All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Reddy Compressors

Ingersoll Rand Compressor Sales, Service and Spares

4 min read7 sections

Ingersoll Rand machines range from the familiar cream two-stage piston compressors in workshops to rotary screw compressors in factories and large portable diesel units on drilling sites. Reddy Compressors services, repairs and supplies parts for Ingersoll Rand compressors in Hyderabad, Secunderabad, Telangana and Andhra Pradesh.

Ingersoll Rand compressors we work on

  • Two-stage reciprocating compressors, tank-mounted and base-mounted (for example the T30 family).
  • Oil-injected rotary screw compressors, fixed and variable speed.
  • Portable diesel compressors for drilling and construction.
  • Dryers and filters installed with them.

Ingersoll Rand piston compressors are long-lived, and many have run for years. Typical work on them is valve service, ring and gasket replacement, belt and pulley alignment and oil changes. Screw machines need the same filter, separator and cooler discipline as any oil-injected compressor.

Ingersoll Rand compressor service and repair

We service and repair Ingersoll Rand compressors on site, as one-off visits or under an annual maintenance contract. Typical work includes:

  • Valve, ring and gasket service on piston compressors.
  • Belt, pulley and motor alignment.
  • Scheduled services on rotary screw machines.
  • Controller and sensor fault finding.
  • Pressure switch, unloader and safety valve checks.
  • Portable compressor engine and air-end service.

Every job is identified by the machine's model and serial number, and ends with a written record of what was checked, measured and replaced. Where a repair would cost more than the machine is worth, we tell you before starting.

Ingersoll Rand spare parts

We supply valve kits, piston rings and gaskets, air filters, oil filters, separators, compressor oil, belts and other parts for Ingersoll Rand machines. Parts are matched from the nameplate details, model and serial number, the part number on the old part where it is readable, and the machine's running hours. Send a photo of the nameplate and the old part through find my part and we will confirm the match before quoting.

Across brands

Models we supply and service

Three Ingersoll Rand reciprocating piston air compressors, tank-mounted and base-mounted models
Ingersoll RandIngersoll Rand Reciprocating Air Compressor Range
Ingersoll Rand tank-mounted rotary screw air compressor in cream and black
Ingersoll RandTank-Mounted Rotary Screw Air Compressor
Four Ingersoll Rand compressors: rotary screw, reciprocating and tank-mounted with dryer
Ingersoll RandIngersoll Rand Compressor Range

Manufacturer product images, shown to identify machines we sell, service and support. Brand names are trademarks of their owners.

Buying an Ingersoll Rand compressor, new or used

If you are considering an Ingersoll Rand machine, we can supply new or used and refurbished units where available, and compare them honestly with other makes for your duty. The choice should follow the pressure, air demand, running hours, air quality and service plan, not the badge.

Hire while your Ingersoll Rand compressor is down

If your Ingersoll Rand compressor is out of service for repair or overhaul, a breakdown rental from our fleet of 50 to 2,000 CFM machines can keep the site running until it returns.

Signs your Ingersoll Rand compressor needs attention

  • High discharge temperature or temperature trips: often a blocked cooler, low or degraded oil, a sticking thermostatic valve or a hot, poorly ventilated room.
  • Oil in the air lines: commonly a saturated separator, a blocked scavenge line or overfilling.
  • Pressure falling under load: demand above capacity, leaks, a blocked intake filter, a worn valve or an unloader fault.
  • Frequent loading and unloading: too small a receiver, a narrow pressure band or a leak on the system.
  • New noise or vibration: bearing wear, loose mountings, belt or coupling problems. Stop and inspect before it gets worse.
  • Water at the point of use: a failed drain, an overloaded or faulty dryer, or no dryer where one is needed.
  • Hard starting on a diesel portable: battery, starter, fuel filters or fuel quality.

Write down any alarm code on the controller and the readings at the time. That information often lets us bring the right parts on the first visit.

Questions about Ingersoll Rand compressors

Will independent service affect my Ingersoll Rand warranty?

Check your warranty terms before any work is done while the machine is under manufacturer warranty. Some warranties require service by an authorised partner. Once the warranty has ended, or for work the warranty does not cover, an independent multi-brand service provider can maintain the machine. We will ask about warranty status before we start.

Do you fit original Ingersoll Rand parts?

We can supply original manufacturer parts or quality compatible alternatives. The quotation always states which, so that you can choose with full information.

Can you service the Ingersoll Rand dryer and filters as well?

Yes. Dryers, line filters and drains are checked as part of the system, because wet or dirty air can cause problems even when the compressor is healthy.

How quickly can you reach my site?

It depends on where the site is and what is already booked. Sites in Hyderabad and Secunderabad are the quickest to reach. When you call, we give you a realistic time.

What to send us

  • Model and serial number (nameplate photo).
  • Running hours.
  • The fault or the service due, with any controller alarm codes.
  • Site location.

Call +91 99590 60718 or +91 92468 88812, email reddycompressors@gmail.com, or use the service enquiry. See also all brands we support.

Ingersoll Rand is a trademark of its owner. Reddy Compressors is an independent multi-brand compressor business and is not an authorised Ingersoll Rand distributor, dealer or service partner unless this is stated in writing for a specific product. Where we supply parts, the quotation states whether they are original manufacturer parts or compatible alternatives.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812