All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Reddy Compressors

Air Compressors in Secunderabad: Sales, Rental, Service and Spares

3 min read8 sections

Visiting us

Our address is Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana. If you are bringing a part for identification, call ahead on +91 99590 60718 or +91 92468 88812 so that the right person is available. Bring the old part and a photo of the compressor nameplate.

Atlas Copco XAH 210 portable compressor (450 CFM class) in our yard
Atlas Copco XAH 210 portable compressor (450 CFM class) in our yard
Ingersoll Rand 600 CFM, 200 psig portable compressor in our yard
Ingersoll Rand 600 CFM, 200 psig portable compressor in our yard

Photographs from Reddy Compressors' own fleet and workshop.

Who we work with in Secunderabad

  • Engineering, fabrication and manufacturing units in the eastern and northern industrial areas.
  • Hospitals, institutions and commercial buildings needing service or standby air.
  • Construction, road and building contractors needing portable air for tools, breakers and sandblasting.
  • Garages, tyre shops and workshops running piston compressors.
  • Borewell drilling contractors working in the surrounding districts.

Compressor sales in Secunderabad

New rotary screw, reciprocating, oil-free and portable diesel compressors from all major brands, with the dryers, filters, receivers and piping that complete the system. Each machine is selected against your pressure, air demand and running hours, and the quotation explains why. Used and refurbished compressors are available as well.

Compressor rental in Secunderabad

Diesel and electric compressors on hire from 50 to 2,000 CFM and 2 to 30 bar, for a day, a month or a season. Typical hires cover plant shutdowns, compressor breakdowns, borewell and DTH drilling, sandblasting, construction sites and peak demand. Hoses, manifolds and moisture control are planned with the machine.

Compressor service and AMC in Secunderabad

Breakdown repair, scheduled servicing and annual maintenance contracts for compressors of all makes, plus overhauling, airend overhaul and compressed-air audits. Every visit ends with a written record of what was checked, measured and replaced.

Compressor spare parts in Secunderabad

Service kits, air filters, oil filters, separators, compressor oils, valves, sensors, coolers and engine parts for all major brands. Parts are identified from the machine's nameplate before we quote. A clear photo of the nameplate and the old part is usually enough to start: see find my part.

Local support matters

A compressor problem costs money every hour it stops production. Being close to our customers in Secunderabad and Hyderabad means a technician can reach most sites the same day when the schedule allows, and parts can be collected or delivered without long waits. For planned work, our AMC contracts schedule visits before problems start.

Questions from customers in Secunderabad

Do you deliver rental compressors to sites in Secunderabad?

Yes. Rental machines are delivered, started up and collected by us, with hoses and moisture control as agreed in the rental proposal. Transport is planned with you, including site access and unloading.

How short can a rental be?

Short hires are possible. The minimum period and rate depend on the machine size and the distance to site, and are stated in the rental proposal.

Which compressor brands do you service in Secunderabad?

All major brands, including Atlas Copco, Ingersoll Rand, ELGi, KAESER, Chicago Pneumatic, Sullair, Doosan and Kirloskar. See brands we support.

Can I get an AMC for compressors in Secunderabad?

Yes. Visit frequency, included parts and response arrangements are set in the contract according to your machines and running hours. See compressor AMC.

What do you need to quote?

The application, required pressure, approximate air demand or tools in use, running hours and site location. For service and parts, a nameplate photo of the compressor.

Contact Reddy Compressors

Reddy Compressors, Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana.

Phone +91 99590 60718 or +91 92468 88812. Email reddycompressors@gmail.com. Or send an enquiry with your requirement, site and a nameplate photo if you have one.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812