Our Tarnaka base and the areas around it
Tarnaka sits on the eastern side of Secunderabad, close to Habsiguda, Nacharam, Mallapur, Uppal, Moula-Ali, Kushaiguda and Malkajgiri. The Nacharam, Mallapur, Moula-Ali and Cherlapally industrial areas, with their engineering, fabrication, plastics, printing and food units, are among our nearest neighbours. Further north and west, Bowenpally, Balanagar, Alwal and the cantonment area also have workshops, institutions and small factories that depend on compressed air.


Photographs from Reddy Compressors’ own fleet and workshop.
Being local is useful in a practical sense. A maintenance engineer can drop in with a failed valve or filter, a contractor can discuss a rental face to face, and a workshop owner can talk through a noisy piston compressor without waiting for a formal site visit.
Visiting our office: how to bring a part for identification
Many parts enquiries start with someone holding an old filter, valve or element and no part number. The fastest route to the right replacement is to bring both the part and the details of the machine it came from.
- Call +91 99590 60718 or +91 92468 88812 before you come, so that the right person is available.
- Photograph the compressor nameplate clearly, showing make, model, serial number and year if present.
- Note the running hours from the controller or hour meter.
- Bring the old part, cleaned of loose oil if possible, with any label or stamped number intact.
- If the part is too large or still fitted, photograph it from several angles with a scale such as a tape measure.
- We match the part to the machine and confirm fit before quoting, then explain genuine and aftermarket options where both exist.
The same information works on WhatsApp if you cannot visit. A sharp nameplate photo saves more time than any other single detail.
Who relies on compressed air in Secunderabad?
- Engineering and fabrication units in the eastern and northern industrial pockets, running screw compressors for tools, CNC machines, painting and pneumatic automation.
- Hospitals, laboratories and institutions that need service or standby air, and want a planned response if the main unit fails.
- Construction, road and building contractors who need portable air for breakers, chipping hammers, concrete work and sandblasting.
- Garages, tyre shops and two-wheeler service centres running reciprocating piston compressors for tyre inflation, impact tools and spray guns.
- Borewell drilling contractors working in Medchal-Malkajgiri and surrounding districts, needing high-pressure portable machines and engine parts.
Workshop piston compressors: common faults and what they mean
Reciprocating compressors are the workhorses of Secunderabad’s garages and small workshops. They are simple, but neglected ones waste power and deliver wet, oily air. The table below lists the common faults and their usual causes, so a workshop can check them before replacing anything. Small 2–10 hp units are available from us for sale and on hire, but we do not service them; our service covers larger two-stage and high-pressure piston compressors.
| Symptom | Likely causes | What to check |
|---|---|---|
| Takes much longer to fill the tank | Worn rings, leaking valve plates, clogged intake filter, slipping belt | Pump-up time test, valve condition, belt tension, intake |
| Oil in the air line or at the spray gun | Worn rings or cylinder, wrong oil grade, overfilled crankcase, overheating | Oil level and grade, compression condition, cooling fins |
| Water at the tyre gun or tools | No aftercooler or dryer, tank not drained, hot discharge air | Drain valve, tank condition, need for a separator or small dryer |
| Motor trips or hums at start | Unloader not releasing head pressure, low voltage, capacitor or starter fault | Unloader and pressure switch, supply voltage, starter |
| Knocking noise | Worn bearings or connecting rod, loose pulley or flywheel | Bearing play, pulley fixing, crankcase oil condition |
| Safety valve lifting | Pressure switch set too high or failed, faulty gauge | Switch cut-out setting, gauge accuracy, safety valve test |
A piston compressor tank is a pressure vessel. Daily draining, a working safety valve and periodic inspection of the shell for internal corrosion are basic safety, not optional extras.
When a piston compressor should become a screw compressor
Workshops often add piston units one at a time until three or four are running most of the day. At that point a single rotary screw compressor is usually worth considering. Piston compressors are designed for intermittent duty; run near-continuously they get hot, wear quickly and pass more oil. A screw compressor is designed for continuous duty, is quieter, and with a dryer delivers drier air to paint and tools.
The decision rests on hours of use, total demand in cfm or m³/min of free air delivery, noise limits, available power and floor space. We can compare the running cost of the existing machines against a screw package and give you the figures to decide.
Standby and service air for hospitals and institutions
Hospitals, laboratories and colleges in Secunderabad use compressed air for workshops, laboratory services, building systems and sometimes process equipment. The engineering question is usually resilience: what happens when the only compressor stops?
- Is there a second machine, and is it exercised regularly so that it actually starts when needed?
- Is the dryer and filtration suitable for the end use, and are filter elements changed on schedule?
- Are drains working, so that condensate does not reach downstream equipment?
- Is there a plan, such as a rental connection point, if both machines are out of action?
We also supply and service medical-air compressors. Medical gas pipelines and their certification are a regulated specialist field, handled by the hospital’s medical gas contractor; our part is the compressor plant and the general compressed air for building, laboratory and workshop services.
Sales, rental, service and parts from Secunderabad
From Tarnaka we handle the full lifecycle of a compressor:
- Sales: new rotary screw, reciprocating, oil-free and portable diesel compressors, plus dryers, filters, receivers and piping, and used and refurbished machines.
- Rental: diesel and electric machines from 50 to 2,000 cfm and 2 to 30 bar through our rental engineering service, for breakdowns, shutdowns, drilling, blasting and site work.
- Service and AMC: scheduled servicing, breakdown repair, overhaul, airend overhaul and air audits, with a written record of each visit.
- Spare parts: service kits, filters, separators, oils, valves, sensors, coolers and portable-engine parts, identified from the machine before quoting.
Customers close to our office often combine these: a rental keeps the shop running while the main compressor is overhauled, and the parts for the next service are collected from Tarnaka.
Preparing for a service visit
A visit goes faster and finds more when the site is ready. Before our technician arrives:
- Note any alarms, trip messages or unusual noises, with the time they happened.
- Keep the controller or hour meter readings visible and accessible.
- Arrange safe isolation, so that the machine can be stopped, locked off and depressurised.
- Clear access around the compressor, dryer and receiver.
- Have previous service reports to hand, whoever carried them out.
Industrial areas we cover from Tarnaka
When people in Secunderabad search for “compressor repair”, most results are for air-conditioner and refrigerator compressors. We do not repair those. Our work is industrial and commercial air compressors (screw, piston, oil-free, portable diesel), gas compressors, blowers, vacuum pumps and air dryers. The table below shows the industrial and commercial pockets around our Tarnaka office and the kind of compressed-air users typically found in each. It is a general picture of the area, not a customer list.
| Area | Typical compressed-air users | Machines we usually see |
|---|---|---|
| Nacharam and Mallapur industrial areas | Fabrication, sheet-metal, packaging, printing, food and pharmaceutical units | Screw compressors 10–75 kW, refrigerated dryers, line filters |
| Cherlapally industrial area | Engineering, plastics, chemicals, steel processing, larger fabrication shops | Screw compressors 22–160 kW, piston units for maintenance, dryers |
| Uppal and Habsiguda | Small industries, service centres, printing and packaging, commercial buildings | Piston compressors 2–10 hp, small screw packages |
| Kushaiguda, ECIL and AS Rao Nagar | Electronics and precision workshops, tool rooms, laboratories, small assembly units | Oil-free piston and scroll units, small screw compressors with dryers |
| Moula-Ali | Engineering workshops, rail-related maintenance support, transport workshops | Two-stage piston compressors, screw compressors |
| Sainikpuri and Malkajgiri | Garages, tyre shops, dental and medical clinics, small fabrication shops | Tank-mounted piston units, oil-free dental compressors |
| Bowenpally, Balanagar and Sanathnagar | Machine shops, auto-component units, forging, foundry and fabrication | Screw compressors 15–110 kW, two-stage piston units, dryers |
| Begumpet and the Secunderabad Cantonment area | Vehicle workshops, hospitals and institutions, commercial buildings, service stations | Piston compressors, oil-free units, standby screw compressors |
For sites further out, see the Hyderabad and Telangana pages.
Compressor repair call-outs: symptom, likely cause and what we check
The earlier fault table on this page covers workshop piston compressors. The faults below are the commonest call-outs on industrial screw and larger piston compressors. Tell us the symptom and the controller message when you call, and photograph the display before resetting anything, because a reset often clears the fault history.
| Symptom | Likely causes | What we check |
|---|---|---|
| High temperature trip (screw) | Blocked or dusty oil cooler, low oil level, stuck thermostatic valve, clogged oil filter, hot or recirculating room air, failed cooling fan | Cooler fins front and back, oil level and condition, thermostatic valve action, oil filter differential, room temperature and hot-air ducting, fan motor and direction |
| No pressure build-up or slow build-up | Inlet valve not opening, blocked air filter, solenoid or control fault, large leak, worn piston valves or rings, blow-down valve stuck open | Inlet valve and solenoid operation, filter condition, loaded current against rated current, blow-down valve, a pump-up test against rated free air delivery |
| Oil in the air (screw) | Failed or wrongly fitted separator element, blocked scavenge line, oil overfilled, minimum pressure valve fault, running unloaded for long periods at low pressure | Separator differential pressure, scavenge line and orifice, oil level, minimum pressure valve, load and unload pattern |
| Motor trip or overload | Low or unbalanced supply voltage, star-delta timer or contactor fault, loose terminations, high discharge pressure, seized airend or bearing wear | Voltage on all three phases at start and under load, current balance, contactor and timer, terminal tightness, pressure setting, airend rotation by hand with power isolated |
| Water in the air lines | Dryer bypassed or not cooling, auto-drain blocked, aftercooler fouled, receiver not drained, piping without drain legs, monsoon humidity overloading an undersized dryer | Dryer dew point and refrigerant condition, every drain, aftercooler approach temperature, receiver drain, dryer size against flow and inlet temperature |
| New or unusual noise | Bearing wear in the airend or motor, coupling or belt wear, loose panels or mounts, valve failure (piston), unloading chatter from a faulty valve | Bearing noise and vibration, coupling and belt condition, mounts, valve plates, inlet and minimum pressure valve behaviour |
For a deeper explanation of each fault and the repair process, see air compressor repair in Hyderabad and screw compressor service.
Repair or replace an older compressor?
A compressor that is ten or fifteen years old can usually be repaired. The real question is whether the money is better spent on an overhaul, a refurbished machine or a new one. Three things decide it: the cost and risk of the repair, the energy the machine wastes, and how long you plan to keep it.
What to compare
- Specific power: electrical input in kW for each m³/min of free air delivered. A worn airend, a slipping belt or a sticking inlet valve raises it. Measure loaded kW and delivered air with a pump-up test before deciding.
- Running hours per year: energy dominates the lifetime cost of a machine that runs two shifts. On a single-shift machine running half-loaded, the case for replacement is much weaker.
- Repair scope: a service with filters and oil is minor. An airend overhaul, motor rewind or new cooler is major. Get a written scope before comparing.
- Parts availability: for very old or discontinued models, parts may be slow to source, which raises the risk of long breakdowns.
Worked example (illustrative)
A fixed-speed screw compressor rated at 3.0 m³/min (105.9 cfm) at 7 bar g runs 4,000 loaded hours a year. A pump-up test and power reading show a specific power of 8.0 kW per m³/min. Tariff is taken as ₹8.50 per kWh (illustrative).
| Option | Specific power (kW per m³/min) | Input power (kW) | Energy per year (kWh) | Energy cost per year |
|---|---|---|---|---|
| Keep as it is | 8.0 | 8.0 × 3.0 = 24.0 | 24.0 × 4,000 = 96,000 | ₹8,16,000 |
| Airend overhaul, or a refurbished machine of similar efficiency | 7.0 | 7.0 × 3.0 = 21.0 | 21.0 × 4,000 = 84,000 | ₹7,14,000 |
| New efficient machine | 6.6 | 6.6 × 3.0 = 19.8 | 19.8 × 4,000 = 79,200 | ₹6,73,200 |
- The overhaul saves 96,000 − 84,000 = 12,000 kWh, or 12,000 × ₹8.50 = ₹1,02,000 a year, against leaving it worn.
- A new machine saves a further 84,000 − 79,200 = 4,800 kWh, or ₹40,800 a year, against the overhauled one.
- So every ₹1,00,000 of extra spend on a new machine over the overhaul takes 1,00,000 ÷ 40,800 = about 2.5 years to recover from energy alone.
In this example the overhaul clearly pays for itself. Whether a new machine is worth the extra depends on the actual price difference, how long you will keep it, and whether demand varies enough for a variable-speed machine to save more. A refurbished compressor sits in between: it costs less than new, and ours carry a six-month warranty from the delivery or invoice date. Use your own figures in the lifecycle cost comparison calculator or the running cost calculator, and see used air compressors for sale for the refurbished route.
Identifying spares for common makes from the nameplate
Most delays in getting compressor spares come from incomplete identification. The same make often uses different separators, valves and kits across model years and pressure ratings. The nameplate, read correctly, usually settles it.
| Nameplate or label item | Why it matters for spares |
|---|---|
| Make and full model code | Identifies the family; suffixes often mark pressure rating, cooling type or a later revision |
| Serial number and year of manufacture | Separates model years that use different filters, valves or controllers |
| Rated working pressure, bar g or psig | Decides minimum pressure valve, safety valve and some separator ratings |
| Motor kW or hp, voltage and frame | Needed for bearings, couplings, belts and starter parts |
| Airend or pump serial number | Needed for overhaul kits and bearing sets, since airends are sometimes changed in service |
| Part numbers on the old filter, separator or kit | The fastest confirmation; photograph the label before discarding the old part |
We supply spares for ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Gardner Denver, Sullair, Doosan, Kirloskar and other makes. Send clear photographs of the nameplate and the old part, or bring them to our Tarnaka office. See compressor spare parts in Hyderabad, the parts section, or use the spare parts identification enquiry.
How Reddy Compressors helps
We are an independent multi-brand specialist, supporting Atlas Copco, Ingersoll Rand, ELGi, KAESER, Chicago Pneumatic, Gardner Denver, Sullair, Doosan, Kirloskar, Bobcat and many other machines. We are not an authorised distributor of any brand. We have tie-ups with all major and reputed brands. Secunderabad is our home ground and our only office. From Tarnaka our service teams travel throughout Telangana and Andhra Pradesh, and we dispatch compressors, rental machines and spares to customers in any state, with project-based site support where feasible.
For a customer near Tarnaka, that also means one office to call or visit for selection, rental, servicing and parts across every compressor you own, and a team that keeps your machine history together.
Reddy Compressors, Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana. Phone +91 99590 60718 or +91 92468 88812. WhatsApp +91 99590 60718. Email info@reddycompressors.com or reddycompressors@gmail.com.
What to send us
- Your location in Secunderabad and whether you would like to visit, or would like us to visit.
- A nameplate photo with make, model and serial number.
- Running hours and a description of the fault or requirement.
- For parts: a photo of the old part and any number on it.
- For a new machine or rental: pressure needed, tools or demand, and hours of use.
Frequently asked questions
Where is Reddy Compressors located in Secunderabad?
Our office is at Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana. Tarnaka is on the eastern side of Secunderabad, close to Habsiguda, Nacharam and Uppal. Please call +91 99590 60718 or +91 92468 88812 before visiting so that the right person is available to help with your compressor, part or rental enquiry.
Can I bring an old compressor part to your office for identification?
Yes. Call ahead, then bring the old part along with a clear photo of the compressor nameplate showing make, model and serial number, plus the running hours. We identify the part from the machine and confirm fit before we quote. If the part is too large to carry or still fitted, photographs from several angles with a measuring tape in view are a good start.
Why is there oil coming out with the air from my piston compressor?
Oil in the discharge air of a reciprocating compressor usually points to worn piston rings or cylinders, the wrong oil grade, an overfilled crankcase or a machine running too hot because it is overloaded. Running a piston unit almost continuously accelerates all of these. We check oil level and grade, compression condition and cooling, and advise whether repair, a filter or a larger machine is the right fix.
Should I replace my workshop piston compressors with a screw compressor?
If several piston compressors run most of the working day, a single rotary screw compressor is usually worth comparing. Screw machines are designed for continuous duty, run quieter and, with a dryer, deliver drier air. The decision depends on total demand, hours of use, noise limits, power supply and space. We can compare running costs and give you the figures to decide.
Do you service compressors for hospitals in Secunderabad?
Yes. We service general compressed-air systems in hospitals, laboratories and institutions, including standby arrangements, dryers, filters and drains, and we supply and service medical-air compressors. Medical gas pipelines and their certification are a regulated specialist field handled by the hospital’s medical gas contractor. We can help plan standby or rental cover for the general air system.
Do you supply compressors across India?
Yes. Although our office is in Tarnaka, Secunderabad, new and used compressors, rental machines and spare parts are supplied to customers across India. Servicing, AMCs and breakdown visits are handled by our teams throughout Telangana and Andhra Pradesh, and site support in other states is arranged project by project where feasible. Send the site location, duty and machine details, and we will confirm what we can supply and support.
Do you deliver rental compressors to sites in Secunderabad?
Yes. Rental compressors are delivered, started up and collected by us, with hoses and moisture control as agreed in the rental proposal. Diesel and electric machines are available from 50 to 2,000 cfm and 2 to 30 bar. The minimum hire period and rate depend on machine size and distance to site and are stated in writing before the hire starts.
Where can I get compressor repair in Secunderabad?
Reddy Compressors repairs industrial and commercial air compressors from its office at Tarnaka, Secunderabad: screw, piston, oil-free and portable diesel compressors, plus dryers, blowers and vacuum pumps of all major makes. We do not repair air-conditioner or refrigerator compressors. Call or WhatsApp +91 99590 60718 with the make, model, symptom and any controller message, and a photograph of the nameplate if you can. We can attend on site or advise whether the job needs workshop repair.
What are your opening hours in Secunderabad?
Our Tarnaka office is open seven days a week, 8:30 am to 8:30 pm. You can call +91 99590 60718 or +91 92468 88812, send a WhatsApp message, or email info@reddycompressors.com or reddycompressors@gmail.com. If you plan to bring a part for identification, call first so the right person is available, and bring the nameplate details and the old part or clear photographs of both.
Do you attend compressor breakdowns on Sundays?
We are open seven days a week, including Sundays, so you can report a breakdown and get advice the same day. When an engineer can reach your site depends on the location, the job and the engineers already committed, so we confirm timing when you call rather than promising it in advance. Sending the symptom, controller message and nameplate photographs first helps us bring the right parts on the first visit.
Where can I buy air compressor spares in Secunderabad?
We supply compressor spares from Tarnaka for all major makes: air, oil and separator filters, oil, valves, overhaul kits, bearings, couplings, belts, drains, sensors and controller parts, plus dryer and filter elements. Send the nameplate details and a photograph of the old part, ideally with its part number, and we confirm the correct item before supply. Stock varies, so we confirm availability for each order.
Related pages
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 7 November 2026. How our engineering content is reviewed.