Used & refurbished

Used air compressors for sale in Hyderabad

13 min read16 sections

Why buy a used compressor from a yard rather than a listing?

A second-hand compressor bought from an online listing is a photograph and a promise. What you cannot see is the hour meter that was reset, the airend that whines under load, the separator that has been passing oil for a year, or the engine that starts well cold and loses power hot. You find those things out in your first month, at your cost.

A used compressor from a working yard is different in three ways. It has been run under load by people who service these machines every day. The parts that were replaced are listed, and the parts that were left alone are stated. And the same service engineers who prepared it are the ones who will attend it in your plant afterwards on machines above 10 hp (small 2–10 hp units are for sale and hire only; we do not service them), so there is no gap between the seller and the service.

What is usually available

Stock changes week to week, because machines come in from fleet renewals, project closures and part exchanges. Rather than a list that is out of date the day it is published, this is the shape of what passes through the yard:

Type Typical duty Who buys it
Portable diesel screw compressors, 185–1,100 cfm, 7–25 bar Borewell and DTH rigs, sandblasting, construction, road and pipeline work Rig owners, blasting contractors, civil contractors
Electric rotary screw compressors, 10–250 hp, 7–13 bar Factory plant air, workshops running two or three shifts Manufacturers, engineering units, textile and food plants
Reciprocating (piston) compressors, 2–30 hp, on receivers Garages, tyre shops, small workshops, petrol pumps, intermittent duty Workshop owners, dealerships, small industry
Air dryers and receivers Paired with the machine above when needed Anyone replacing a complete installation

If you need a specific class – say a 400 cfm, 150 psig diesel unit, or a 50 hp electric screw – send it to us; machines in that class come up regularly and we will tell you when one is ready.

Used, serviced or refurbished: what you are actually buying

These words are used loosely elsewhere. Here they mean specific things.

  • Used (inspected): a machine sold in the condition we received it, after a running inspection and a load test. You get the inspection report, you know exactly what you are buying, the price reflects it, and it carries the six-month warranty.
  • Serviced: a used machine on which the routine items – filters, oil, separator, belts – have been renewed and the machine run-tested.
  • Refurbished: a machine that has been partly or wholly rebuilt: airend or engine attended where needed, coolers cleaned, valves and sensors replaced, control checked, then load-tested. It carries the same six-month warranty, with the refurbishment sheet listing every part renewed.

The full definitions, what the inspection covers and what the warranty excludes are on the used and refurbished compressors page.

The six-month warranty, in plain words

Every used and refurbished compressor is warranted for six months from the delivery or invoice date, and the warranty covers the whole compressor, not a short list of parts. It does not cover consumables (filters, oil, belts), damage from misuse or the wrong oil, work done by others during the warranty period, or accident and site damage. If the machine fails for a reason the warranty covers, our service engineers attend it; that is the point of buying from the people who service the machine.

How we match a used machine to your work

A used machine is a good buy only when it fits the duty. Before we quote, we ask four things: the pressure your tools or process need, the air they consume together, how many hours a day the machine will run, and where it will stand (dust, heat, ventilation, power supply). A workshop that runs a compressor twenty minutes in every hour can use an older piston machine happily; a plant that runs it twenty hours a day should be looking at a refurbished screw machine with an airend history, or a new one. We will say which, even when the answer is “buy new” or “hire for six months first”.

Seeing the machine

You are welcome to see and hear a machine run at the yard in Tarnaka before you buy, 7 days a week, 8:30 am to 8:30 pm. Bring the nameplate photo of the machine it is replacing, or the tool list, and a service engineer will go through the choice with you.

Part exchange and buying your old machine

We also buy used compressors and take machines in part exchange against a used, refurbished or new unit. Send the make, model, serial number, hour reading and a few photographs, and we will give you an indication before any inspection.

After the sale

Delivery and positioning can be arranged across Hyderabad and Secunderabad, the rest of Telangana and Andhra Pradesh, and by transport across India. Commissioning, the first service, an AMC and spares all come from the same team. The machine’s file – inspection, parts replaced, test readings – stays with us, so future service starts from a known history.

What the inspection actually covers

A used compressor is only as good as the questions asked of it before the sale. Every machine that comes into the yard goes through the same running inspection, and the report you receive follows the same order, so two machines can be compared line by line.

Area What is checked What a problem looks like
Identity and history Nameplate, serial number, hour meter, service stickers, any records that came with the machine Hour meter replaced or reset; serial plate missing
Airend (screw machines) Noise at load and unload, vibration at the bearings, oil condition and metal in the oil, shaft seal weep, discharge temperature at full load Whine or rumble under load; discharge temperature climbing past the normal band; grey or glittering oil
Cylinder block (piston machines) Pumping time to pressure, valve-plate temperature by cylinder, blow-by at the breather, oil carry-over One cylinder running hot; slow pump-up; oil mist from the breather
Engine (portable diesel) Cold and hot starting, smoke colour, oil pressure, coolant condition, fuel system, turbo play, belts, hours against the service record Blue or white smoke when hot; low oil pressure at idle; coolant in the oil
Pressure system Pressure rise time against the rating, unloading and reloading pressures, minimum-pressure valve, safety valve test, leak check with the machine off Slow rise; pressure that keeps falling with the machine stopped; safety valve that will not lift
Cooling Cooler cores (oil and air), fan, thermostatic valve action, temperatures at inlet and outlet of the cooler Blocked core; thermostat stuck on bypass; temperature trip on a hot day
Electrical Motor insulation, current draw per phase under load, starter, overloads, controller and sensors, cable condition Unbalanced currents; insulation below the safe value; sensor faults masked by jumpers
Frame, hoses, canopy Corrosion, cracked mounts, hose age and swelling, canopy and acoustic foam, towing gear and lights on portables Soft or perished hoses; cracked engine or airend mounts; missing acoustic panels

The report states which items passed, which were put right and which were left as found, so you know before you buy exactly what was checked and what was renewed.

What “refurbished” means mechanically

Refurbishment is not repainting. Depending on what the inspection found, a refurbished machine will have had some or all of the following: airend bearings and seals renewed or the airend exchanged; separator vessel opened, element and gaskets replaced and the scavenge line cleared; inlet and minimum-pressure valves rebuilt with kits; thermostatic element and oil cooler core cleaned or replaced; all filters, oil and belts renewed; sensors proved against a reference gauge; contactors and overloads checked and reset to the motor plate; on a diesel unit, injectors, filters, coolant, belts and hoses attended and the engine run to temperature under load. The machine is then run under load, the readings recorded, and the sheet goes into the file that follows the machine. Because the same technicians will service it afterwards, nobody has an incentive to hide anything.

Choosing between used, refurbished and new: the arithmetic

The right choice depends on three numbers: how many hours a day the machine runs, how much it costs when it stops, and how long you need it. A rough guide that holds for most buyers:

  • Under about 4 hours a day, or intermittent use (garage, tyre shop, small fabrication): a used or serviced piston machine on a receiver is the economical choice; the duty is light enough that age matters little if the valves and rings are sound.
  • One or two shifts, production depends on it: a refurbished screw compressor with a documented airend history and the six-month warranty, or a new machine if the price gap is small at the size you need.
  • Three shifts, or air quality matters (food, pharma, paint, instruments): usually a new machine; the energy cost over the life of a 24-hour machine dwarfs the purchase price, and a newer, more efficient airend pays for itself.
  • A project with a known end date: hire rather than buy; the hire or buy guide and the rental versus ownership calculator make the comparison.

Ask the service engineer to run the numbers for your case: the comparison shows the purchase price, the expected service cost over two years, and the energy cost at your tariff, for each option side by side.

Buying a used compressor for Indian site conditions

Machines that have worked in Telangana and Andhra Pradesh carry the marks of it: cooler cores packed with dust, canopy foam eaten by heat, hoses hardened by summers at 45 °C on open sites. None of this condemns a machine, but it changes what to look for. A used portable unit for borewell work should have a recent cooler clean and a thermostatic valve that opens correctly, or it will trip on the first hot afternoon at depth. A used electric screw machine for a factory should be checked for the voltage it was running on; machines that have lived with a weak supply often have motor and contactor damage that only shows under full load. These are the checks our technicians make because they are the faults they get called to fix.

A worked example

A fabrication unit in the Jeedimetla industrial area runs plasma cutting, grinders and a small paint booth for about ten hours a day. Its demand works out at roughly 60 cfm at 7 bar with short peaks when the booth gun and the grinders run together. A new 15 hp screw compressor is one answer. A refurbished 15–20 hp screw machine with a renewed separator, serviced airend and the six-month warranty, paired with a cleaned receiver and a refrigerated dryer for the paint, is the other. The refurbished option costs less to buy, runs on the same power, and carries a known history; for a ten-hour day it is the sensible choice, and that is what we would recommend. For a 24-hour plant with the same demand the answer flips to new, because the energy saving of a modern airend over three shifts outweighs the purchase saving within a few years.

Questions to ask any seller of a used compressor

Whether you buy from us or elsewhere, ask these and expect written answers: What is the serial number and is the hour meter original? What was replaced, and what was inspected and left? Was the machine run under load, and what were the discharge temperature and the pressure rise time? What oil is in it now? What is the warranty, from which date, and what does it exclude? Who will service it after the sale, and how far away are they? A seller who cannot answer these is selling a photograph.

What happens after you decide

Once you choose a machine, we confirm the specification, the inspection report and the warranty terms in writing, arrange transport and positioning, and a service engineer commissions the machine on your site: electrical connection checked, pressure set, dryer and drains proved, operators shown the daily checks. The first service after installation is scheduled from that day, and the machine’s file – inspection, refurbishment sheet, test readings, commissioning notes – stays with us so that every later visit starts from a known history.

Makes we sell used and refurbished

Our used and refurbished machines come from across the major makes: ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Sullair, Doosan, Kirloskar and other makes. Whichever make you buy, the terms are the same.

PointWhat it means for you
WarrantySix months from the delivery or invoice date, covering the whole compressor
Not coveredConsumables, misuse or wrong oil, service by others, and accident or site damage
Service after saleOur own service engineers for machines above 10 hp, across Telangana and Andhra Pradesh
SparesFilters, separators, oil and valve kits for the make you buy

If you have a make in mind, tell us the cfm and pressure you need and we will tell you what is in stock or coming in. Call or WhatsApp +91 99590 60718.

How Reddy Compressors helps

Independent multi-brand specialist since 2002; own yard and rental fleet; more than 20 service engineers and technicians across Telangana and Andhra Pradesh; used, refurbished and new machines, with service and spares for all of them.

What to send us

  • The work the compressor will do, and the pressure and air required (or the tools it will run)
  • Hours per day it will run, and your location
  • If it replaces an existing machine, a photo of its nameplate
  • WhatsApp is fastest: +91 99590 60718

Watch

Short explainers on this topic

Portable air compressors: mobile industrial energy1:20Watch with chapters and notes →
From compressed air to productive metres: DTH and borewell drilling1:40Watch with chapters and notes →
Air receiver tanks: sizing rule of thumb and why they matter1:15Watch with chapters and notes →
Air compressor technologies: piston, scroll, screw, centrifugal and portable1:20Watch with chapters and notes →

Slide-by-slide engineering explainers from Reddy Compressors. More in the video library.

Frequently asked questions

Do you have small second-hand compressors, 2–5 hp, for a garage?

Yes, piston compressors on receivers in that range pass through regularly. Tell us the tools you run and we will say whether a used unit or a new one makes more sense at that size. Units of this size are for sale and hire only; we service compressors above 10 hp.

Can I buy a used compressor and have it delivered outside Hyderabad?

Yes. We supply across India by transport; service support is strongest across Telangana and Andhra Pradesh and within about 300 km of Hyderabad.

Is there a warranty on a used machine?

Yes. Every used and refurbished compressor we sell carries the six-month warranty on the whole compressor, counted from the delivery or invoice date. A used machine also comes with its inspection report and test readings; a refurbished machine also comes with the refurbishment sheet listing the parts renewed.

What if the used machine is not right for my work?

That is what the pre-sale questions are for. If the duty does not suit any used machine we have, we will say so and offer hire or a new machine instead.

Do you buy used compressors?

Yes, outright or in part exchange. Send the details and photos first.

Can I get a used compressor with a dryer and receiver as a set?

Yes. Many buyers replace the whole installation; we match a cleaned receiver and a serviced or new dryer to the machine so the air at the tool is dry.

Can I hire first and buy later?

Yes. Some buyers hire a machine of the class they are considering for a month to prove the duty, then buy a used, refurbished or new unit with the hire counted against it by agreement.

Will you take my old compressor in exchange?

Yes, in part exchange against any used, refurbished or new machine, after inspection.

What paperwork comes with a used machine?

The inspection report, the refurbishment sheet where applicable, the test readings, the invoice with the warranty terms, and the manual where we have it.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 7 November 2026. How our engineering content is reviewed.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812