Why multiple compressors need a sequencer
Without central control, each compressor works on its own pressure settings. To stop them all loading together, installers “stack” the settings: machine one loads at 6.5 bar and unloads at 7.5 bar, machine two at 6.2 and 7.2 bar, machine three at 5.9 and 6.9 bar, and so on. The result is a wide overall pressure range, high average pressure, and a lead machine that may unload while a lag machine is still loaded. Every extra bar of average pressure needs about 7% more power, and unloaded machines burn energy without making air.
A sequencer replaces that stack with a single decision-maker. It reads one header pressure transmitter, compares demand against the capacity of the machines available, and switches machines in and out so that only the necessary number run, with at most one partly loaded.
How a sequencer works
- One pressure reference. A transmitter in the main header, usually after the dryers and receiver, gives the sequencer the system pressure.
- A single pressure band. The sequencer holds pressure between a lower and upper limit, typically much narrower than a stacked arrangement allows.
- A running order. Machines are ranked lead, lag one, lag two and so on, either by a fixed priority or by rotation.
- Load and unload decisions. When pressure falls and stays below the lower limit, the next machine is loaded or started; when it rises above the upper limit, the last machine in is unloaded, and stopped after its run-on time.
- Time delays. Delays between steps prevent the sequencer from reacting to brief pressure dips and starting machines unnecessarily.
- Rotation. At a set interval, or on running hours, the order changes so that wear is spread across identical machines.
- Fallback. On loss of the sequencer or its signal, each machine reverts to its own local pressure settings.
Types of sequencing
| Method | How it works | Best suited to | Limitations |
|---|---|---|---|
| Cascade pressure settings | Each machine has stepped load/unload settings; no central device | Two small machines with simple duty/standby | Wide band, high average pressure, no rotation |
| Simple timed rotation | Duty changes on a timer; machines still use own pressure switches | Duty/standby pairs needing even wear | Does not reduce overlap or pressure band |
| Central pressure-band sequencer | One header transmitter; machines loaded and unloaded in order | Most stations of two to six fixed-speed machines | Order is fixed by rule, not by best combination |
| Capacity-based or master sequencing | Selects the best combination of machines for measured demand, including VSD trim | Larger or mixed-size, mixed-drive stations | Needs good data, configuration and commissioning |
For a larger station with different sized machines, dryers and storage to coordinate, see our page on master compressor control.
An illustrative example: three machines, before and after
Consider a hypothetical station with three similar fixed-speed screw compressors on a stacked cascade. The lead machine works between 6.8 and 7.8 bar, the second between 6.5 and 7.5 bar and the third between 6.2 and 7.2 bar. The plant’s critical user needs 6.0 bar at the point of use, and there is a measured 0.4 bar drop from the compressor room to that user.
On a cascade, the header can sit anywhere from 6.2–7.8 bar depending on which machines happen to be loaded, and during moderate demand the second and third machines may both run partly loaded, each spending time unloaded. Average generation pressure is high because the lead machine carries the top of the stack.
With a sequencer reading one header transmitter, the band could, for example, be set at about 6.5–7.0 bar: still above the 6.4 bar needed at the header to deliver 6.0 bar at the user. Only the machines needed run, the last one in carries the variation, and duty rotates weekly. The local cascade settings remain in place, set just outside the sequencer band, as a fallback. The actual band chosen on a real site would come from logged data, and the result would be confirmed by logging pressure and power again after commissioning, not assumed.
Setting the pressure band
The band is the heart of a sequencer design. Set it too narrow and machines start and stop too often; set it too wide and the energy benefit is lost.
- Start from the minimum pressure needed at the most demanding point of use, not at the compressor.
- Add the measured pressure drop from the header transmitter to that point, through filters, dryers and piping.
- Allow for how quickly pressure falls when a large user starts, which depends on storage volume.
- Check each compressor’s own maximum pressure so that the local fallback settings, placed just outside the sequencer band, stay within the machine’s rating and act as a backstop.
- Review the band after logging real behaviour, and tighten it in steps if pressure is stable.
Storage plays a big part. A properly sized and located receiver slows the rate of pressure change, giving the sequencer time to bring in the next machine without pressure dipping below the minimum. Our receiver sizing page explains the method.
Where should the VSD sit in the sequence?
A variable-speed compressor is normally the trim machine: fixed-speed machines carry the steady base load fully loaded, and the VSD absorbs fluctuations. For this to work, the VSD’s capacity range needs to cover the size of the step when a fixed-speed machine is added or removed. If it does not, there is a “control gap” where the VSD runs at maximum or minimum and a fixed-speed machine cycles. The VSD’s target pressure must also sit within the sequencer’s band, not compete against it. Our base/trim strategy page covers trim sizing in detail.
Signs your sequencer is not working well
- Pressure still swings widely, or the band has been widened over time “because of complaints”.
- Machines start and stop many times an hour.
- One machine has far more running hours than its identical partner.
- The sequencer has been switched off or set to manual and machines run on local settings.
- A machine shows “remote” but does not respond, so the sequencer brings in the next one.
- The header transmitter reads differently from local gauges.
Commissioning and fail-safe behaviour
A sequencer must make the station more reliable, not less. During commissioning we test what happens when the sequencer loses power, when its pressure transmitter fails, when a machine trips while it is lead, and when communication to one machine is lost. In every case the station should keep supplying air: either by the sequencer skipping the faulty machine, or by machines falling back to local pressure settings set slightly below and above the sequencer band. These settings are recorded and left with the site.
Critical sites, such as pharmaceutical plants and continuous process industries, also need an agreed standby philosophy. A sequencer can rotate a standby machine into duty regularly so that it is proven, rather than discovering a fault only during an emergency.
How Reddy Compressors helps
Reddy Compressors is an independent multi-brand compressed-air specialist at Tarnaka, Secunderabad, serving industry since 2002. We sell, rent and service ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Sullair, Doosan, Kirloskar, Gardner Denver and other machines, without being an authorised dealer of any brand. That matters on mixed fleets, where a sequencer must work with several controllers.
- Check each machine’s controller for remote start/stop and load capability and the interface it needs.
- Log header pressure and running pattern to set a realistic band, through our pressure profiling work.
- Advise on a suitable sequencer, whether a manufacturer’s unit or a vendor-neutral one, and on storage and transmitter location.
- Commission sequencing with your engineer, test fallback modes and record settings.
- Service the compressors under the sequencer through regular visits or AMC, across Telangana and Andhra Pradesh.
What to send us
- List of compressors with make, model, serial, rated flow and pressure, and drive type.
- Photos of each controller and its current load/unload settings.
- Receiver sizes and positions, and a simple sketch of the compressor room.
- Minimum pressure needed by your critical users.
- Running pattern by shift and any existing sequencer details.
Frequently asked questions
What is the difference between a sequencer and a master controller?
A sequencer mainly decides which compressors run, in what order, to hold a pressure band, and rotates duty. A master controller usually goes further: it chooses the best combination of differently sized machines for the measured demand, coordinates a VSD trim, and may include dryers, storage and energy data. On small stations a sequencer is often enough; larger mixed fleets benefit from master control.
How narrow can the pressure band be with a sequencer?
Narrower than a stacked cascade, but the right figure depends on storage, machine response, demand swings and pressure drop. Many stations can run a band well under 1 bar once sequenced. We set the band from logged data, test it under real production, then tighten it gradually. The goal is the lowest stable pressure that still meets the most demanding user.
Will a sequencer work with compressors of different brands?
In most cases yes. Vendor-neutral sequencers commonly control machines through volt-free contacts for remote start/stop and load/unload, which most controllers provide. Some brands also allow communication links. We check each controller first; a very old machine may need a small modification or can be left as a manually started standby.
Why does my compressor sequencer start machines too often?
Common reasons are a pressure band that is too tight for the storage available, step delays set too short, a header transmitter placed where it sees sharp local dips, or a trim machine too small to cover the gap between fixed-speed machines. Logging pressure alongside machine states usually shows which one it is, and the fix is often in settings rather than hardware.
What happens to air supply if the sequencer fails?
A correctly commissioned system keeps running. Each compressor’s local pressure settings are left as a backstop, set just outside the sequencer band, so machines revert to local control on loss of signal. This should be tested during commissioning and after any change, and the fallback settings written down for your maintenance team.
Is a sequencer worth it for a small plant?
If two or more machines regularly run together, or pressure is set high to cover poor coordination, sequencing usually brings a clear benefit through lower pressure and less unloaded running. If one machine meets demand and the other is standby, simple duty rotation may be enough. Logging a week of pressure and running data answers the question with evidence.
Related pages
Field guide
Sequencers: Making several compressors behave as one
Where two or more compressors feed the same system, each machine’s own pressure switch tends to fight the others: several run part-loaded at once, pressure swings and energy is wasted. A sequencer decides which machines run, in what order, and holds the whole system in a single pressure band.
What a sequencer does
- Starts only as many machines as demand needs, in a set or rotating order.
- Keeps one machine (often a VSD) trimming while the others run fully loaded or stopped.
- Equalises running hours by rotating the lead machine.
- Brings in a standby automatically if a running machine trips.
- Lowers the overall pressure band, because machines no longer need staggered settings.
Signs a site needs one
- Two or more compressors often running unloaded at the same time.
- Pressure swinging widely through the day.
- Machines’ pressure settings staggered by a bar or more to stop them fighting.
- One machine with far more hours than the others.
Before fitting
Measure demand over a typical week, check each compressor’s controller can accept remote load and start signals, and make sure the receiver volume and pipework let the sequencer see a stable system pressure. A sequencer cannot fix a pressure drop in the pipework; it only controls the machines.
What to send for a quotation
- Make, model and serial number of every compressor and dryer in the station.
- Running hours and a typical week of operation (shifts, weekends).
- Current pressure settings and controller type on each machine.
- Any alarm or fault history you have.
Send it through the engineering consultation enquiry or the audit and measurement enquiry, or call +91 99590 60718 or +91 92468 88812.
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.
Pressure budget and the cost of excess pressure
Add up the pressure that is lost between the compressor and the point of use, and see what a lower set point would be worth.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Pressure needed at the point of use (bar g): 6
- Dryer and filter loss (bar): 0.5
- Piping loss (bar): 0.3
- Hose, fittings and regulator loss (bar): 0.3
- Control band and safety margin (bar): 0.3
- Current compressor set point (bar g): 8
- Compressor input power (kW): 75
- Saving per bar reduced (%): 7
- Running hours per year: 6,000
Result
- Total pressure losses: 1.1 bar
- Control band and safety margin: 0.3 bar
- Compressor pressure needed: 7.4 bar g (point of use + losses + band and margin)
- Possible reduction from current set point: 0.6 bar
- Indicative energy saving: 18,900 kWh per year
- Indicative cost saving: Enter your electricity tariff (cost per kWh) above
Method. Required compressor pressure = point-of-use pressure + sum of losses. Savings = power × (reduction in bar) × saving per bar. A saving of roughly 6–8% of compressor power per bar of pressure is commonly quoted; it is indicative and varies with machine type and control, so edit it to suit.
What to take from it. The saving is real only if the farthest and most demanding point still works at the lower set point. Prove it before you change the setting.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.