All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Reddy Compressors

Sullair Compressor Sales, Service and Spares

4 min read7 sections

Sullair compressors we work on

  • Portable diesel compressors for drilling, construction and sandblasting, including high-pressure drilling machines.
  • Stationary rotary screw compressors (for example the LS family).
  • Dryers and filters installed with them.

On Sullair portable compressors used for drilling, the engine, intake filtration and the high-pressure air system all work hard. Regular engine service, separator and oil changes, and inspection of hoses and safety valves are the basis of reliable drilling air.

Sullair compressor service and repair

We service and repair Sullair compressors on site, as one-off visits or under an annual maintenance contract. Typical work includes:

  • Engine and compressor service on portable diesel machines.
  • Separator, filter and oil changes.
  • Inlet valve and pressure regulation service.
  • Safety valve and hose inspection.
  • Scheduled service on stationary screw compressors.
  • Airend inspection and overhaul planning.

Every job is identified by the machine's model and serial number, and ends with a written record of what was checked, measured and replaced. Where a repair would cost more than the machine is worth, we tell you before starting.

Sullair spare parts

We supply air filters, oil filters, separators, compressor oil, engine filters, valve kits, hoses and other parts for Sullair machines. Parts are matched from the nameplate details, model and serial number, the part number on the old part where it is readable, and the machine's running hours. Send a photo of the nameplate and the old part through find my part and we will confirm the match before quoting.

Buying a Sullair compressor, new or used

If you are considering a Sullair machine, we can supply new or used and refurbished units where available, and compare them honestly with other makes for your duty. The choice should follow the pressure, air demand, running hours, air quality and service plan, not the badge.

Hire while your Sullair compressor is down

If your Sullair compressor is out of service for repair or overhaul, a breakdown rental from our fleet of 50 to 2,000 CFM machines can keep the site running until it returns.

Signs your Sullair compressor needs attention

  • High discharge temperature or temperature trips: often a blocked cooler, low or degraded oil, a sticking thermostatic valve or a hot, poorly ventilated room.
  • Oil in the air lines: commonly a saturated separator, a blocked scavenge line or overfilling.
  • Pressure falling under load: demand above capacity, leaks, a blocked intake filter, a worn valve or an unloader fault.
  • Frequent loading and unloading: too small a receiver, a narrow pressure band or a leak on the system.
  • New noise or vibration: bearing wear, loose mountings, belt or coupling problems. Stop and inspect before it gets worse.
  • Water at the point of use: a failed drain, an overloaded or faulty dryer, or no dryer where one is needed.
  • Hard starting on a diesel portable: battery, starter, fuel filters or fuel quality.

Write down any alarm code on the controller and the readings at the time. That information often lets us bring the right parts on the first visit.

Questions about Sullair compressors

Will independent service affect my Sullair warranty?

Check your warranty terms before any work is done while the machine is under manufacturer warranty. Some warranties require service by an authorised partner. Once the warranty has ended, or for work the warranty does not cover, an independent multi-brand service provider can maintain the machine. We will ask about warranty status before we start.

Do you fit original Sullair parts?

We can supply original manufacturer parts or quality compatible alternatives. The quotation always states which, so that you can choose with full information.

Can you service the Sullair dryer and filters as well?

Yes. Dryers, line filters and drains are checked as part of the system, because wet or dirty air can cause problems even when the compressor is healthy.

How quickly can you reach my site?

It depends on where the site is and what is already booked. Sites in Hyderabad and Secunderabad are the quickest to reach. When you call, we give you a realistic time.

What to send us

  • Model and serial number (nameplate photo).
  • Running hours.
  • The fault or the service due, with any controller alarm codes.
  • Site location.

Call +91 99590 60718 or +91 92468 88812, email reddycompressors@gmail.com, or use the service enquiry. See also all brands we support.

Sullair is a trademark of its owner. Reddy Compressors is an independent multi-brand compressor business and is not an authorised Sullair distributor, dealer or service partner unless this is stated in writing for a specific product. Where we supply parts, the quotation states whether they are original manufacturer parts or compatible alternatives.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812