Reddy Compressors supplies, hires and services air compressors across Hyderabad from our base in Tarnaka, Secunderabad, where we have worked since 2002. Whether you run a factory that depends on plant air, a construction or drilling project that needs portable air for a few weeks, or a workshop with a piston compressor that needs a service, we handle compressors of all major brands from one team.
Who we work with in Hyderabad
- Factories and industrial estates: pharmaceutical, food and beverage, plastics, packaging, engineering and fabrication units that need reliable, clean plant air.
- Construction and infrastructure projects: breakers, rock drills, sandblasting and concrete work on building, road and metro sites.
- Borewell and drilling contractors: DTH and water-well drilling in and around the city.
- Workshops, garages and service centres: tyre, paint and tool air from reciprocating and small screw compressors.
- Hospitals, laboratories and commercial buildings where clean, dry air or standby air matters.
Compressor sales in Hyderabad
New rotary screw, reciprocating, oil-free and portable diesel compressors from all major brands, with the dryers, filters, receivers and piping that complete the system. Each machine is selected against your pressure, air demand and running hours, and the quotation explains why. Used and refurbished compressors are available as well.
Compressor rental in Hyderabad
Diesel and electric compressors on hire from 50 to 2,000 CFM and 2 to 30 bar, for a day, a month or a season. Typical hires cover plant shutdowns, compressor breakdowns, borewell and DTH drilling, sandblasting, construction sites and peak demand. Hoses, manifolds and moisture control are planned with the machine.
Compressor service and AMC in Hyderabad
Breakdown repair, scheduled servicing and annual maintenance contracts for compressors of all makes, plus overhauling, airend overhaul and compressed-air audits. Every visit ends with a written record of what was checked, measured and replaced.
Compressor spare parts in Hyderabad
Service kits, air filters, oil filters, separators, compressor oils, valves, sensors, coolers and engine parts for all major brands. Parts are identified from the machine's nameplate before we quote. A clear photo of the nameplate and the old part is usually enough to start: see find my part.
Why buyers in Hyderabad choose a multi-brand partner
Many sites run machines from more than one manufacturer, bought at different times. A single multi-brand team means one contact for sales, service and parts, one set of records, and an independent view when you compare options. Reddy Compressors is an independent specialist, not an authorised distributor of any brand unless stated for a specific product, so our recommendation is driven by your duty and budget.
Before you call
To help us respond quickly, have these ready: the application, the pressure you need, the approximate air demand or the tools in use, the running hours, and the site location. For service and parts, a photo of the compressor nameplate saves a lot of time.
Questions from customers in Hyderabad
Do you deliver rental compressors to sites in Hyderabad?
Yes. Rental machines are delivered, started up and collected by us, with hoses and moisture control as agreed in the rental proposal. Transport is planned with you, including site access and unloading.
How short can a rental be?
Short hires are possible. The minimum period and rate depend on the machine size and the distance to site, and are stated in the rental proposal.
Which compressor brands do you service in Hyderabad?
All major brands, including Atlas Copco, Ingersoll Rand, ELGi, KAESER, Chicago Pneumatic, Sullair, Doosan and Kirloskar. See brands we support.
Can I get an AMC for compressors in Hyderabad?
Yes. Visit frequency, included parts and response arrangements are set in the contract according to your machines and running hours. See compressor AMC.
What do you need to quote?
The application, required pressure, approximate air demand or tools in use, running hours and site location. For service and parts, a nameplate photo of the compressor.
Contact Reddy Compressors
Reddy Compressors, Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana. Tarnaka is in Secunderabad, a short drive from central Hyderabad.
Phone +91 99590 60718 or +91 92468 88812. Email reddycompressors@gmail.com. Or send an enquiry with your requirement, site and a nameplate photo if you have one.