All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Video library

On-site oxygen and nitrogen generation: PSA, VPSA and membrane explained in an 80-second video

3 min read8 sections
The future of industrial gas generation: oxygen and nitrogen on site1:20 · 16 chapters · no spoken audio · Reddy Compressors

Video chapters

  1. The future of industrial gas generation
  2. Why oxygen and nitrogen matter
  3. From delivered gas to on-site generation
  4. The science begins with air
  5. Oxygen generation technologies: PSA
  6. Large-scale oxygen: VPSA
  7. Nitrogen generation technologies: PSA
  8. Membrane nitrogen technology
  9. Anatomy of an industrial gas plant
  10. From air to industrial gas
  11. Engineering performance: purity and flow
  12. Where oxygen and nitrogen are used
  13. Reliability engineering
  14. Smart digital gas plants
  15. Sustainability through on-site generation
  16. The big engineering lesson

The video is silent and shows 16 slides of five seconds each.

The technologies

Technology Gas Typical purity How it works
PSA nitrogen Nitrogen 95–99.999% Carbon molecular sieve adsorbs oxygen under pressure; two towers alternate
Membrane nitrogen Nitrogen 95–99.5% Hollow fibres let oxygen and water vapour pass faster than nitrogen
PSA oxygen Oxygen 90–95% Zeolite adsorbs nitrogen under pressure
VPSA oxygen Oxygen 90–93% typical Low-pressure blower feed and vacuum regeneration for large flows

The compressed-air side decides performance

PSA and membrane generators are fed by a compressor, so their output and purity depend on feed air: the correct pressure, enough flow, a low dew point and oil-free or thoroughly filtered air. Oil and water poison adsorbent beds and membranes. A typical feed train is compressor, receiver, refrigerated or desiccant dryer, coalescing and activated-carbon filters, then the generator and a product receiver.

Purity, flow and cost

Higher purity costs more air: a nitrogen generator producing 99.99 per cent needs considerably more feed air per cubic metre of product than one producing 98 per cent. Specify the purity each process really needs, not the highest available, and size the compressor for the generator’s feed requirement at that purity.

Where the gases are used

Nitrogen: food packaging, pharmaceuticals, electronics soldering, laser cutting, tyre filling, blanketing and purging. Oxygen: hospitals (under the applicable medical rules), glass and metal cutting, aquaculture, wastewater treatment and ozone generation.

Reliability, digital monitoring and sustainability

Reliable plants monitor purity, pressure, dew point and flow continuously, with alarms and a standby supply for critical uses. On-site generation removes cylinder handling and delivery trips, and with an efficient compressor it usually costs less than bought-in gas for steady demand.

How Reddy Compressors helps

We supply and service PSA and membrane nitrogen generators, nitrogen boosters and the compressors, dryers and filters that feed them, and size the feed air for your purity and flow.

Reddy Compressors has worked from Secunderabad since 2002 as an independent, multi-brand supplier: sales of new, used and refurbished compressors, hire from our own fleet of 50 to 2,000 cfm, service by our own engineers for machines above 10 hp, and spare parts matched to the nameplate. We cover Hyderabad, the whole of Telangana and Andhra Pradesh and districts within about 300 km, and supply across India. Call or WhatsApp +91 99590 60718, open 7 days, 8:30 am to 8:30 pm.

Frequently asked questions

What purity can an on-site nitrogen generator give?

PSA generators typically produce 95–99.999 per cent nitrogen; membrane generators typically 95–99.5 per cent. Higher purity needs more feed air per unit of product.

Why does a nitrogen generator need dry, clean air?

Water and oil damage the adsorbent beds in PSA units and the fibres in membranes, reducing purity and life. Feed air needs a dryer and coalescing and carbon filters.

Is on-site nitrogen cheaper than cylinders?

For steady demand it usually is, because the main cost is the electricity for the feed compressor. For very small or occasional use, cylinders may still suit.

What purity does PSA oxygen give?

Typically 90–95 per cent oxygen, which suits most industrial uses; medical use must meet the applicable rules for oxygen supply.

Does the video have sound?

No, it is a silent slide explainer; use the chapters to jump to a topic.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 24 November 2026. How our engineering content is reviewed.