COMPRESSED-AIR CONDENSATE DRAIN RELIABILITY & AIR-LOSS ENGINEERING
Its safeguard prohibits response-time, certified-technician, OEM-authorised, uptime or all-brand service claims without current documented capability and commercial terms. That legacy service identity remains separately preserved.
Provisional new-series slug: /compressed-air-engineering/condensate-drain-reliability-air-loss/ | CTA: Review My Condensate Drain System
A drain that does not remove liquid can damage air quality. a drain that removes compressed air with the liquid can become a permanent energy leak
Drains can exist at aftercooler separators, wet receivers, filters, refrigerated dryers, adsorption prefilters, distribution low points and other collection points. Each location has a different condensate load, pressure, contamination profile and failure consequence.
The engineering objective is reliable liquid removal with minimum unintended compressed-air loss, without allowing blocked discharge, backpressure, freezing, contamination or unsafe/manual workarounds. Exact drain type, orifice, timer settings, valve size, discharge routing, condensate-treatment requirement and environmental obligations remain equipment-, site- and jurisdiction-specific.
1 — Drain Point Identity
Drain-System Foundation: govern drain point identity at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.

2 — Upstream Equipment
Drain-System Foundation: govern upstream equipment at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
3 — Drain Technology
Drain-System Foundation: govern drain technology at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
4 — Operating Pressure
Drain-System Foundation: govern operating pressure at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
5 — Condensate Load
Drain-System Foundation: govern condensate load at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
6 — Liquid Composition Boundary
Drain-System Foundation: govern liquid composition boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
7 — Discharge Destination
Drain-System Foundation: govern discharge destination at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
8 — Isolation Arrangement
Drain-System Foundation: govern isolation arrangement at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
9 — Test Function
Drain-System Foundation: govern test function at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
10 — Air-Loss Boundary
Drain-System Foundation: govern air-loss boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
11 — Backpressure Boundary
Drain-System Foundation: govern backpressure boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
12 — Ambient Condition
Drain-System Foundation: govern ambient condition at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
13 — Freeze Risk
Drain-System Foundation: govern freeze risk at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
14 — Criticality
Drain-System Foundation: govern criticality at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
15 — Revision Control
Drain-System Foundation: govern revision control at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
16 — Aftercooler Condensation
Condensate Formation Context: govern aftercooler condensation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
17 — Receiver Condensation
Condensate Formation Context: govern receiver condensation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
18 — Filter Liquid Collection
Condensate Formation Context: govern filter liquid collection at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
19 — Refrigerated-Dryer Condensate
Condensate Formation Context: govern refrigerated-dryer condensate at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
20 — Adsorption-Prefilter Liquid
Condensate Formation Context: govern adsorption-prefilter liquid at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
21 — Distribution Low-Point Liquid
Condensate Formation Context: govern distribution low-point liquid at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
22 — Ambient Humidity
Condensate Formation Context: govern ambient humidity at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
23 — Inlet Temperature
Condensate Formation Context: govern inlet temperature at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
24 — Compressed-Air Temperature
Condensate Formation Context: govern compressed-air temperature at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
25 — Pressure Effect
Condensate Formation Context: govern pressure effect at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
26 — Flow/Load Effect
Condensate Formation Context: govern flow/load effect at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
27 — Seasonal Moisture Load
Condensate Formation Context: govern seasonal moisture load at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
28 — Startup Transient
Condensate Formation Context: govern startup transient at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
29 — Shutdown Condensation
Condensate Formation Context: govern shutdown condensation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
30 — Process Contamination Boundary
Condensate Formation Context: govern process contamination boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
31 — Manual Drain
Drain Technology Architecture: govern manual drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
32 — Timed Solenoid Drain
Drain Technology Architecture: govern timed solenoid drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
33 — Float/Mechanical Drain
Drain Technology Architecture: govern float/mechanical drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
34 — Level-Sensing Drain
Drain Technology Architecture: govern level-sensing drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
36 — Electronic Drain
Drain Technology Architecture: govern electronic drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
37 — Pneumatic Drain Boundary
Drain Technology Architecture: govern pneumatic drain boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
38 — Integrated Dryer Drain
Drain Technology Architecture: govern integrated dryer drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
39 — Filter Drain
Drain Technology Architecture: govern filter drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
40 — Receiver Drain
Drain Technology Architecture: govern receiver drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
41 — Separator Drain
Drain Technology Architecture: govern separator drain at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
42 — Test Button/Function
Drain Technology Architecture: govern test button/function at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
43 — Alarm Output Boundary
Drain Technology Architecture: govern alarm output boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
44 — Service Isolation
Drain Technology Architecture: govern service isolation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
45 — Redundancy Boundary
Drain Technology Architecture: govern redundancy boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
46 — Blocked Orifice
Failed-Closed Failure Modes: govern blocked orifice at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
47 — Contaminated Valve
Failed-Closed Failure Modes: govern contaminated valve at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
48 — Stuck Mechanism
Failed-Closed Failure Modes: govern stuck mechanism at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
49 — Loss Of Power
Failed-Closed Failure Modes: govern loss of power at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
50 — Sensor/Level Failure
Failed-Closed Failure Modes: govern sensor/level failure at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
51 — Closed Isolation Valve
Failed-Closed Failure Modes: govern closed isolation valve at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
52 — Blocked Discharge Line
Failed-Closed Failure Modes: govern blocked discharge line at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
53 — High Backpressure
Failed-Closed Failure Modes: govern high backpressure at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
54 — Frozen Line
Failed-Closed Failure Modes: govern frozen line at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
55 — Incorrect Installation
Failed-Closed Failure Modes: govern incorrect installation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
56 — Undersized Discharge Boundary
Failed-Closed Failure Modes: govern undersized discharge boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
57 — Oil/Sludge Contamination
Failed-Closed Failure Modes: govern oil/sludge contamination at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
58 — Failed Test Function
Failed-Closed Failure Modes: govern failed test function at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
59 — Liquid Accumulation
Failed-Closed Failure Modes: govern liquid accumulation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
60 — Downstream Carryover
Failed-Closed Failure Modes: govern downstream carryover at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
61 — Valve Stuck Open
Failed-Open / Air-Loss Modes: govern valve stuck open at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
62 — Timer Excessive Open Time
Failed-Open / Air-Loss Modes: govern timer excessive open time at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
63 — Timer Excessive Frequency
Failed-Open / Air-Loss Modes: govern timer excessive frequency at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
64 — Seat Contamination
Failed-Open / Air-Loss Modes: govern seat contamination at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
65 — Worn Seal
Failed-Open / Air-Loss Modes: govern worn seal at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
66 — Mechanical Float Fault
Failed-Open / Air-Loss Modes: govern mechanical float fault at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
67 — Sensor False Level
Failed-Open / Air-Loss Modes: govern sensor false level at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
68 — Manual Valve Left Open
Failed-Open / Air-Loss Modes: govern manual valve left open at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
69 — Test Function Left Active
Failed-Open / Air-Loss Modes: govern test function left active at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
70 — Broken Discharge Line
Failed-Open / Air-Loss Modes: govern broken discharge line at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
71 — Incorrect Pressure Boundary
Failed-Open / Air-Loss Modes: govern incorrect pressure boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
72 — Air Bypass
Failed-Open / Air-Loss Modes: govern air bypass at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
73 — Continuous Blow
Failed-Open / Air-Loss Modes: govern continuous blow at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
74 — Intermittent Waste
Failed-Open / Air-Loss Modes: govern intermittent waste at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
75 — Unnoticed Remote Loss
Failed-Open / Air-Loss Modes: govern unnoticed remote loss at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
76 — Timer Identity
Timed-Drain Engineering: govern timer identity at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
77 — Open Duration Boundary
Timed-Drain Engineering: govern open duration boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
78 — Cycle Interval Boundary
Timed-Drain Engineering: govern cycle interval boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
79 — Condensate-Load Variability
Timed-Drain Engineering: govern condensate-load variability at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
80 — Seasonal Setting Risk
Timed-Drain Engineering: govern seasonal setting risk at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
81 — Pressure Effect
Timed-Drain Engineering: govern pressure effect at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
82 — Orifice/Valve Size
Timed-Drain Engineering: govern orifice/valve size at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
83 — Air-Loss During Opening
Timed-Drain Engineering: govern air-loss during opening at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
84 — Under-Draining Risk
Timed-Drain Engineering: govern under-draining risk at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
85 — Over-Draining Risk
Timed-Drain Engineering: govern over-draining risk at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
86 — Manual Adjustment Control
Timed-Drain Engineering: govern manual adjustment control at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
87 — Configuration Record
Timed-Drain Engineering: govern configuration record at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
88 — Production-State Effect
Timed-Drain Engineering: govern production-state effect at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
89 — Verification Method
Timed-Drain Engineering: govern verification method at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
90 — Replacement Alternative Review
Timed-Drain Engineering: govern replacement alternative review at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
91 — Level Sensor
Level-Sensing / Demand Drain Reliability: govern level sensor at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
92 — Collection Chamber
Level-Sensing / Demand Drain Reliability: govern collection chamber at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
93 — Valve Mechanism
Level-Sensing / Demand Drain Reliability: govern valve mechanism at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
94 — Sensor Contamination
Level-Sensing / Demand Drain Reliability: govern sensor contamination at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
95 — Chamber Contamination
Level-Sensing / Demand Drain Reliability: govern chamber contamination at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
96 — Test Cycle
Level-Sensing / Demand Drain Reliability: govern test cycle at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
97 — Alarm/Fault Output
Level-Sensing / Demand Drain Reliability: govern alarm/fault output at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
98 — Power Supply
Level-Sensing / Demand Drain Reliability: govern power supply at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
99 — Fail-State Boundary
Level-Sensing / Demand Drain Reliability: govern fail-state boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
100 — Pressure Rating Boundary
Level-Sensing / Demand Drain Reliability: govern pressure rating boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
101 — Maximum Condensate Load Boundary
Level-Sensing / Demand Drain Reliability: govern maximum condensate load boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
102 — Discharge Capacity
Level-Sensing / Demand Drain Reliability: govern discharge capacity at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
103 — Air-Loss Verification
Level-Sensing / Demand Drain Reliability: govern air-loss verification at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
104 — Maintenance Access
Level-Sensing / Demand Drain Reliability: govern maintenance access at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
105 — Post-Service Proof
Level-Sensing / Demand Drain Reliability: govern post-service proof at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
106 — Drain Line Diameter Boundary
Discharge Piping & Backpressure: govern drain line diameter boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
107 — Line Length
Discharge Piping & Backpressure: govern line length at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
108 — Routing
Discharge Piping & Backpressure: govern routing at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
109 — Slope
Discharge Piping & Backpressure: govern slope at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
110 — Lift/Elevation Boundary
Discharge Piping & Backpressure: govern lift/elevation boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
111 — Common Drain Header
Discharge Piping & Backpressure: govern common drain header at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
112 — Backpressure
Discharge Piping & Backpressure: govern backpressure at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
113 — Check Valve Boundary
Discharge Piping & Backpressure: govern check valve boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
114 — Blocked Line
Discharge Piping & Backpressure: govern blocked line at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
115 — Freeze Protection
Discharge Piping & Backpressure: govern freeze protection at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
116 — Mechanical Damage
Discharge Piping & Backpressure: govern mechanical damage at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
117 — Hose Compatibility
Discharge Piping & Backpressure: govern hose compatibility at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
118 — Visible Discharge Boundary
Discharge Piping & Backpressure: govern visible discharge boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
119 — Service Access
Discharge Piping & Backpressure: govern service access at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
120 — Post-Installation Test
Discharge Piping & Backpressure: govern post-installation test at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
121 — Continuous Air Leak
Air-Loss & Energy Engineering: govern continuous air leak at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
122 — Intermittent Blow Loss
Air-Loss & Energy Engineering: govern intermittent blow loss at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
123 — Timer-Loss Estimate Boundary
Air-Loss & Energy Engineering: govern timer-loss estimate boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
124 — Pressure Dependency
Air-Loss & Energy Engineering: govern pressure dependency at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
125 — Orifice Dependency
Air-Loss & Energy Engineering: govern orifice dependency at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
126 — Open-Time Dependency
Air-Loss & Energy Engineering: govern open-time dependency at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
127 — Cycle-Frequency Dependency
Air-Loss & Energy Engineering: govern cycle-frequency dependency at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
128 — Number Of Drains
Air-Loss & Energy Engineering: govern number of drains at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
129 — Annual-Hours Boundary
Air-Loss & Energy Engineering: govern annual-hours boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
130 — Compressor Specific-Power Boundary
Air-Loss & Energy Engineering: govern compressor specific-power boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
131 — Leak-Equivalent Thinking
Air-Loss & Energy Engineering: govern leak-equivalent thinking at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
132 — Measurement Method
Air-Loss & Energy Engineering: govern measurement method at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
133 — Ultrasonic Boundary
Air-Loss & Energy Engineering: govern ultrasonic boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
134 — Flow-Test Boundary
Air-Loss & Energy Engineering: govern flow-test boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
135 — M&V Verification
Air-Loss & Energy Engineering: govern M&V verification at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
136 — Oil-Contaminated Condensate
Condensate Treatment & Environmental Boundary: govern oil-contaminated condensate at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
137 — Oil-Water Separator Interface
Condensate Treatment & Environmental Boundary: govern oil-water separator interface at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
138 — Discharge-Quality Boundary
Condensate Treatment & Environmental Boundary: govern discharge-quality boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
139 — Local Regulation Boundary
Condensate Treatment & Environmental Boundary: govern local regulation boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
140 — Collection Tank
Condensate Treatment & Environmental Boundary: govern collection tank at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
141 — Hazardous Contamination Boundary
Condensate Treatment & Environmental Boundary: govern hazardous contamination boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
142 — Chemical Contamination Boundary
Condensate Treatment & Environmental Boundary: govern chemical contamination boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
143 — Spill Risk
Condensate Treatment & Environmental Boundary: govern spill risk at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
144 — Overflow Alarm Boundary
Condensate Treatment & Environmental Boundary: govern overflow alarm boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
145 — Waste Contractor Boundary
Condensate Treatment & Environmental Boundary: govern waste contractor boundary at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
146 — Documentation
Condensate Treatment & Environmental Boundary: govern documentation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
147 — Maintenance Waste
Condensate Treatment & Environmental Boundary: govern maintenance waste at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
148 — Discharge Authorisation
Condensate Treatment & Environmental Boundary: govern discharge authorisation at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.
149 — Environmental Review
Condensate Treatment & Environmental Boundary: govern environmental review at the exact condensate collection point. Record upstream equipment, drain type, operating pressure, condensate load, contamination context, discharge route, air-loss behaviour, backpressure, ambient condition, test method, baseline and evidence confidence. Diagnose both failure directions: inability to remove liquid and unintended loss of compressed air.