Interactive resource
Use the working tool for this page
This page has a matching worksheet, calculator or comparison resource. It runs in your browser: enter your own measured values and keep the evidence behind every result.
Open resourceCompressed Air Unitsand Symbol Dictionary
Keep the quantity, unit, reference state and measurement boundary together—before comparing a rating, importing a log or trusting a calculation.
1. Engineering answer: a unit does not explain the whole measurement
A compressed-air units and symbol dictionary defines what a quantity means, how it is written, which unit represents it and what context must travel with its value. It prevents unlike quantities from being compared merely because the digits, abbreviations or unit labels look similar. The essential record is not “500 CFM” or “7 bar” alone: it is the quantity, unit, reference basis, physical point, operating state and source that make the number interpretable.
A flow meter, a supplier rating and an actual pipe-flow calculation can use similar unit labels without sharing the same meaning.
Its entries explain pressure, airflow, temperature, moisture, power, energy, performance, geometry and evidence terms. Exact unit changes are separated from reference-state changes and from equipment-performance corrections. Where a source leaves a basis unresolved, the dictionary preserves that uncertainty instead of inventing the missing condition.
2. How this dictionary fits the engineering-tool sequence
The present page includes enough equations and examples to show why the terminology matters, but it is not a replacement for those specialist resources. The fixed page ID and next-page sequence are preserved.
Use the dictionary at the moment a value enters a workflow. Before comparing two offers, identify each flow basis. Before importing a logger file, identify pressure reference and timestamp convention. Before calculating specific energy, identify both the electrical and delivered-air boundaries. Before interpreting an oil result, preserve the contaminant fraction and reporting qualifier. A correct calculation cannot repair a quantity that was misidentified at import.
Symbols in this issue are project notation, not an assertion that every manufacturer uses identical lettering. Original symbols remain in the source record. The companion JSON dictionary supplies stable field identities so a developer can map different source labels without depending on typography. Its release is a new authored reference, not a claim that every historic RC page has already been migrated to it.
3. Separate quantity, symbol, unit and basis
A quantity is the physical or reporting property being described: pressure, volume flow, electrical input or elapsed time. Its symbol is a compact name within an equation. A unit is the scale used to express its value. A basis identifies such matters as gauge versus absolute pressure, actual versus reference flow, or electrical versus thermal energy. The physical boundary and operating state supply further meaning. These layers must remain distinguishable in both prose and software. [S1, S2; R3, R4]
Write the preferred quantity label as p_g = 7 bar, or “gauge pressure: 7 bar.” Familiar source labels such as bar(g), barg, bar(a), psig and psia may be retained for recognition, but the stored unit should remain bar or psi while pressure_reference carries the qualification. Likewise, store m³/h with a separate reference-state object instead of relying on the letter N in Nm³/h to carry all thermodynamic assumptions. This follows the principle that information about the quantity belongs with the quantity, not hidden inside a modified unit. [R3, R4]
Use a space between a numerical value and its unit: 25 °C, 75 kW and 8 bar. Unit symbols are case-sensitive; kW is not KW, mW is not MW, and Pa is not pA. Exponents apply to the whole prefixed unit: 1 mm² = 10⁻⁶ m² and 1 mm³ = 10⁻⁹ m³. A software import may recognise controlled aliases, but it must retain the original text and disclose the mapping. Do not solve ambiguity by indiscriminately lowercasing every symbol. [R1, R3]
4. Pressure dictionary: identify the zero and the two points
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Absolute pressurep_abs | Pa; kPa; bar | Pressure referred to an absolute vacuum. Gas-state pressure ratios use this basis, not a gauge reading. Record the point, unit, instrument reference and timestamp. |
Gauge pressurep_g | Pa; kPa; bar | Pressure relative to the stated atmospheric reference. A negative gauge value may represent vacuum service. Keep the atmospheric basis; zero gauge does not mean zero absolute pressure. |
Atmospheric pressurep_atm | Pa; kPa; bar | Ambient absolute pressure applicable to a location and time. It is an input when converting a local gauge reading. Do not substitute standard atmosphere for a measured local value without a labelled assumption. |
Differential pressureΔp | Pa; kPa; bar | The signed difference p_up − p_down for identified simultaneous or defensibly paired observations. Record both points and the sign convention; do not add atmospheric pressure to a pressure difference. |
Compression pressure ratior_p | 1 | Discharge absolute pressure divided by inlet absolute pressure at the defined stage or package boundary. Stage ratio and overall ratio are different quantities; use compatible operating states. |
Working pressurep_work | bar; kPa | The pressure associated with the stated operating duty, not automatically a maximum design or permissible value. Identify location, pressure reference and the concurrent flow or operating condition. |
Permissible pressure limitp_limit | bar; kPa | An equipment- or project-defined limit with a source and applicable conditions. A dictionary cannot infer this limit from a normal setpoint, a nameplate power or a successful start. |
Pressure setpointp_set | bar; kPa | A configured target or switching threshold in a named controller. It is a setting, not a measured delivered pressure. Retain controller identity, mode, effective revision and authorised source. |
Pressure deadbandΔp_band | bar; kPa | The separation between named control thresholds under the stated control logic. Do not confuse the band width with the absolute value of either threshold or a pipe loss. |
Vacuum depth / depressionp_vac | kPa; bar | A positive magnitude below the stated atmospheric reference when that convention is used. Specify whether the source reports depression, negative gauge pressure or absolute pressure. |
5. Pressure conversion reference: exact definitions versus displayed rounding
Pure conversion changes a scale, not a pressure reference. A gauge reading of 100 psi can be expressed as approximately 689.476 kPa gauge without knowing atmospheric pressure. Converting that reading to absolute pressure requires the additional reference. The factors below preserve this distinction. Decimal values marked approximate are display values; their trailing digits are not an assertion of instrument accuracy. [R1]
Source unit | Equivalent | Important qualification |
|---|---|---|
1 Pa | 1 N/m² | Exact derived-unit relation. |
1 kPa | 1,000 Pa | Exact prefix relation. |
1 MPa | 1,000,000 Pa = 10 bar | Exact prefix and bar relations. |
1 bar | 100,000 Pa = 100 kPa | Exact; not identical to one atmosphere. |
1 mbar | 100 Pa | Exact; do not read mbar as MPa. |
1 standard atmosphere | 101,325 Pa = 1.01325 bar | Exact definition of atm; not the local atmosphere. |
1 kgf/cm² | 98,066.5 Pa = 0.980665 bar | Exact under standard gravity; kgf is force, not kg mass. |
1 psi | ≈ 6,894.757293 Pa | Pound-force per square inch; displayed decimal rounded. |
1 bar | ≈ 14.503773773 psi | Reciprocal conversion, rounded. |
1 Torr | 101,325/760 Pa ≈ 133.322368 Pa | Torr definition; do not silently substitute a liquid-column convention. |
The exact-definition expression used for psi in the companion registry is (0.45359237 × 9.80665)/(0.0254²) Pa. It uses the international inch and avoirdupois pound with standard gravity. A source labelled only “kg pressure,” “inches vacuum” or “water column” remains incomplete: identify force versus mass, gauge versus absolute, fluid and any temperature-dependent or conventional definition before applying a factor.
6. Pressure and vacuum relationships without hidden assumptions
For a gauge measurement referenced to the stated atmosphere, p_abs = p_g + p_atm. For a positive vacuum depression, p_abs = p_atm − p_vac. Each term must use the same pressure unit. A stated standard atmosphere is a reference condition, not a universal replacement for site barometric pressure. A sealed-gauge sensor or a device using another reference needs its own documented relationship. [S1; R5]
For two compatible points sharing the same atmospheric reference, subtracting gauge readings gives the same pressure difference as subtracting their absolute values. Adding an atmosphere to that difference is an error. Conversely, a compression ratio requires the absolute pressures individually. These two operations look similar on a spreadsheet but answer different questions; quantity_kind must determine which operation is allowed.
Vacuum percentages need a definition. A proposed local reporting convention may express depression as 100 × (p_atm − p_abs)/p_atm, but that formula is not assumed for every supplier display. Record its reference before comparing sites. A value below zero absolute pressure is invalid for the present gas-state calculations; a negative gauge pressure is not invalid merely because it has a minus sign. Keep these validity rules separate from equipment safety limits.
7. Airflow and capacity dictionary: retain the reporting state
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Volume flow rateQ_v | m³/s; m³/min | Volume crossing a defined boundary per unit time at the stated gas or reporting condition. The unit alone does not specify actual, inlet, reference, dry or humid air. |
Actual volume flowQ_actual | m³/s; ft³/min | Volume flow at the actual pressure, temperature and composition of the named point. Identify whether that point is the compressor inlet, a pipe, an instrument cell or another location. |
Free air deliveryQ_FAD | m³/min; ft³/min | Delivered compressor capacity expressed at defined inlet/reference conditions under the applicable reporting method. Preserve machine, operating pressure, reference state and method; FAD is not a standalone unit. |
Cubic feet per minutecfm | ft³/min | A volume-flow unit. It changes to metric by a geometric factor only when the underlying quantity stays unchanged. An unqualified CFM label cannot establish equivalence with a FAD or standard-flow figure. |
Actual cubic feet per minuteacfm | ft³/min + state | A label for actual volume flow at the stated location; compressor literature often refers it to inlet conditions. Do not automatically interpret it as discharge-pipe volume or assume a universal location. |
Standard cubic feet per minutescfm | ft³/min + reference | Volume flow referred to a stated standard condition. Its numerical meaning depends on the source definition. Require absolute reference pressure, temperature, humidity/composition and applicable method. |
Normal volume flowQ_N | m³/h + reference | Volume flow expressed at a named normal reference state. Nm³/h is retained as a recognised source label. Do not infer the temperature, pressure or moisture basis from N alone. |
Standard metric volume flowQ_std | m³/h + reference | A reporting quantity sometimes labelled Sm³/h or standard L/min. Attach the explicit reference-state record; it is not automatically equal to normal volume flow. |
Inlet volume flowQ_in | m³/min; ft³/min | Flow at the defined compressor inlet location and condition. Distinguish upstream ambient, filter entry and compression inlet; inlet losses can change the applicable state. |
Geometric displacementQ_disp | m³/min | Swept or theoretical volume rate associated with machine geometry and speed. It is not measured delivered capacity; retain the supplier definition and operating-speed basis. |
Net delivered flowQ_net | m³/min + basis | Air available across a defined downstream boundary after explicitly accounted uses or losses. Purge, drains, leakage, exports and storage can separate it from compressor-package delivery. |
Mass flow rateṁ | kg/s; kg/h | Mass crossing the named boundary per unit time. Unlike actual volume, it is not scaled solely by gas pressure. State dry-air mass, moist-air total or specified gas composition before converting through density. |
The CAGI glossary provides its own stated standard-cfm condition and explains inlet-related capacity terminology. That is useful source-specific context, not permission to assign the same reference to every scfm entry. This also resolves the apparent conflict between “actual” in a compressor rating and “actual” in a pipe-flow model. [R5]
8. Volume, flow and time conversion reference
The international foot is exactly 0.3048 m, giving 1 ft³ = 0.028316846592 m³. The same factor applies to ft³/min and m³/min without altering the reference state. A litre is 0.001 m³, and minute-to-hour changes use 60 minutes per hour. These are unit operations, not compressor-efficiency corrections. [R1]
Starting quantity | Converted expression | Scope |
|---|---|---|
1 m³ | 1,000 L | Exact. |
1 ft³ | 0.028316846592 m³ | Exact from the international foot. |
1 ft³/min | 0.028316846592 m³/min | Same volume and reporting basis. |
1 m³/min | ≈ 35.3146667215 ft³/min | Rounded reciprocal. |
1 m³/min | 60 m³/h = 1,000 L/min | Exact. |
1 L/s | 0.06 m³/min = 3.6 m³/h | Exact. |
1 L/min | 0.001 m³/min = 0.06 m³/h | Exact. |
1 m³/h | 1,000/3,600 L/s | Exact expression; ≈ 0.277777778 L/s. |
1 US liquid gallon | 0.003785411784 m³ | Exact; not an Imperial gallon. |
1 Imperial gallon | 0.00454609 m³ | Exact; do not resolve an unqualified gal automatically. |
Runtime multiplied by an appropriate interval-average flow gives volume. A logged totaliser already represents accumulated volume; multiplying it by time again is a dimensional error. For samples, exclude preparation and unmeasured pauses according to the collection record rather than assuming all elapsed time is accepted collection time. The dictionary should identify whether a field is instantaneous, an interval average or a cumulative counter before any integration is attempted.
9. Reference-state conversion is a different operation
For the same single-phase gas composition and mass flow, the state relationship is Q₂ = Q₁ × (p₁/p₂) × (T₂/T₁) × (Z₂/Z₁). Pressure is absolute, temperature is in kelvin and Z is the compressibility factor at the respective state. This relationship follows mass conservation and pV = ZnRT; it changes reporting state, not compressor operating capability. [S1; newly developed notation]
The calculation requires a declared scope. A dry-gas reference comparison is not interchangeable with moist-air total volume when moisture condenses or the composition changes. In a specifically defined ideal dry-air accounting model, dry partial pressure is total absolute pressure minus water-vapour partial pressure. That is a conditional model requiring humidity evidence, not a correction to apply to every flow reading. Missing humidity does not mean zero humidity.
Do not apply state conversion twice when a meter has already normalised its output. Keep raw_state, reported_state and target_state separately. Before an output can be used, the developer should establish which state the value currently occupies. Changing the reporting reference from 0 °C to 20 °C does not demonstrate that the compressor delivers more mass, can operate at higher discharge pressure or has gained capacity.
A complete reference-state record identifies absolute pressure, absolute temperature, moisture/composition basis, compressibility treatment, governing method and source revision. The well-known phrase “standard conditions” is insufficient by itself. The dictionary deliberately provides no auto-filled universal normal or standard state. That requirement prevents a familiar abbreviation from becoming an undocumented engineering assumption.
10. Mass, gas properties and dimensions dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Massm | kg | Amount of matter represented by the mass quantity, distinct from weight or force. A kilogram must not be treated as a pressure unit; preserve gas or liquid identity. |
Densityρ | kg/m³ | Mass per unit volume at a defined state. It connects mass flow to actual volume flow through ṁ = ρQ_v. Record pressure, temperature, composition and property source; reference density belongs to a reference state. |
Amount of substancen | mol | A quantity used with molar gas relationships and molar composition. Do not interchange mol with kg without molar mass and the corresponding gas identity. |
Molar massM | kg/mol | Mass per amount of substance for the specified material or mixture. A ppm-to-mass calculation needs the relevant species, not an assumed generic oil molecule. |
Molar gas constantR | J/(mol·K) | The constant appearing in pV = ZnRT when n is in moles. Use matching molar units; distinguish it from a mass-specific gas constant. |
Specific gas constantR_s | J/(kg·K) | The gas constant on a mass basis, equal to R/M for the stated composition. Do not combine kg-based flow with a molar gas constant without converting the model. |
Compressibility factorZ | 1 | Factor accounting for departure from the ideal-gas state equation. Use a property model applicable to the gas and state; Z = 1 is an assumption, not universal data. |
Specific heat capacityc_p | J/(kg·K) | Heat-capacity quantity at constant pressure for the named material and temperature range. kJ and J differ by 1,000; retain phase, mixture and property-source basis. |
A dimensional check is necessary but not sufficient. Torque and energy can both be expressed using N·m, yet they are different quantities and must not be interchangeable fields. Likewise, electrical energy and thermal energy may both use kWh while measuring different boundaries. The dictionary therefore carries quantity_kind as well as unit; software that validates only dimensions can still accept a physically inappropriate substitution.
11. Temperature and moisture dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Thermodynamic temperatureT | K | Absolute-scale temperature used in gas-state ratios and thermodynamic equations. Kelvin uses K, not °K. Valid gas-state inputs must be above zero kelvin. |
Celsius temperaturet_C | °C | Temperature on a scale offset from kelvin: T/K = t_C/°C + 273.15. The offset applies to a temperature value, not to a temperature difference. |
Fahrenheit temperaturet_F | °F | Temperature value converted by t_C = (t_F − 32)/1.8 when both symbols denote numerical readings. Preserve whether a source means a reading or an interval. |
Temperature differenceΔT | K; °C interval | Difference between named temperatures; one kelvin interval equals one Celsius-degree interval. For a Fahrenheit interval divide by 1.8; do not subtract 32 or add 273.15. |
Cooler approachΔT_app | K | A specifically named difference, commonly hot-stream outlet minus cooling-medium inlet. Retain the two measurement points, flow/load state and source convention; there is no universal limit here. |
Pressure dew pointt_dp,p | °C + pressure | Dew-point temperature associated with air at the stated pressure. Store sample pressure and method; it does not by itself establish oil, particle or liquid-water compliance. |
Atmospheric dew pointt_dp,atm | °C + pressure | Dew point associated with the declared atmospheric-pressure sampling state. Do not compare directly with line-pressure dew point without the appropriate moisture model. |
Relative humidityφ | %; fraction | Water-vapour state expressed relative to the relevant saturation condition at the stated temperature. Retain pressure and definition; 50% is entered as 0.50 in a fraction field, not 50. |
Humidity ratiow | kg/kg dry air | Water-vapour mass divided by dry-air mass for the specified mixture. It is not relative humidity; retain the dry-air denominator and moisture model. |
Water-vapour partial pressurep_v | Pa; kPa | The vapour pressure term used in a declared moist-air model. Do not substitute total line pressure or infer this value from an unspecified “wet” observation. |
A negative Celsius dew point is physically meaningful and must not be rejected by a generic “no negative temperatures” rule. Conversely, −300 °C is outside the thermodynamic domain of these gas calculations. A zero temperature difference can be a valid observation. Applying one sign rule to all temperature-related fields would destroy valid data and accept some invalid models. [R2; proposed software interpretation]
12. Power, energy and electrical dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Active electrical powerP_el | W; kW | Rate of electrical energy transfer at the named measurement boundary. Use measured or supported package input; a motor shaft rating is not the same field. |
Shaft powerP_shaft | W; kW | Mechanical power delivered at the defined shaft boundary. Motor and drive losses separate it from electrical input; retain the equipment and test basis. |
Thermal power / heat-transfer rateQ̇_heat | W; kW | Rate of heat transfer across a defined thermal boundary. Use a distinct key from volume flow Q_v and electrical power P_el. |
Electrical energyE_el | J; kWh | Electrical power integrated over time at the stated boundary. 1 kWh = 3.6 MJ; kW alone is not an energy quantity. |
Thermal energyE_heat | J; kWh | Heat-transfer rate integrated over time. The shared unit kWh does not make it electrical consumption or a verified electricity saving. |
Apparent powerS_el | VA; kVA | Electrical apparent-power quantity for the stated circuit and measurement convention. Do not equate kVA with kW without the corresponding true power factor and compatible boundary. |
True power factorPF | 1 | Ratio of active to apparent power under the applicable measurement definition. A displacement factor alone may not represent total power factor with distorted waveforms. |
Electrical potential differenceU_el | V | Voltage between identified conductors or reference points. Retain line-to-line versus line-to-neutral, AC/DC and measurement method. |
Electric currentI | A | Current through the named conductor or circuit. Current alone does not establish compressor kW; voltage, phase system and waveform/method matter. |
Electrical frequencyf | Hz | Cycles per second of a periodic electrical quantity. Supply frequency and mechanical shaft speed are separate observations, particularly with variable-speed drives. |
Horsepower requires a named convention. Mechanical horsepower is approximately 0.745699872 kW; metric horsepower is 0.73549875 kW; the electric-horsepower convention is 0.746 kW. They are not interchangeable exact labels. Converting a 100 hp motor rating into kW still gives a rating on its declared basis, not measured package electrical input. Retain the original horsepower description rather than assigning an unexplained factor. [R1]
For a constant 75 kW electrical load operating for eight hours, electrical energy is 600 kWh. For changing loads, sum P_i × Δt_i with time in hours. The shortcut “kW per hour” describes a rate of change of power, not the ordinary unit for purchased electrical energy. Displaying the correct symbol is part of the engineering meaning, not merely editorial style.
13. Performance ratios, percentages and uncertainty dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Specific powerSP | kW/(m³/min) | Power divided by compatible delivered/reference volume flow at the named pressure and operating state. Preserve package/system boundaries; this unit differs numerically from kWh/m³. |
Specific energye | kWh/m³ | Integrated electrical energy divided by compatible delivered/reference volume over the same period. Attach the air-volume basis and electrical boundary; do not divide totals from different periods. |
Efficiencyη | 1; % | A defined useful-output to input ratio. Several compressor, motor and system definitions exist. Identify numerator, denominator and method; “efficiency” alone is not a complete field definition. |
Percentagex_% | % | One hundred times a declared ratio; percent means parts per hundred. Store the denominator and distinguish a fraction value of 0.95 from a displayed 95%. |
Percentage-point differenceΔpp | percentage points | Arithmetic difference between two percentages on comparable definitions. Changing from 90% to 95% is five percentage points, not a 5% relative increase. |
Standard uncertaintyu(x) | same as x | An uncertainty contribution represented on a standard-uncertainty basis. Do not substitute display resolution, a tolerance or a full-scale specification without an applicable model. |
Expanded uncertaintyU(x) | same as x | Combined standard uncertainty multiplied by a declared coverage factor. Record factor, method and coverage interpretation; an assumed factor does not guarantee a confidence claim. |
Coverage factork_cov | 1 | Multiplier used in a stated expanded-uncertainty calculation. Do not confuse it with the SI prefix k in kPa or kW. |
Permitted tolerancetol | same as quantity; % | An allowed deviation under the relevant specification or decision rule. It is not measurement uncertainty and must not be deducted twice. |
Result qualifierqualifier | text enum | A literal comparison or status associated with a result: <, ≤, >, quantified or not reported. Retain the threshold and method; <0.010 is not a measured zero. |
When SP is expressed in kW per m³/min, the corresponding steady-state specific energy in kWh/m³ is SP/60. For kW per 100 cfm, first convert 100 ft³/min to 2.8316846592 m³/min, then reconcile the power-to-flow ratio. A smaller specific-power number cannot be ranked as better until its denominator convention and measurement boundary are known. Dimensional equivalence does not remove differences in discharge pressure or operating duty.
14. Geometry, pneumatics and mechanical dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
LengthL_geom | m; mm | A physical distance such as a pipe run, hose length or cylinder stroke. Identify actual route and effective or measured definition; do not confuse L_geom with litre L. |
Internal diameterD_i | m; mm | Actual internal bore used in area, velocity or volume calculations. Nominal pipe size and outside diameter do not automatically equal internal diameter. |
External diameterD_o | m; mm | Outside diameter of the named tube, rod or component. Keep it separate from the open-flow bore and the nominal product designation. |
Cross-sectional areaA_cross | m²; mm² | Area normal to the named flow or force direction. For a circular bore A = πD²/4. Convert squared units correctly; doubling diameter multiplies area by four. |
Geometric volumeV_geom | m³; L | Physical enclosed volume such as a receiver or cylinder chamber. It is not the same as the quantity of free/reference air stored in that volume. |
Flow velocityv | m/s | Local volume flow divided by the local open flow area under the stated model. Use actual local volume per second, not FAD per minute without state and time conversion. |
ForceF | N; kN | Mechanical force. Ideal static pneumatic force may be represented by pressure difference times effective area. Friction, exhaust backpressure and dynamic loading require additional application-specific treatment. |
Torqueτ | N·m | Turning moment about an axis. It shares dimensions with work but is a different physical quantity. Do not label torque as joules or use an energy field as its substitute. |
Rotational speedn_rot | r/min | Mechanical revolutions per minute at the named shaft. Angular speed is ω = 2πn_rot/60 in rad/s; frequency labels need their shaft/electrical meaning. |
Kinematic viscosityν | m²/s; mm²/s | Dynamic viscosity divided by density for the named fluid and temperature. 1 cSt = 1 mm²/s. A viscosity value needs its temperature and fluid identity. |
The same quantity/unit discipline applies to drilling annuli and pneumatic actuators. An annular area needs both actual diameters and the direction of the subtraction. A double-acting cylinder has different effective areas on cap and rod sides. A nominal receiver volume cannot be converted directly into minutes of reserve without the permitted pressure window, gas state, demand and recharge assumptions. Those detailed designs remain on their respective engineering pages.
15. Air-quality units and analytical-result dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Mass concentrationc_mass | mg/m³; µg/m³ | Mass of a named contaminant per gas volume on the stated sample or reference basis. Specify contaminant/fraction, sampling point and volume state; a unit does not define a purity class. |
Number concentrationc_num | particles/m³ | Count in a named size band divided by accepted sample volume. Cumulative channels can overlap; the same particle must not be counted repeatedly in a sum. |
Particle sized_p | µm | Size quantity under the selected instrument or method definition. Record the size band and method; an optical response is not automatically a chemical identification. |
Mole fractionx | mol/mol | Amount of a named constituent divided by total amount of the mixture. State wet or dry basis and gas identity; ppmv usually indicates a gas-volume/mole-fraction convention. |
Mass fractionw_mass | kg/kg | Mass of constituent divided by total mixture mass. A ppm mass fraction is not the same quantity as ppm by volume or mg/m³. |
Parts per million by volumeppmv | 10⁻⁶ fraction | A commonly used gas-composition label requiring an explicit volume/mole-fraction definition. Do not convert to mass concentration without species and gas-state information. |
Total-oil reporting quantityc_oil,total | mg/m³ + method | An oil quantity assembled under the applicable method from the required non-overlapping fractions. An aerosol-only result or a missing vapour result cannot silently become a complete total. |
Accepted sample volumeV_sample | m³ + basis | Gas volume actually represented by the accepted collection interval and method. Exclude unmeasured or invalid periods explicitly; do not substitute plant production flow. |
Viable count concentrationc_CFU | CFU/m³ | Method-dependent recovered colony-forming units per accepted sample volume. Retain method and laboratory qualifiers; it is not a particle count or a sterility declaration. |
Reporting thresholdL_report | same as result | A method- or laboratory-defined threshold attached to a reported result. Preserve whether it is a detection, quantification or reporting limit; the names are not interchangeable. |
The fixed prefix change 1 mg/m³ = 1,000 µg/m³ is valid only with the same contaminant and gas-volume basis. Conversion from ppmv to mg/m³ is different: it involves composition and state, not just a thousandfold multiplier. Do not insert a standard molar volume without declaring its reference conditions. A dew-point temperature cannot be translated into an oil class, and a compressor technology label cannot substitute for a laboratory or point-of-use result.
16. Time, operating state and data-quality dictionary
Term and symbol | Unit / representation | Meaning and essential qualification |
|---|---|---|
Observation timestampt_stamp | date-time + offset | Time assigned to an observation or event, with timezone/offset and clock source. Preserve original and corrected times separately; a local clock string is not a duration. |
Elapsed durationΔt | s; min; h | Difference between declared start and end times under a stated interval convention. Account for date rollover and clock corrections; never subtract only displayed clock hours. |
Interval-average valuex̄_i | same as x | Average representing a specified interval rather than a single instantaneous observation. Record interval support and method before using it as an integration weight. |
Accumulated counterV_total; E_total | m³; kWh | A cumulative meter value requiring differencing over a defined period. Keep resets, rollover and replacement events; a counter reading is not a flow or power. |
RuntimeH_run | h | Time spent in a precisely defined running state. Motor energised, loaded, air-producing and available hours can differ; retain the state definition. |
Availability fractionA_v | 1; % | Share of a declared period in which the defined service can be provided under the chosen definition. Identify denominator and exclusions; planned downtime must not be deducted twice. |
Valid data coverageC_data | 1; % | Valid observation duration divided by the declared scheduled observation duration. High coverage does not prove that every critical event or required operating state was captured. |
Missing valuenull | null + reason | An absent numerical observation, not an observed zero. Keep not measured, not applicable, rejected and unavailable reasons distinguishable. |
Data quality statusq_status | text enum | A controlled label describing treatment of an observation for an intended use. Examples include accepted, suspect, corrected, estimated and excluded; define calculation behaviour. |
Dictionary versiondict_version | version string | Identity of the definitions and semantic rules used by a dataset or calculation. A meaning change requires impact review even when the numeric values remain unchanged. |
A zero flow may be valid during an unloaded or stopped state. It is nevertheless an invalid denominator for a specific-power ratio. These statements are compatible: preserve the observation, disable the affected division and explain why the derived value is unavailable. Do not reject the whole row or silently turn the ratio into zero. Similarly, a missing five-minute interval remains missing rather than being filled with the preceding value merely to make a graph continuous.
17. Symbol collisions: familiar letters require a quantity name
Single letters are compact within a well-defined equation but weak database keys. Use descriptive identifiers for storage and leave display symbols available for engineering readability.
Preferred distinct notation | Meanings | Import or calculation safeguard |
|---|---|---|
Q_v / Q̇_heat | Volume flow / heat-transfer rate | Different quantities despite a common Q shorthand. |
p_abs / P_el | Absolute pressure / active electrical power | Case alone is not a robust import rule. |
T / τ / t_stamp | Temperature / torque / timestamp | Store descriptive field IDs; do not infer meaning from a single T. |
A_cross / I | Area / electric current in amperes | A can be an area symbol or ampere unit. |
V_geom / U_el | Volume / electrical voltage | V can be a volume symbol or volt unit. |
u(x) / U(x) / U_el | Standard uncertainty / expanded uncertainty / voltage | Retain quantity kind, not only the letter. |
k_cov / k in kPa | Coverage factor / kilo prefix | One is a variable; the other multiplies a unit by 1,000. |
m / m as unit / ṁ | Mass / metre / mass flow | Symbols and unit strings need separate fields. |
η / PF / C_data | Efficiency / power factor / coverage | All dimensionless; their meanings and denominators differ. |
Δp / PDP | Pressure difference / pressure dew point | Similar abbreviations do not indicate compatible quantities. |
Search aliases can improve discovery without becoming conversion rules. Searching “barg” may find gauge pressure, and “CFM” may find the volume-flow entry. That lookup must not populate an unknown flow reference state or reinterpret a supplier guarantee. A successful search result is a definition suggestion, not proof that the source quantity has been identified.
18. Resolve ambiguous source labels without rewriting history
Preserve the original label, original value and original document revision. Add a proposed mapping, its evidence and a status such as confirmed, clarification required or not applicable.
Examples needing clarification include CFM without a basis; Nm³/h without reference conditions; kW without an input/output boundary; kg/cm² without an explicit force convention; ppm without a fraction basis; and a temperature rise stored with an absolute-temperature conversion. A supplier appendix, meter configuration or signed clarification may resolve the label. A plausible number, familiar brand or neighbouring column does not resolve it by itself.
When a source definition conflicts with the preferred dictionary convention, preserve both and map explicitly. Do not silently “correct” the source quotation. The quotation may be internally valid on its own basis while unsuitable for a direct comparison. A change affecting an issued result needs a correction record and a new derived issue; merely replacing the unit heading beneath unchanged values destroys traceability.
Where several values share one source, link them to the same evidence record. Repeated bookmark copies or multiple exports of one report are not independent corroboration. The companion dictionary separates general definitions from observation evidence so a reader cannot mistake a reference page for proof of a particular machine’s performance. No real supplier rating or customer measurement is introduced by the following examples.
19. Worked example 1: pressure, vacuum and ratio are different calculations
Fictional observations: a discharge gauge reads 7.00 bar, and the applicable measured atmospheric pressure is 0.95 bar absolute. The inlet is assumed, for this arithmetic example, to be at that atmospheric pressure. Discharge absolute pressure is 7.00 + 0.95 = 7.95 bar, and the pressure ratio is 7.95/0.95 = 8.368421. Dividing 7.00 by 0.95 would mix gauge and absolute quantities. It would give 7.368421, which is not the defined compression ratio.
At the same time, compatible upstream and downstream gauges read 7.00 and 6.72 bar. Their observed differential is 0.28 bar = 28 kPa. No atmospheric term is added to that difference. If the same atmosphere is added to both readings first, 7.95 − 7.67 still gives 0.28 bar. This demonstrates why reference conversion and subtraction must be distinct operations in the data model.
For a separate vacuum example under the same 0.95 bar atmosphere, a recorded depression of 0.70 bar corresponds to 0.25 bar absolute. Under the explicitly selected depression-per-atmosphere convention, the percentage is 100 × 0.70/0.95 = 73.684211%. These are synthetic demonstrations, not pressure settings, equipment limits or compressor performance predictions. A different sensor reference requires a different interpretation, not an automatic reuse of this example.
20. Worked example 2: flow units, reference state and line velocity
A fictional rating is 500 ft³/min on a declared dry reference basis of 1.00 bar absolute and 293.15 K. Pure unit conversion gives 500 × 0.028316846592 = 14.158423296 m³/min on the same reference basis. That number is not yet actual flow inside the discharge pipe.
For the same dry mass flow, an ideal-gas example with local line conditions of 8.00 bar absolute and 313.15 K gives Q_line = 14.158423296 × (1.00/8.00) × (313.15/293.15) = approximately 1.890547 m³/min. A real-gas model would additionally use Z_line/Z_ref. The example assumes single-phase dry gas and does not replace a supplier capacity correction or performance test.
For a circular pipe with an actual internal diameter of 50 mm, area is π × 0.050²/4 = 0.001963495 m². Actual volume flow is approximately 0.0315091 m³/s, so the illustrative local velocity is approximately 16.04746 m/s. Using the reference volume without state conversion would give approximately 120.18043 m/s for the same area. The discrepancy is a basis error, not evidence that the pipe or compressor has changed.
A second reference declaration at 273.15 K and the same absolute pressure would produce a different reference-volume number for the same mass flow. Comparing the two declarations therefore requires temperature reconciliation before any capacity comparison. The figure on a different reference basis must not be presented as extra delivered air. These calculations illustrate semantics and geometry; they do not select a permissible pipeline velocity.
21. Worked example 3: specific power and energy units
Fictional aligned measurements give electrical package input P_el = 120 kW and delivered reference airflow Q_ref = 20 m³/min. Specific power is 120/20 = 6.000 kW/(m³/min). During eight hours at these conditions, energy is 960 kWh and reference volume is 20 × 60 × 8 = 9,600 m³. Their ratio is 0.100 kWh/m³, the same result as 6/60.
The same ratio expressed in kW per 100 cfm is 6 × 2.8316846592 = 16.990107955 kW/(100 cfm). The larger displayed number does not describe worse performance; it uses a different volume-flow denominator. Conversely, comparing 16.99 kW/(100 cfm) directly with 6.00 kW/(m³/min) would create a false ranking.
Suppose the 20 m³/min is compressor delivery but only 18.5 m³/min crosses a downstream treatment boundary, while separate auxiliaries add 5 kW. The new ratio is 125/18.5 = 6.756756757 kW/(m³/min), or 0.112612613 kWh/m³. This is a changed system boundary, not a pure unit conversion. Both valid ratios may be retained, but each needs its own power and flow definitions. None of these synthetic figures is a customer saving or an equipment guarantee.
22. Worked example 4: temperature intervals and sample concentration
A fictional temperature reading of 104 °F converts to (104 − 32)/1.8 = 40 °C, or 313.15 K. A separate observed rise of 18 °F converts to 18/1.8 = 10 K. Applying the reading formula to the rise would produce −7.777778 °C, a category error. Adding 273.15 to that difference would be equally wrong. An importer must therefore know temperature_reading versus temperature_difference before choosing the transform.
For a separate sample-volume illustration, a verified flow of 2 L/min operates for 20 accepted collection minutes. V_sample = 2 × 20/1,000 = 0.040 m³ on the stated sample basis. Twelve accepted counts in a named, non-overlapping band give 12/0.040 = 300 particles/m³. A source reporting 25 elapsed minutes with a verified five-minute pause must not add the paused time to accepted collection volume.
An oil result of 0.010 mg/m³ would equal 10 µg/m³ on the same contaminant and volume basis. A report of <0.010 mg/m³ instead remains <10 µg/m³: the inequality is preserved. It must not become 0 µg/m³. This final example joins two otherwise different topics because both reveal the same design requirement: transformations must preserve quantity meaning and result qualifiers, not simply return a numeric value.
23. Editable definition and import-mapping record
Use this record when a quotation, logger export or earlier worksheet introduces an unfamiliar label. The blank fields are intended for manual completion. One row may describe one quantity definition shared by many observations, provided the effective period and source are controlled. Do not insert a universal reference state merely to complete an empty cell.
For an existing field named “pressure_bar,” a completed mapping may declare pressure_reference = gauge and point_id = HEADER_01. The dictionary version then defines how a derived absolute-pressure field is calculated. When the atmospheric input is missing, that derived field is held rather than substituting one atmosphere. The original gauge reading stays valid for uses that do not need absolute pressure.
For a field named “air_volume,” first determine whether it is a cumulative totaliser, interval volume or instantaneous flow mislabeled as volume. Those alternatives need different operations. A corrected name is useful only when accompanied by the verified meaning and an impact review of formulas that used the old field. This worksheet is a practical interface to source clarification, not a blanket approval of imported data.
24. Versioned machine-readable dictionary and quantity records
The companion package contains dictionary.json, unit_registry.json, reference_states.json, ambiguity_rules.json and worked_examples.json, together with an index, change history and structural-check report. The files are UTF-8 JSON. The dictionary entries are the same authored entries shown in the grouped tables above, not a second independently written glossary. No original supplier or customer file is embedded in the package.
Use stable semantic IDs such as pressure_absolute, flow_actual, energy_electrical and temperature_difference. A unit_registry entry supplies a scale conversion within a compatible quantity group. A reference-state object supplies state metadata. Neither a unit factor nor a search alias is permission to change the physical boundary. Defined-but-unpopulated fields are allowed to remain null with an explicit reason.
For a pressure observation, the recommended record includes observation_id, source_label, source_value, source_unit, quantity_id, unit_id, pressure_reference, point_id, observed_at, source_id, dictionary_version and quality_status. Flow observations additionally link flow_definition and reference_state_id. Where a flow is actual rather than reference, its state belongs to the actual measurement point.
Future revisions should distinguish editorial clarification from a material meaning or conversion change. A material change identifies affected calculators and issued datasets; it does not silently replace the historic dictionary beneath an unchanged result. This package does not claim to have converted all previous tools to the new field identities.
25. Expected-result tests and invalid-input behaviour
The cases below are acceptance references for implementing the dictionary and its conversions. Their arithmetic is checked during this document task. Structural checks of the delivered JSON are separate from testing a website importer or a deployed calculator. Exact factors and stored unrounded values govern calculations; display rounding must not alter equality, sign or a reporting qualifier.
Case | Input / condition | Expected result or required behaviour |
|---|---|---|
U01 | 1 bar → kPa | 100 kPa; preserve gauge/absolute/differential qualification. |
U02 | 7 bar gauge; atmosphere 0.95 bar | 7.95 bar absolute. |
U03 | 7.00 − 6.72 bar on the same reference | 0.28 bar difference = 28 kPa; no atmosphere added. |
U04 | 0.70 bar vacuum depth; atmosphere 0.95 bar | 0.25 bar absolute under the declared depression convention. |
U05 | Gauge → absolute; atmospheric reference missing | Derived value held; original gauge observation retained. |
U06 | 500 ft³/min → m³/min | 14.158423296 m³/min; original reporting basis unchanged. |
U07 | Normal or standard flow with unknown state | Pure unit scaling allowed with basis preserved as unresolved; state reconciliation held. |
U08 | 104 °F temperature value | 40 °C = 313.15 K. |
U09 | 18 °F temperature difference | 10 K; no additive temperature offset. |
U10 | −20 °C temperature value | 253.15 K; valid thermodynamic temperature input. |
U11 | −300 °C for gas-state model | Reject for that model: nonpositive absolute temperature. |
U12 | 1 mm² and 1 mm³ | 10⁻⁶ m² and 10⁻⁹ m³ respectively. |
U13 | 120 kW / 20 m³/min | 6 kW/(m³/min) = 0.1 kWh/m³. |
U14 | 120 kW for 8 hours | 960 kWh electrical at the declared boundary. |
U15 | Zero valid airflow with nonzero power | Keep observation; block P/Q rather than returning zero or infinity. |
U16 | 0.010 mg/m³ → µg/m³ | 10 µg/m³ on the same contaminant and volume basis. |
U17 | <0.010 mg/m³ → µg/m³ | <10 µg/m³; never a quantified zero. |
U18 | 2 L/min × 20 min; 12 accepted counts | 0.040 m³; 300 particles/m³ for the specified band. |
U19 | 90% → 95% on same denominator | +5 percentage points; +5.555556% relative to 90%. |
U20 | mW versus MW; unqualified hp or gal | Preserve case; require explicit convention for ambiguous hp or gal. |
Additional implementation checks should reject nonfinite numeric inputs, distinguish null from zero, retain unknown source units, preserve duplicate observations for review and test source-to-target-to-source round trips. A valid temperature interval of zero must remain valid. A negative gauge pressure must not fail an absolute-pressure sign check unless it has first been transformed into an invalid absolute value. Record the reason for every held result next to the affected field.
26. Engineering questions and direct answers
Is CFM the same as FAD?
No. CFM is a volume-flow unit. FAD is a defined way of expressing delivered compressor capacity. The quantity, reference state, operating pressure and reporting method must agree before values can be compared. A pure ft³/min-to-m³/min conversion does not establish those conditions.
What is the difference between bar gauge and bar absolute?
Gauge pressure is relative to the stated atmospheric reference; absolute pressure is relative to vacuum. Add the appropriate atmospheric pressure to convert the former to the latter. Do not add atmosphere to an already calculated differential.
Does Nm³/h always mean 0 °C?
Do not assume that from the label alone. Obtain the source’s exact reference temperature, absolute pressure, moisture basis and method. The dictionary stores these conditions explicitly rather than treating N as a universal complete definition.
Can I use FAD directly to calculate pipe velocity?
Not as actual line flow. First reconcile the gas state and composition to the pipe location, then express flow per second and divide by actual internal area. The resulting calculation still requires an appropriate flow model and actual geometry.
Why is kWh/m³ numerically different from kW per m³/min?
The time units differ. For compatible boundaries and the stated steady relationship, divide kW/(m³/min) by 60 to obtain kWh/m³. For a variable operating period, use total compatible energy divided by total compatible air volume.
Should 273.15 be added to a temperature rise?
No. The offset converts a Celsius reading to a kelvin reading. A Celsius-degree difference and a kelvin difference have the same size. Fahrenheit differences are divided by 1.8 without subtracting 32.
Can ppm be converted directly to mg/m³?
Not without knowing the fraction basis, species and relevant gas state. A mass fraction, mole fraction and mass-per-volume concentration are different quantities. A prefix-only unit converter cannot infer the missing physical inputs.
Does a 75 kW motor mean the compressor consumes 75 kW?
Not necessarily. Identify whether the figure is shaft rating, measured electrical input or another package quantity. Motor/drive losses and included auxiliaries affect the comparison. Changing units does not change that boundary.
Is a less-than laboratory result a zero?
No. Preserve the comparison sign and threshold. A result below a reporting threshold describes a qualified observation, not a quantified zero. Converted units must retain the qualifier and the method’s limits.
Does adopting the dictionary approve earlier calculations?
No. It provides controlled definitions and conversion references. Earlier records must be mapped and their affected outputs checked where meanings change. Calculator validation, equipment acceptance and operating approval remain separate activities.
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. Prices, tariffs and efficiencies shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by an engineer against the machine data sheet and the site.
Pressure unit and gauge/absolute conversion
Convert between bar, psi, kPa and MPa and between gauge and absolute pressure. A mix-up between gauge and absolute is a classic cause of wrong sizing.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Pressure: 7
- Unit: bar g
Result
- bar gauge: 7
- bar absolute: 8.01
- psi gauge: 101.5
- psi absolute: 116.2
- kPa gauge: 700
- MPa gauge: 0.7
Method. Absolute pressure = gauge pressure + atmospheric (1.01325 bar at sea level). 1 bar = 14.504 psi = 100 kPa = 0.1 MPa. Hyderabad is about 540 m above sea level; atmospheric pressure there is roughly 0.95 bar, so enter the local value in the flow tool if it matters.
What to take from it. A 7 bar gauge system is 8.01 bar absolute. Ratio and flow-conversion work uses absolute pressure.
Flow and reference-condition conversion
Convert a flow quoted at one set of conditions to another, and between units. Different suppliers quote at different reference conditions, so always compare like with like.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Flow as quoted: 10
- Unit: m³/min
- Quoted at pressure (bar a): 1.013
- Quoted at temperature (°C): 20
- Convert to pressure (bar a): 1.013
- Convert to temperature (°C): 0
Result
- Converted flow: 9.32 m³/min
- 155.3 L/s
- 559.1 m³/h
- 329.1 CFM
Method. Q₂ = Q₁ × (P₁ / P₂) × (T₂ / T₁), with absolute pressure and absolute temperature. Dry-air basis; humidity is ignored. Unit factors: 1 m³/min = 16.667 L/s = 60 m³/h = 35.31 CFM.
What to take from it. A flow quoted at 20 °C and the same air quoted at 0 °C differ by about 7%. Check the reference conditions before comparing two machines.