1. Purpose and Engineering Decision
Adsorption dryers can consume compressed air during regeneration, electrical power for heaters and blowers, or a combination of both. The energy and capacity consequence depends on the dryer technology, cycle sequence, operating pressure, inlet conditions, dew-point duty and the exact way the supplier states purge consumption.
The worksheet also shows the effect of purge on net useful dry-air delivery.
Dryer / regeneration mode | |
|---|---|
Heatless / pressure-swing purge | Model compressed-air purge by active regeneration state and duty fraction |
Heated purge | Model compressed-air purge plus heater electrical energy |
Blower purge / externally heated | Model blower and heater energy; add compressed-air purge only if documented |
Zero-purge / heat-of-compression style | Do not invent purge; record auxiliary energy and verified vent/loss terms only |
Demand-controlled purge | Use measured or controller-derived active regeneration time rather than fixed-cycle assumption where available |
2. Purge Basis Must Be Explicit
A purge figure is incomplete unless its basis is known. It may be stated as a percentage of dryer rated inlet flow, a fixed reference flow, an actual volumetric flow at regeneration pressure, or a time-averaged value over a complete cycle.
Supplier / field statement | Required interpretation |
|---|---|
Purge = X% of rated flow | Record exact rated-flow basis and reference conditions before multiplying |
Purge = fixed m3/min FAD | Use the stated reference basis directly |
Purge = actual m3/min at regeneration pressure | Convert to the selected reference basis before comparing with compressor capacity |
Average purge over cycle | Do not multiply again by regeneration duty fraction |
Instantaneous purge while valve open | Multiply by verified active purge time / cycle fraction |
3. Reference-Flow Purge from a Documented Percentage
Q_purge,ref = Q_basis,ref x f_purge
This equation is valid only when the supplier explicitly defines purge fraction f_purge against the same Q_basis,ref.
4. Convert Actual Regeneration Flow to Reference Flow
When purge is measured or stated as actual volumetric flow at a regeneration pressure and temperature, it must be converted to the common reference condition before capacity or energy comparison.
Q_ref = Q_actual x (P_actual,dry / P_ref,dry) x (T_ref / T_actual) x (Z_ref / Z_actual)
Gauge pressures are converted to absolute before use.
5. Regeneration Duty Fraction
f_active = Purge-Active Time / Total Cycle Time
Q_purge,avg,ref = Q_purge,instant,ref x f_active
Do not apply the duty fraction when the supplier has already provided a cycle-average purge value.
6. Purge Volume and Energy Worksheet - Required Asset
Field | Entry / formula | Evidence required |
|---|---|---|
Dryer manufacturer / model | User input | Exact model identification |
Regeneration mode | Heatless / heated / blower / other | Manual / datasheet |
Process inlet flow basis | Reference flow | |
Supplier purge statement | % / fixed ref flow / actual flow / average | Source text / table |
Purge basis flow | Q_basis | Rated or actual duty basis |
Purge active flow | Calculated / entered | With units and basis |
Cycle / regeneration time | Minutes or seconds | Controller / manual / measured |
Active fraction | Calculated | Do not use if purge already averaged |
Average purge flow | Calculated | Reference flow basis |
Annual operating hours | User input | Scenario |
Annual purge volume | Calculated | Reference-volume total |
Specific power | kW per reference flow | |
Purge compression-energy equivalent | Calculated | Screening, not guaranteed incremental kWh |
Heater kW / active hours | Entered | If applicable |
Blower kW / active hours | Entered | If applicable |
Total regeneration energy | Calculated | Compressed-air equivalent + electrical auxiliaries |
7. Annual Purge Volume
Annual Purge Volume_ref = Q_purge,avg,ref x Operating Hours x 60
If Q is entered in m3/min, multiplying by hours and 60 gives m3 of reference air per year. For a shift or project study, replace annual hours with the relevant operating period.
8. Net Useful Dry-Air Delivery
Q_net,dry = Q_inlet,ref - Q_purge,avg,ref - Other Verified Dryer Losses
Purge Fraction of Inlet (%) = Q_purge,avg,ref / Q_inlet,ref x 100
It must not assume valve leakage, depressurization losses or cooling purge unless they are documented or measured.
9. Compressed-Air Energy Equivalent
P_purge,equiv (kW) = Q_purge,avg,ref x Specific Power
E_purge,equiv (kWh) = P_purge,equiv x Operating Hours
This is an energy-equivalent screening calculation using the stated compressor or fleet specific power. It is not automatically equal to the plant's incremental electrical saving if purge is eliminated, because compressor controls, unload time and fleet dispatch may change.
10. Heater and Blower Electrical Energy
E_heater = P_heater x Heater Active Hours
E_blower = P_blower x Blower Active Hours
E_regeneration,total = E_purge,equiv + E_heater + E_blower + Other Verified Auxiliary Energy
The worksheet keeps compressed-air energy equivalent and directly metered auxiliary electricity visible as separate rows before presenting a combined project-energy view.
11. Reference Test Case A - Heatless Dryer with Documented Purge Fraction
Synthetic validation case: a dryer data sheet states purge at 15% of a 20.0 m3/min reference-flow basis and identifies that number as cycle-average purge. The dryer operates 6,000 h/y. Use 6.0 kW per m3/min as the matched fleet specific-power input.
Calculated item | Result |
|---|---|
Average purge flow | 3.00 m3/min reference air |
Annual purge volume | 1,080,000 m3/y reference air |
Energy-equivalent purge power | 18.0 kW |
Energy-equivalent annual use | 108,000 kWh/y |
Because the supplier statement is already cycle-average, no additional purge duty factor is applied.
12. Reference Test Case B - Instantaneous Purge with Active Fraction
Synthetic validation case: instantaneous purge is 4.0 m3/min on the selected reference basis. Purge is active for 2 minutes in each 10-minute cycle.
Average Purge = 4.0 x (2 / 10) = 0.80 m3/min
If a developer incorrectly treats 4.0 m3/min as a cycle-average value, annual purge is overstated by a factor of five.
13. Reference Test Case C - Actual Purge Flow at Regeneration Pressure
Synthetic validation case: measured purge is 0.50 m3/min actual at 2.0 bar(g), 30 C. Atmospheric/reference pressure is 1.01325 bar(a), reference temperature 20 C, Z = 1, humidity correction omitted.
Q_ref = 0.50 x (3.01325/1.01325) x (293.15/303.15) = 1.438 m3/min
The example shows why an actual regeneration-line flow cannot be compared directly with FAD or another reference-flow number.
14. Reference Test Case D - Heated / Blower Regeneration Energy
Synthetic validation case: average compressed-air purge is 0.60 m3/min for 5,000 h/y at 6.0 kW/(m3/min). A 12 kW heater runs 1,500 h/y and a 4 kW blower runs 2,000 h/y.
Energy component | Annual energy |
|---|---|
Purge compression equivalent | 18,000 kWh/y |
Heater | 18,000 kWh/y |
Blower | 8,000 kWh/y |
Total modeled regeneration energy | 44,000 kWh/y |
15. Depressurization and Repressurization Losses
Some adsorption-dryer cycles vent vessel pressure during switching and consume air during repressurization.
The tool must not roll an assumed switching loss into purge percentage without evidence.
16. Dew-Point Demand and Purge Control
Demand-controlled regeneration may reduce purge or heater/blower runtime when the desiccant bed does not require a full fixed cycle.
Control basis | Preferred input |
|---|---|
Fixed time cycle | Verified cycle timing |
Dew-point demand control | Controller regeneration-active hours / totalized purge |
Measured audit | Flow meter + valve state / controller state |
Estimated comparison | Explicit assumed reduction; label preliminary |
17. Purge Cost
Purge Energy Cost = E_purge,equiv x Electricity Tariff
Auxiliary Electrical Cost = (E_heater + E_blower + other kWh) x Tariff
A flat tariff can be used for screening. Demand charges, time-of-use tariffs and compressor-control interactions belong in the broader lifecycle model when material.
18. Capacity Check
Dryer Inlet Requirement = Useful Dry-Air Demand + Average Purge + Other Verified Internal Losses
For some designs the upstream compressor must supply useful plant demand and regeneration consumption simultaneously.
19. Confidence Model
Input source | Suggested confidence |
|---|---|
Measured purge flow + verified valve/controller state | High |
Manufacturer model-specific purge table at matched conditions | High |
Controller totalized purge / regeneration hours | Medium-High |
Model-specific stated purge fraction with clear basis | Medium-High |
Generic purge percentage copied from another dryer family | Not acceptable for final selection |
Assumed duty fraction without cycle evidence | Preliminary |
20. Validation and Guardrails
Condition | Required behaviour |
|---|---|
Purge flow < 0 | Block calculation |
Purge fraction < 0 or > 1 | Block calculation |
Cycle-average purge selected and active fraction also entered | Warn / prevent double application |
Instantaneous purge selected without active time | Block average-purge result |
Actual flow entered without pressure/temperature basis | |
Gauge pressure used as absolute in conversion | |
Specific power basis unmatched to purge reference flow | Require normalization |
Heater/blower active hours > dryer operating hours without documented overlap logic | Warn |
Generic purge factor with no model source | Mark unsupported / do not pass final selection |
21. Output Specification
Output | Display rule |
|---|---|
Instantaneous purge flow | With basis and units |
Cycle-average purge flow | Reference-flow basis |
Purge fraction of inlet | % |
Annual / project purge volume | Reference m3 or selected unit |
Net useful dry-air delivery | Flow |
Gross inlet requirement | Flow |
Purge compression-energy equivalent | kW and kWh |
Heater / blower energy | Separate kWh |
Total modeled regeneration energy | kWh |
Annual cost | Currency |
Confidence / warnings | Always visible |
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. Prices, tariffs and efficiencies shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by an engineer against the machine data sheet and the site.
Adsorption dryer purge air
A desiccant dryer uses some of the dried air to regenerate. Put a cost on that purge.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Dryer flow (m³/min): 12
- Purge fraction (%): 15
- Specific power (kW per m³/min): 7
- Running hours per year: 6000
- Electricity tariff (₹/kWh) — enter your own: 8
Result
- Purge air: 1.8 m³/min
- Compressor power for purge: 12.6 kW
- Purge cost per year: ₹ 6,04,800
Method. Purge flow = dryer flow × purge fraction. Energy = purge flow × specific power × hours × tariff. Heatless dryers are commonly in the range of 15–20% purge; heated and blower-purge types use less. Use the datasheet value for the dryer in question.
What to take from it. Purge air is generated by the compressor and paid for like any other air. Use the dryer’s measured purge rather than the nameplate where you can.