Video chapters
- From compressed air to productive metres
- Air-rotary drilling: how the air works
- Hole cleaning: the hidden productivity variable
- Water-well drilling as a complete system
- DTH drilling: energy delivered to the rock
- Rock mechanics: why the same compressor drills differently
- DTH bit engineering: where energy meets geology
- Hammer physics: impact energy, frequency and lubrication
- Pressure vs airflow: never confuse the two
- Annular velocity: the parameter behind cfm
- Multiphase cuttings transport
- Deep drilling, boosters, altitude and temperature
- Compressor selection: engineer the envelope
- Fuel, penetration rate and cost per productive metre
- Reliability engineering before start-up
- From water strike to engineered well
- The future: digital water-resource engineering
The video is silent and changes slide every few seconds. The notes below expand each chapter with the figures we use when matching a compressor to a borewell rig in Telangana and Andhra Pradesh.
Two jobs: breaking rock and cleaning the hole
A down-the-hole (DTH) hammer sits directly behind the bit at the bottom of the hole. Compressed air drives its piston against the bit many times a second, so impact energy reaches the rock without being lost along the drill string. The exhausted air then flows back up the annulus, the gap between the drill pipe and the hole wall, carrying cuttings and water to the surface. If the hammer has pressure but the annulus lacks velocity, the bit regrinds its own cuttings, penetration falls and the risk of a stuck string rises.
Pressure is not airflow
| What it does | What sets it | |
|---|---|---|
| Pressure (bar g / psig) | Hammer impact energy and frequency; overcoming water head in the hole | Hammer type, depth below water, booster if needed |
| Airflow (cfm / m³/min) | Hammer consumption and the uphole velocity that lifts cuttings | Hammer size, hole and pipe diameters, depth |
Borewell compressors in our region typically work at 13.8–27.6 bar (200.2–400.3 psig), with special units to 35 bar (507.6 psig) for deep wet holes. Each 100 ft of standing water in the hole adds about 3 bar of back-pressure the compressor must overcome.
Annular velocity: the number behind the cfm
Uphole velocity in ft/min is 183.35 × cfm ÷ (D² − d²), with the hole diameter D and pipe diameter d in inches. An 8-inch hole with 4½-inch pipe at 900 cfm gives 183.35 × 900 ÷ (64 − 20.25) ≈ 3,770 ft/min, comfortably above the widely used guide of about 3,000 ft/min for dry drilling. Wet holes, foam and larger cuttings need more. Our annular velocity guide and calculator work through other hole sizes.
Rock, bits and hammers
The same compressor drills hard granite, weathered rock and clay very differently. Hard, competent rock rewards higher pressure and a button bit with the right carbide grade; broken or clay-rich ground needs more air to keep the hole clean and sometimes casing. Hammers also need the correct rock-drill oil fed into the air line: too little wears the piston and cylinder, too much wastes oil and fouls the hole.
Deep holes, boosters and site conditions
Beyond about 600–800 ft or with heavy water inflow, many rigs add a booster to raise pressure from the main compressor. Altitude and heat reduce what the compressor delivers: at about 540 m, Hyderabad’s air is about 6 per cent less dense than at sea level, and summer temperatures above 45 °C stress cooling. We select with margin for these conditions rather than from the sea-level data sheet.
Cost per productive metre
The right measure is not litres of diesel per hour but cost per metre drilled: fuel, bits, hammer wear and rig time divided by metres completed. An undersized compressor saves fuel per hour but drills slowly, regrinds cuttings and wears bits; a well-matched one finishes the hole sooner and cheaper. Reliability starts before start-up: correct oil, clean filters, checked hoses and a pre-season inspection.
How Reddy Compressors helps
We sell, hire and service borewell and DTH compressors, supply single-screw and twin-screw units, boosters and spares, and size the air for your hole diameter, pipe and depth before you buy.
Reddy Compressors has worked from Secunderabad since 2002 as an independent, multi-brand supplier: sales of new, used and refurbished compressors, hire from our own fleet of 50 to 2,000 cfm, service by our own engineers for machines above 10 hp, and spare parts matched to the nameplate. We cover Hyderabad, the whole of Telangana and Andhra Pradesh and districts within about 300 km, and supply across India. Call or WhatsApp +91 99590 60718, open 7 days, 8:30 am to 8:30 pm.
Frequently asked questions
What pressure does a borewell compressor need?
Most borewell DTH drilling in Telangana and Andhra Pradesh runs at 13.8–27.6 bar (200.2–400.3 psig). Deep holes with heavy water may need special units up to 35 bar (507.6 psig) or a booster.
How much cfm do I need for a 6½-inch borewell?
With 4½-inch drill pipe, a 6½-inch hole at 500 cfm gives about 4,170 ft/min uphole velocity, which cleans well in dry rock. Larger holes, wet ground and deeper drilling need more air; send us the hole size, pipe and depth.
Why does the drill slow down when water is struck?
Standing water in the hole adds back-pressure, about 3 bar for every 100 ft of water, and turns dry cuttings into a heavier slurry. The hammer receives less effective pressure and the air must lift water as well as cuttings.
Is a single-screw or twin-screw compressor better for DTH?
Both are used successfully. The choice depends on pressure, flow, fuel use, service support and parts availability for the model; our single-screw versus twin-screw guide compares them in detail.
Does the video have narration?
No. It is a silent slide-by-slide explainer; each slide shows for about five seconds, and the chapter list on this page lets you jump to any topic.
Related pages
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 24 November 2026. How our engineering content is reviewed.