensitive processes.

53 — “oil-free blower” does not define complete air quality

Even when the compression chamber is oil-free, final gas/air condition can still depend on:

  • Inlet Contamination
  • Seals
  • Piping

and:

  • Downstream System
  • This is consistent with the site's wider air-quality governance

54 — noise can be a major blower consideration

The blower hub explicitly includes:

NOISE

in whole-lifecycle comparison.

Positive-displacement blower pages additionally identify silencers and piping layout as acoustic/vibration considerations.

55 — heat also matters

This includes:

HEAT

in blower lifecycle comparison.

Package cooling and installation must match the actual duty.

56 — efficiency comparison must be at the actual duty

Whole-lifecycle performance should be compared at:

EXPECTED DUTY POINTS.

Not from a generic efficiency label.

57 — do not claim one blower technology is always most efficient

It requires comparison at the:

Actual system duty

using:

CURRENT SUPPLIER PERFORMANCE DATA.

58 — do not copy generic energy-saving percentages

Manufacturer saving percentages are:

Comparison-specific

and must not be converted into Reddy project outcomes.

59 — COMPARE LIFECYCLE—not ONLY INITIAL PURCHASE PRICE

The blower hub tells the site to compare:

  • Efficiency
  • Controls
  • Maintenance
  • Noise
  • Heat

and:

  • Process Reliability
  • at the expected duty points

60 — BLOWER vs COMPRESSOR — CONTROLLED COMPARISON

Engineering Factor

Blower

Compressor

Primary duty

Large flow with relatively low pressure rise

Higher-pressure compressed-air/gas duty

Selection basis

Flow + differential pressure + system curve

Flow + required pressure + demand/duty

Inlet pressure importance

Very important

Important

Outlet pressure

Application-specific

Application-specific

Compression ratio

Must use absolute pressures

Must use absolute pressures

Typical technologies

PD/lobe, screw, turbo, side-channel

Piston, screw, scroll, tooth, centrifugal, axial

Vacuum duty

Common in some blower families

Vacuum handled by dedicated architectures

System curve

Central to blower operating point

Still important in compressor-system design

Universal pressure cutoff

Not established by current source

Not established by current source

Selection by motor kW

No

No

Selection by nominal flow alone

No

No

61 — when a blower may be the right technology to investigate

Blower evaluation when the application involves:

  • Large Flow
  • Relatively Low Pressure Rise

and a process such as:

  • Aeration
  • Pneumatic Conveying
  • Combustion Air
  • Fermentation

or:

  • Aquaculture
  • Actual technology then depends on duty

62 — when a conventional compressor may be the better technology to investigate

When the process requires a substantially greater pressure increase for:

  • Plant Pneumatics
  • Tools
  • Controls
  • Process Equipment

or another pressure-air use, conventional compressor technology may be more appropriate.

The exact crossover remains project-specific.

63 — do not use a blower to solve a pressure problem it was not designed for

If system pressure demand exceeds the machine's approved operating envelope, selecting a larger motor does not convert the blower into the correct compressor.

Use the right technology.

64 — do not use a high-pressure compressor to solve a low-pressure high-flow duty without analysis

If a process only needs low differential pressure, generating unnecessarily high pressure and then reducing it can be inefficient.

65 — “right pressure” matters as much as “right air”

This aligns with the wider Reddy engineering standard:

Right air

  • Right pressure
  • Right condition
  • Right duty

A blower or compressor should create only the pressure actually required by the process.

66 — blower pressure duty & vacuum duty should be specified differently

For positive-pressure service:

  • Inlet Pressure
  • Outlet Pressure
  • Differential Pressure
  • Flow

For vacuum service:

the same variables remain necessary, but inlet absolute pressure becomes especially important.

The cooling/operating limits can differ between these two modes.

67 — model data required before final selection

For a blower, request:

  • Manufacturer
  • Exact Model
  • Technology
  • Medium
  • Actual / Normal / Standard Flow Basis
  • Inlet Pressure
  • Outlet Pressure
  • Differential Pressure
  • Compression Ratio
  • Inlet Temperature
  • Power
  • Operating Map
  • Turndown
  • Control Method
  • Cooling
  • Noise Data
  • Oil-Contact / Air-Quality Status
  • Relief Requirements
  • Dimensions / Weight
  • Maintenance Requirements
  • Current Availability
  • Reddy Capability / Relationship State

For a compressor, corresponding verified flow, pressure, input-power, duty, air-quality, control and model data remain necessary.

68 — customer data to request

For a blower-versus-compressor enquiry:

What Is the Process?

What Medium Is Being Moved?

Required Average Flow?

Required Peak Flow?

Inlet Absolute Pressure?

Outlet Absolute Pressure?

Required Differential Pressure?

Positive Pressure or Vacuum?

Actual / Normal / Standard Flow?

Reference Temperature / Pressure?

Operating Hours?

Turndown?

Seasonal Variation?

System Resistance / Piping?

Filters / Diffusers / Valves?

Process Backpressure?

Contamination?

Oil-Contact Restrictions?

Noise Limits?

Redundancy?

Future Expansion?

Only then shortlist blower or compressor technologies.

69 — the selection gate

What does the process need?

Start here.

How much flow?

Average + peak.

What is inlet pressure?

Absolute.

What is outlet pressure?

Absolute.

What is differential pressure?

Essential for blower screening.

What is the compression ratio?

Use absolute pressures.

Is the duty positive pressure or vacuum?

Separate them.

What does the system curve look like?

Include piping, diffusers, filters, valves and process resistance.

What turndown is required?

Actual load profile.

What medium?

Air or process gas?

What contamination / oil-contact requirements apply?

Process-specific.

Which technology fits the envelope?

PD / screw / turbo / side-channel / compressor technology.

What do current supplier curves show?

Validate before selection.

Then decide.

BLOWERS vs COMPRESSORS IN ONE LINE

Blowers generally serve large-flow, relatively low-pressure-rise duties, while compressors generally serve greater pressure-rise duties

BUT THE CORRECT EQUIPMENT IS DETERMINED BY THE ACTUAL INLET PRESSURE, OUTLET PRESSURE, DIFFERENTIAL PRESSURE, COMPRESSION RATIO, FLOW, SYSTEM CURVE, MEDIUM, TURNDOWN & OPERATING ENVELOPE—not BY THE NAME ON THE MACHINE

Closing

  • Do not ask only
  • “Blower or compressor?”

Ask:

What flow?

What inlet pressure?

What outlet pressure?

What differential pressure?

What compression ratio?

What system resistance?

What medium?

What duty profile?

It also establishes the system approach: piping, diffusers, filters, valves and process backpressure determine the operating point, while positive-displacement, screw, turbo and side-channel technologies behave differently across their flow, pressure and turndown envelopes.

The specification discipline: use inlet pressure, outlet pressure, differential pressure and required flow together; use absolute pressure for compression ratio; state the flow reference conditions; and place the operating point on the real system curve and manufacturer envelope.

And the Roots-blower engineering reference demonstrates why terminology cannot be treated as an absolute technical boundary: it describes a Roots blower as a valve-less displacement compressor without internal compression and identifies it primarily with very-low-pressure duties, vacuum and pneumatic conveying.

Reddy compressors

  • Compressed air. engineered for the actual duty
  • Define the process
  • Define the flow
  • Define inlet pressure
  • Define outlet pressure
  • Calculate differential pressure
  • Use absolute pressure for compression ratio
  • Build the system curve
  • Define turndown
  • Define the medium
  • Screen the technologies
  • Verify current performance curves
  • Select the machine that fits the operating point
  • Primary CTA

Help Me Choose: Blower or Compressor

Secondary CTAs

Submit My Flow & Pressure Requirement

Review Blower Pressure / Vacuum Duty

Compare Roots, Screw & Turbo Blowers

Review the System Resistance Curve

Request Application Engineering

Field guide

Compressor, blower or vacuum pump: the three-way choice

All three move gas, but each is built for a different job. The simplest way to remember it: a compressor makes pressure, a blower makes flow, and a vacuum pump makes vacuum.

Air compressorBlowerVacuum pump
JobStore usable energy as pressureMove large volumes at modest pressureRemove gas to reach pressure below atmospheric
Typical rangeIndustrial plants commonly 7 to 16 bar; special duties go far higherUp to about 2 barRough vacuum through high and ultra-high vacuum
Common typesScrew, reciprocating, scroll, centrifugal, axialRoots, screw, centrifugal, side channelRotary vane, liquid ring, dry screw, Roots booster, turbomolecular
Typical usesTools, automation, painting, packaging, instrument airWastewater aeration, conveying, combustion air, ventilationPackaging, drying, degassing, holding and lifting, coating, semiconductor

Choosing between them

  1. Start with the pressure or vacuum level the process needs
  2. Then the flow, and whether it varies through the day
  3. Check the gas: clean air, humid, dusty, or carrying vapour
  4. Check contamination limits (oil-free or dry running)
  5. Compare energy cost over the machine’s life, not only price
  6. Plan redundancy and maintenance access

Using a compressor to do a blower’s job, or the other way round, wastes energy. Aeration at 0.5 to 1 bar served by a 7 bar compressor is a classic example. For the technologies see Roots blowers, screw blowers, side-channel blowers, industrial vacuum systems and vacuum selection.

Efficiency and monitoring

Energy is the largest running cost for all three. Variable-speed drives, good controls, leak control and heat recovery help. Vibration, temperature, pressure, flow and power trends reveal faults early; see maintenance and condition monitoring.

Related pages