COMPRESSOR RELOCATION, DECOMMISSIONING, REINSTALLATION & RECOMMISSIONING ENGINEERING
It requires baseline photographs/nameplates/settings/connections/condition/fluids/faults before dismantling; manufacturer lifting points, suitable lifting planning, contamination protection and transport restraints; new-site review of foundation/skid, ventilation, cooling, electrical supply, drainage, piping loads and service clearances; and recommissioning verification of rotation, leaks, controls, protection, temperatures, pressure and dryer/auxiliary operation. These controls are expanded without assuming the old installation can be copied at the new site.
Provisional new-series slug: /compressed-air-engineering/relocation-decommissioning-reinstallation-recommissioning/ | CTA: Plan My Compressor Relocation
The compressor may be the same machine. the installation is not the same installation
A machine that operated acceptably in one room can perform poorly or unsafely elsewhere if ventilation, electrical supply, piping, cooling, drainage, foundation, access or controls change.
The relocation record must preserve the old state before disconnection so that the new installation can distinguish pre-existing defects from transport or reinstallation effects. Exact lifting points, centre of gravity, transport restraints, foundation loads, electrical protection, pipe loads, ventilation duty and commissioning acceptance criteria remain equipment/project specific.
1 — Project Identity
Relocation Governance: govern project identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
2 — Asset Identity
Relocation Governance: govern asset identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
3 — Make/Model/Serial
Relocation Governance: govern make/model/serial as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
4 — Airend Identity
Relocation Governance: govern airend identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
5 — Controller Identity
Relocation Governance: govern controller identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
6 — Motor/Engine Identity
Relocation Governance: govern motor/engine identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
7 — Dryer/Auxiliary Identity
Relocation Governance: govern dryer/auxiliary identity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
8 — Old Site
Relocation Governance: govern old site as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
9 — New Site
Relocation Governance: govern new site as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
10 — Scope Owner
Relocation Governance: govern scope owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
11 — Technical Owner
Relocation Governance: govern technical owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
12 — Operations Owner
Relocation Governance: govern operations owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
13 — Lifting Owner
Relocation Governance: govern lifting owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
14 — Commissioning Owner
Relocation Governance: govern commissioning owner as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
15 — Revision Control
Relocation Governance: govern revision control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
16 — Nameplate Photo
Pre-Relocation Baseline: govern nameplate photo as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
17 — Overall Photos
Pre-Relocation Baseline: govern overall photos as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
18 — Connection Photos
Pre-Relocation Baseline: govern connection photos as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
19 — Controller Settings
Pre-Relocation Baseline: govern controller settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
20 — Vfd Settings
Pre-Relocation Baseline: govern VFD settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
21 — Sequencer Settings
Pre-Relocation Baseline: govern sequencer settings as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
22 — Operating Hours
Pre-Relocation Baseline: govern operating hours as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
23 — Fault History
Pre-Relocation Baseline: govern fault history as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
24 — Service History
Pre-Relocation Baseline: govern service history as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
25 — Fluid Levels
Pre-Relocation Baseline: govern fluid levels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
26 — Leak Condition
Pre-Relocation Baseline: govern leak condition as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
27 — Pressure Baseline
Pre-Relocation Baseline: govern pressure baseline as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
28 — Temperature Baseline
Pre-Relocation Baseline: govern temperature baseline as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
29 — Vibration/Noise Boundary
Pre-Relocation Baseline: govern vibration/noise boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
30 — Known Defects
Pre-Relocation Baseline: govern known defects as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
31 — Shutdown Window
Decommissioning Planning: govern shutdown window as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
32 — Critical-Air Dependency
Decommissioning Planning: govern critical-air dependency as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
33 — Standby/Temporary Air Boundary
Decommissioning Planning: govern standby/temporary air boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
34 — Production Clearance
Decommissioning Planning: govern production clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
35 — Electrical Isolation
Decommissioning Planning: govern electrical isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
36 — Pneumatic Isolation
Decommissioning Planning: govern pneumatic isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
37 — Stored Pressure
Decommissioning Planning: govern stored pressure as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
38 — Cooling-Water Isolation
Decommissioning Planning: govern cooling-water isolation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
39 — Condensate Drainage
Decommissioning Planning: govern condensate drainage as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
40 — Fluid Handling
Decommissioning Planning: govern fluid handling as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
41 — Control/Network Disconnection
Decommissioning Planning: govern control/network disconnection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
42 — Pipe Disconnection
Decommissioning Planning: govern pipe disconnection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
43 — Label/Tag Plan
Decommissioning Planning: govern label/tag plan as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
44 — Open-Port Protection
Decommissioning Planning: govern open-port protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
45 — Decommission Signoff
Decommissioning Planning: govern decommission signoff as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
46 — Electrical Cable Identification
Disconnection & Preservation: govern electrical cable identification as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
47 — Control Wiring Identification
Disconnection & Preservation: govern control wiring identification as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
48 — Communication Cable
Disconnection & Preservation: govern communication cable as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
49 — Air Piping
Disconnection & Preservation: govern air piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
50 — Cooling Piping
Disconnection & Preservation: govern cooling piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
51 — Drain Piping
Disconnection & Preservation: govern drain piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
52 — Fuel Boundary
Disconnection & Preservation: govern fuel boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
53 — Flexible Connectors
Disconnection & Preservation: govern flexible connectors as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
54 — Sensor Lines
Disconnection & Preservation: govern sensor lines as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
55 — Open-Port Blanking
Disconnection & Preservation: govern open-port blanking as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
56 — Fluid Containment
Disconnection & Preservation: govern fluid containment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
57 — Desiccant/Treatment Boundary
Disconnection & Preservation: govern desiccant/treatment boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
58 — Loose-Part Control
Disconnection & Preservation: govern loose-part control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
59 — Removed-Part Inventory
Disconnection & Preservation: govern removed-part inventory as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
60 — Configuration Archive
Disconnection & Preservation: govern configuration archive as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
61 — Manufacturer Lifting Points
Lifting Engineering: govern manufacturer lifting points as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
62 — Machine Mass
Lifting Engineering: govern machine mass as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
63 — Centre-Of-Gravity Boundary
Lifting Engineering: govern centre-of-gravity boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
64 — Lifting Frame Boundary
Lifting Engineering: govern lifting frame boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
65 — Crane/Hoist Capacity
Lifting Engineering: govern crane/hoist capacity as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
66 — Slings/Shackles Boundary
Lifting Engineering: govern slings/shackles boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
67 — Lift Path
Lifting Engineering: govern lift path as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
68 — Overhead Clearance
Lifting Engineering: govern overhead clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
69 — Floor Loading Boundary
Lifting Engineering: govern floor loading boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
70 — Rigging Plan
Lifting Engineering: govern rigging plan as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
71 — Tagline/Control Boundary
Lifting Engineering: govern tagline/control boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
72 — Lift Exclusion Zone
Lifting Engineering: govern lift exclusion zone as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
73 — Competent Lifting Team
Lifting Engineering: govern competent lifting team as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
74 — Weather Boundary
Lifting Engineering: govern weather boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
75 — Lift Record
Lifting Engineering: govern lift record as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
76 — Transport Vehicle
Transport Engineering: govern transport vehicle as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
77 — Machine Restraint
Transport Engineering: govern machine restraint as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
78 — Tie-Down Points
Transport Engineering: govern tie-down points as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
79 — Shock/Vibration Boundary
Transport Engineering: govern shock/vibration boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
80 — Weather Protection
Transport Engineering: govern weather protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
81 — Dust/Water Protection
Transport Engineering: govern dust/water protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
82 — Openings Protected
Transport Engineering: govern openings protected as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
83 — Fluid Transport Boundary
Transport Engineering: govern fluid transport boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
84 — Component Support
Transport Engineering: govern component support as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
85 — Controller/Electrical Protection
Transport Engineering: govern controller/electrical protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
86 — Route Clearance
Transport Engineering: govern route clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
87 — Loading/Unloading
Transport Engineering: govern loading/unloading as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
88 — Transport Inspection
Transport Engineering: govern transport inspection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
89 — Damage Record
Transport Engineering: govern damage record as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
90 — Arrival Acceptance
Transport Engineering: govern arrival acceptance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
91 — Foundation/Skid
New-Site Engineering: govern foundation/skid as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
92 — Floor Condition
New-Site Engineering: govern floor condition as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
93 — Level Boundary
New-Site Engineering: govern level boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
94 — Service Clearance
New-Site Engineering: govern service clearance as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
95 — Ventilation
New-Site Engineering: govern ventilation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
96 — Hot-Air Exhaust
New-Site Engineering: govern hot-air exhaust as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
97 — Intake Air
New-Site Engineering: govern intake air as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
98 — Cooling Water
New-Site Engineering: govern cooling water as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
99 — Electrical Supply
New-Site Engineering: govern electrical supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
100 — Earthing Boundary
New-Site Engineering: govern earthing boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
101 — Drainage
New-Site Engineering: govern drainage as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
102 — Condensate Treatment
New-Site Engineering: govern condensate treatment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
103 — Compressed-Air Piping
New-Site Engineering: govern compressed-air piping as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
104 — Piping Loads
New-Site Engineering: govern piping loads as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
105 — Future Maintainability
New-Site Engineering: govern future maintainability as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
106 — Machine Placement
Mechanical Reinstallation: govern machine placement as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
107 — Levelling Boundary
Mechanical Reinstallation: govern levelling boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
108 — Anchoring
Mechanical Reinstallation: govern anchoring as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
109 — Vibration Mounts
Mechanical Reinstallation: govern vibration mounts as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
110 — Pipe Alignment
Mechanical Reinstallation: govern pipe alignment as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
111 — Flexible Connector
Mechanical Reinstallation: govern flexible connector as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
112 — Pipe Strain
Mechanical Reinstallation: govern pipe strain as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
113 — Cooling-Water Connections
Mechanical Reinstallation: govern cooling-water connections as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
114 — Drain Connections
Mechanical Reinstallation: govern drain connections as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
115 — Air Outlet
Mechanical Reinstallation: govern air outlet as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
116 — Intake Duct Boundary
Mechanical Reinstallation: govern intake duct boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
117 — Guards/Panels
Mechanical Reinstallation: govern guards/panels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
118 — Service Access
Mechanical Reinstallation: govern service access as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
119 — Alignment Recheck
Mechanical Reinstallation: govern alignment recheck as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
120 — Mechanical Completion
Mechanical Reinstallation: govern mechanical completion as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
121 — Incoming Supply
Electrical Controls Reinstallation: govern incoming supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
122 — Protection
Electrical Controls Reinstallation: govern protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
123 — Cable Size Boundary
Electrical Controls Reinstallation: govern cable size boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
124 — Phase Sequence
Electrical Controls Reinstallation: govern phase sequence as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
125 — Motor Connection
Electrical Controls Reinstallation: govern motor connection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
126 — Earthing
Electrical Controls Reinstallation: govern earthing as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
127 — Controller Supply
Electrical Controls Reinstallation: govern controller supply as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
128 — Vfd Connection
Electrical Controls Reinstallation: govern VFD connection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
129 — Sensor Wiring
Electrical Controls Reinstallation: govern sensor wiring as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
130 — I/O
Electrical Controls Reinstallation: govern I/O as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
131 — Communications
Electrical Controls Reinstallation: govern communications as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
132 — Remote Start Boundary
Electrical Controls Reinstallation: govern remote start boundary as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
133 — Sequencer Integration
Electrical Controls Reinstallation: govern sequencer integration as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
134 — Configuration Restore
Electrical Controls Reinstallation: govern configuration restore as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
135 — Electrical Completion
Electrical Controls Reinstallation: govern electrical completion as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
136 — Pre-Start Inspection
Recommissioning & Handover: govern pre-start inspection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
137 — Rotation
Recommissioning & Handover: govern rotation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
138 — Fluid Levels
Recommissioning & Handover: govern fluid levels as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
139 — Valve Lineup
Recommissioning & Handover: govern valve lineup as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
140 — Leak Check
Recommissioning & Handover: govern leak check as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
141 — Start/Stop
Recommissioning & Handover: govern start/stop as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
142 — Load/Unload
Recommissioning & Handover: govern load/unload as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
143 — Vsd Response
Recommissioning & Handover: govern VSD response as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
144 — Pressure Control
Recommissioning & Handover: govern pressure control as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
145 — Temperature
Recommissioning & Handover: govern temperature as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
146 — Vibration/Noise
Recommissioning & Handover: govern vibration/noise as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
147 — Dryer/Auxiliary Operation
Recommissioning & Handover: govern dryer/auxiliary operation as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
148 — Alarms/Protection
Recommissioning & Handover: govern alarms/protection as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
149 — Representative-Load Test
Recommissioning & Handover: govern representative-load test as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
150 — Handover
Recommissioning & Handover: govern handover as a relocation-specific engineering control. Record old-site baseline, exact asset/configuration, applicable manufacturer/project data, isolation, lifting/transport evidence, new-site condition, installation result, recommissioning test and unresolved limitation. Do not assume that previous cable, pipe, foundation, ventilation, cooling, drain, protection or control arrangements remain suitable at the new location. Where lifting, electrical, pressure-system or structural work requires specialist competence, use the applicable authorised discipline.
151 — Premium Relocation Control Register
Field | Controlled record | Purpose |
|---|---|---|
Project | ID/old-new site/date | Traceability |
Asset | Make/model/serial/tag | Identity |
Baseline | Photos/settings/condition | Pre-existing state |
Isolation | Electrical/pneumatic/utilities | Safety |
Disconnections | Tagged/recorded | Recovery |
Lifting | Points/plan/equipment | Handling |
Transport | Restraint/protection/inspection | Preservation |
New site | Foundation/vent/cooling/electrical | Suitability |
Piping/drainage | Connections/load/route | Integration |
Controls | Settings/I-O/comms | Configuration |
Mechanical completion | Placement/alignment/guards | Readiness |
Electrical completion | Supply/protection/rotation | Readiness |
Recommissioning | Pressure/temp/control/auxiliaries | Verification |
Open defects | Risk/follow-up | Transparency |
Revision | Reviewer/date | History |
152 — Relocation Risk Matrix
Risk / condition | Engineering question | Controlled response |
|---|---|---|
Old machine worked well | Does new site reproduce required utilities/environment? | Re-engineer new site; do not assume equivalence |
No baseline photos/settings | Can original configuration be reconstructed? | Hold critical disconnects until evidence captured |
Unknown lifting points | Is manufacturer lifting data available? | Do not improvise; obtain competent lift data |
Transport shock/damage suspected | What changed from baseline? | Arrival inspection before installation |
New room runs hotter | Ventilation/recirculation/heat load adequate? | |
New pressure poor | Piping/treatment/demand changed? | Dynamic pressure mapping |
Motor direction wrong | Phase/rotation verification completed? | Controlled electrical correction |
VFD/controller settings lost | Known-good backup available? | Restore only authorised configuration |
Pipe does not align naturally | Pipe strain being imposed? | Rework piping; do not force machine nozzles |
Dryer quality poor after move | Duty/drain/bypass/sensor/configuration? |
153 — Relocation Is an Engineering Change
The new site can alter ventilation, piping, electrical, cooling and operating conditions even when the machine itself is unchanged.
154 — Baseline Before Disconnecting
Photographs, nameplates, settings, connections, condition, fluids and faults preserve the evidence needed to distinguish pre-existing condition from relocation effects.
155 — Lifting Points Are Not Guesswork
Use manufacturer lifting points and a suitable lifting plan. Package panels, piping or arbitrary structural members are not automatically approved lifting points.
156 — Transport Is a Preservation Phase
Protect the machine from contamination, weather, shock, loose components and uncontrolled movement; inspect against the pre-move baseline on arrival.
158 — Technical / Relocation Verification Gate
Verify baseline, isolation, lifting, transport, new-site engineering, mechanical/electrical completion and recommissioning. No 'same installation elsewhere' assumption is permitted.
160 — AEO / Engineering FAQ Layer
Answer what should be recorded before relocation, how compressors are decommissioned/lifted/transported, what must be re-engineered at the new site and why recommissioning is more than reconnecting.