All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Reddy Compressors

Air Compressors Across Telangana

3 min read7 sections

Reddy Compressors supports compressor users across Telangana from Tarnaka, Secunderabad. Beyond the twin cities, much of our work is in the districts: borewell and DTH drilling, quarries and stone crushing, road and building construction, rice mills and agro-processing, pharmaceutical and engineering units, and the workshops that serve them.

Typical work across Telangana

  • Borewell and water-well drilling: high-pressure portable compressors on sale or hire, with service and spares for drilling-class machines. See the borewell and DTH library.
  • Quarries and mining: air for rock drills and DTH drilling, and for plant maintenance.
  • Road, irrigation and building projects: portable air for breakers, sandblasting and concrete work.
  • Factories and processing units: rotary screw and reciprocating compressors, dryers and filters for plant air.
  • Workshops and garages: piston compressors, service and parts.

Compressor sales in Telangana

New rotary screw, reciprocating, oil-free and portable diesel compressors from all major brands, with the dryers, filters, receivers and piping that complete the system. Each machine is selected against your pressure, air demand and running hours, and the quotation explains why. Used and refurbished compressors are available as well.

Compressor rental in Telangana

Diesel and electric compressors on hire from 50 to 2,000 CFM and 2 to 30 bar, for a day, a month or a season. Typical hires cover plant shutdowns, compressor breakdowns, borewell and DTH drilling, sandblasting, construction sites and peak demand. Hoses, manifolds and moisture control are planned with the machine.

Compressor service and AMC in Telangana

Breakdown repair, scheduled servicing and annual maintenance contracts for compressors of all makes, plus overhauling, airend overhaul and compressed-air audits. Every visit ends with a written record of what was checked, measured and replaced.

Compressor spare parts in Telangana

Service kits, air filters, oil filters, separators, compressor oils, valves, sensors, coolers and engine parts for all major brands. Parts are identified from the machine's nameplate before we quote. A clear photo of the nameplate and the old part is usually enough to start: see find my part.

Working in the districts

For sites outside Hyderabad we plan the visit or rental with the logistics in mind: transport of the machine, fuel or power on site, access for a service vehicle, and parts carried on the first visit wherever the nameplate details allow. Sending clear photos of the nameplate and the problem before the visit saves a second trip.

Questions from customers in Telangana

Do you deliver rental compressors to sites in Telangana?

Yes. Rental machines are delivered, started up and collected by us, with hoses and moisture control as agreed in the rental proposal. Transport is planned with you, including site access and unloading.

How short can a rental be?

Short hires are possible. The minimum period and rate depend on the machine size and the distance to site, and are stated in the rental proposal.

Which compressor brands do you service in Telangana?

All major brands, including Atlas Copco, Ingersoll Rand, ELGi, KAESER, Chicago Pneumatic, Sullair, Doosan and Kirloskar. See brands we support.

Can I get an AMC for compressors in Telangana?

Yes. Visit frequency, included parts and response arrangements are set in the contract according to your machines and running hours. See compressor AMC.

What do you need to quote?

The application, required pressure, approximate air demand or tools in use, running hours and site location. For service and parts, a nameplate photo of the compressor.

Contact Reddy Compressors

Reddy Compressors, Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017, Telangana.

Phone +91 99590 60718 or +91 92468 88812. Email reddycompressors@gmail.com. Or send an enquiry with your requirement, site and a nameplate photo if you have one.

Related pages

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812