All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Engineering tools

Air quality sampling plan builder

10 min read12 sections

Jump to the calculator ↓

What does an air quality sampling plan actually decide?

Most requests for an “air quality test” are really requests for a decision: can this air touch the product, can this line be released after a dryer change, or does this site meet the class written in a customer specification? A sampling plan works backwards from that decision. It lists the requirement, the contaminant that requirement covers, the point that represents the use, and the method that can actually measure it.

The planner on this page helps you build that record line by line. It does not choose a purity class for you and it does not replace the laboratory or instrument supplier’s procedure. What it does is keep the logic visible, so that a missing sample is shown as missing rather than quietly treated as a pass.

Three principles run through every plan:

  • Sample where the air is used, or at a point you can prove is equivalent. A good dryer-outlet result does not prove the condition after a receiver, a long branch, a flexible hose or a quick coupling.
  • Match the method to the contaminant. A dew-point reading answers a moisture question only. It says nothing about particles, oil or micro-organisms.
  • Separate “sampled” from “accepted”. An invalid sample is not proof that the air failed, and an uncollected sample is never a pass.

Start with the requirement, not the instrument

Write one requirement line for each thing the air must achieve. A pharmaceutical tablet press, a food-contact blow-off nozzle and a paint booth on the same site can carry quite different requirements, even when one compressor house feeds all three.

A complete requirement line records:

  • The use point and process (for example, “Granulation room 2, fluid-bed dryer purge”).
  • Whether the air contacts product directly, indirectly or not at all.
  • The specified class or limit for each contaminant, written in ISO 8573-1 notation as particles.water.oil, for example Class 1.4.1, or as a numerical limit from the customer or regulator.
  • The edition of ISO 8573-1 being referenced, because class boundaries have changed between editions.
  • The reason for testing: commissioning, routine verification, after a change, after an excursion, or customer audit.
  • The person who owns the decision and the person who will review the data.

If a requirement cannot be stated, the plan should record that as an open item. Sampling against an undefined target produces numbers that nobody can act on.

ISO 8573 contaminants and matching methods

ISO 8573-1 sets the purity classes; the other parts of ISO 8573 describe how each contaminant is measured. A plan should name the part being followed for each line. The table below summarises the usual pairing used in industry.

ContaminantTypical method referenceWhat it tells youCommon planning mistake
Solid particles by countISO 8573-4 (laser particle counter)Particle number per m³ in defined size bandsSampling through a long, dirty hose or without isokinetic consideration
Particle mass concentrationISO 8573-8mg/m³ for classes based on massUsing a count result to claim a mass class
Water vapour (pressure dew point)ISO 8573-3 (dew-point sensor at line pressure)PDP in °C at the measured pressureReading at atmospheric pressure and reporting it as PDP
Liquid waterISO 8573-9Liquid water content after condensationAssuming a good PDP rules out slugs of liquid after a drain failure
Oil aerosol and liquid oilISO 8573-2Aerosol and liquid fraction in mg/m³Reporting this alone as “total oil”
Oil vapourISO 8573-5Hydrocarbon vapour fraction in mg/m³Omitting it on oil-injected systems with carbon filtration
Viable micro-organismsISO 8573-7Colony-forming units per volumeTreating it as a routine engineering test without a specialist laboratory

For oil, the total that ISO 8573-1 classes refer to includes aerosol, liquid and vapour. A plan that measures only aerosol cannot support a Class 1 or Class 0 oil statement. Class 0 is not “zero”; it is a limit agreed between supplier and user that must be tighter than Class 1, and the plan should record exactly what was agreed.

How do you choose the right sampling points?

Choose points by following the air path, not by finding the easiest valve. Walk the route from compressor discharge through aftercooler, receiver, dryer, filters, header, branch, drop leg and final hose to the use point. At each change that can add or remove contamination, ask whether a result here would change a decision.

  1. Mark the point of use or the last point before product contact. This is the point the requirement applies to.
  2. Mark the treatment outlet (after the final filter or dryer). A result here shows what the treatment delivers, before distribution adds its own contribution.
  3. Mark any intermediate point where distribution can add contamination: old galvanised or black-steel pipework, dead legs, low points without drains, hoses and couplings.
  4. Check that each point has a suitable take-off: from the top or side of the pipe, not from the bottom, with a short, clean, dedicated sampling connection.
  5. Record the pipe material, line pressure and approximate flow at each point, because these affect how representative the sample is.

An upstream pass never releases a downstream point on its own. If the use point is where the requirement applies, the use point must be sampled, or there must be a documented reason why it is equivalent to a point that was.

Operating conditions the samples must represent

Air quality changes with operating state. A plan that samples only on a cool morning at light load may miss the conditions under which a problem actually occurs. Decide which states matter and record which state each sample represents.

  • Peak demand, when dryers and filters see their highest flow and velocity.
  • Highest inlet temperature. In Telangana and Andhra Pradesh, summer compressor-room temperatures well above 40 °C raise dryer inlet temperatures and moisture load.
  • Start-up after a weekend or shutdown, when condensate and debris that settled in the pipework can be swept forward.
  • Standby compressor running, or a rental machine connected during maintenance.
  • Desiccant dryer switchover, when brief dew-point excursions can appear.

Frequency should follow risk and history rather than a borrowed calendar. Event triggers belong in the plan as well: a dryer service, a filter element change, a new compressor, a pipe modification, a drain failure or a product complaint should each prompt a defined re-test at the affected points.

Sampling assembly, flushing and sample volume

The sampling assembly is part of the method. Hoses, adaptors, pressure reducers and fittings can shed particles, hold oil or trap water, and a contaminated assembly produces a false failure. Specify clean, compatible materials, the shortest practical connection and the pressure at which the instrument or collection device operates.

Flushing and stabilisation should be decided by evidence, not by a remembered number of minutes. For a particle counter, flush until successive readings settle; for a dew-point sensor, wait until the reading stops drifting in one direction. Record what stability criterion was used.

Sample volume decides what a result can prove. A particle count is only meaningful in relation to the volume of air sampled. For example, a counter drawing 28.3 litres per minute for 10 minutes samples 0.283 m³. If it counts 1,200 particles in the 0.5–1 µm band, the concentration is about 4,240 particles per m³. Under ISO 8573-1:2010 that sits within the Class 2 limit of 6,000 for that band but above the Class 1 limit of 400. Had only one minute been sampled, a single extra particle would swing the result noticeably, so short runs at tight classes need care.

Worked example: four points, one decision

A tablet-coating line requires Class 1.4.1 at the spray-gun manifold. The plan has four points: dryer outlet, final filter outlet, the header at the coating hall and the manifold itself.

PointParticlesPDPOil (aerosol + vapour)Status
Dryer outletNot requiredMeasured, meets +3 °CNot requiredSupports treatment check only
Final filter outletMeets Class 1MeetsAerosol measured, vapour not measuredOil incomplete
Coating hall headerMeets Class 1MeetsNot sampledOil not covered
Spray-gun manifoldSample invalid (hose shed particles)MeetsNot sampledRequirement not yet demonstrated

Every visit was completed, yet the requirement is not demonstrated. Particles at the manifold need a repeat with a clean assembly, and oil vapour needs measuring at least at the manifold. The planner reports this as “sampling complete, acceptance coverage incomplete”, which is the honest position.

Responding to an adverse or unusable result

Decide in advance what happens when a result fails or cannot be used. That prevents arguments after the fact and stops a single number being re-tested until it passes.

  1. Check validity first: assembly, flushing, sample volume, instrument calibration status and operating state.
  2. If the sample is valid and adverse, quarantine the decision it was meant to support, and inform the process owner.
  3. Sample upstream points to locate where the contamination enters.
  4. Correct the cause: drain, filter element, dryer, pipe section or hose.
  5. Re-sample the original point under the same operating state and record both results.

Our air quality excursion investigation workbook takes over from this step when a failure needs structured root-cause work.

How Reddy Compressors helps

Reddy Compressors has worked with industrial compressed-air systems since 2002 from our office at Tarnaka, Secunderabad, with service teams covering the whole of Telangana and Andhra Pradesh. We are an independent multi-brand specialist working on ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic and other makes, so our view of your treatment train is not tied to one manufacturer.

  • We walk the air path with your team and help mark representative sampling points and take-offs.
  • We check the equipment the results depend on: aftercoolers, drains, refrigerated and desiccant dryers, filter elements and differential pressure.
  • We carry out dew-point checks as part of dryer service and air audits, and coordinate with specialist laboratories where particle, oil or microbiological testing is required.
  • When a result fails, we service or replace the dryer, filters or drains and supply correctly identified spare parts.
  • Where oil-free air is the right answer, we supply, rent and service oil-free compressors of all major brands.

What to send us

  • The required purity class or limits for each use point, and the specification it comes from.
  • A simple line diagram or photos showing compressor, receiver, dryer, filters and main branches.
  • Make, model and nameplate photos of compressors, dryers and filter housings.
  • Any previous test reports or dew-point records.
  • The reason for testing: audit, commissioning, after a change or after a complaint.

Frequently asked questions

Where should compressed air quality samples be taken?

Take samples at the point where the air is used, or at the last point before it touches the product, because that is where the purity requirement applies. Add the treatment outlet and any intermediate point where pipework, hoses or couplings could add contamination. Use a short, clean take-off from the top or side of the pipe. A pass at the dryer outlet does not prove the condition at a distant use point.

How often should compressed air quality be tested?

There is no single universal interval. Frequency should reflect how critical the use is, the history of results and what has changed. Many plants test critical product-contact points at a fixed routine interval and add event-based tests after dryer or filter service, new equipment, pipe modifications, drain failures or product complaints. Record the reasoning in the plan so an auditor can follow it.

What does ISO 8573-1 Class 1.4.1 mean?

The three numbers give the purity class for solid particles, water and oil, in that order. Class 1 for particles sets tight limits on particle counts in defined size bands. Class 4 for water means a pressure dew point of +3 °C or lower, which a refrigerated dryer typically delivers. Class 1 for oil limits total oil, including vapour, to 0.01 mg/m³. Always state the standard’s edition.

Is a dew-point test enough to prove compressed air quality?

No. A pressure dew-point measurement answers only the water-vapour question. It says nothing about particles, oil aerosol, oil vapour or micro-organisms, and it may not reveal liquid water slugs after a failed drain. If your requirement covers several contaminants, the plan needs a suitable method for each one, sampled at the right point and under the right operating condition.

Why did my compressed air test fail when the dryer is working?

The dryer may be fine while contamination enters downstream. Common causes are rusty or dirty pipework, dead legs, low points without drains, contaminated hoses and quick couplings, or a sampling assembly that shed particles. Oil results can fail because of vapour that passes aerosol filters. Check validity first, then sample upstream points to locate the source before replacing equipment.

Do oil-free compressors still need air quality testing?

Yes. An oil-free compressor removes lubricating oil from the compression chamber, but intake air still carries hydrocarbons, dust and moisture, and the distribution system can add particles and water. Dryers and filters remain necessary, and the requirement at the point of use still has to be demonstrated. Testing confirms that the whole system, not only the compressor, meets the class you need.

Calculators and worked examples

These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.

Particle count, sample volume and ISO 8573-1 class

Turn particle-counter counts into concentrations per m³ for the three size bands, find the ISO 8573-1:2010 particle class they support, and see how firmly the sample volume supports it.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Counter sampling flow (L/min): 28.3
  • Active sampling time (min): 10
  • Number of particles counted, 0.1–0.5 µm: 3,000
  • Number of particles counted, 0.5–1 µm: 1,200
  • Number of particles counted, 1–5 µm: 2
  • Required particle class: Class 1
Result
  • Sample volume: 0.283 m³
  • Concentration 0.1–0.5 µm: 10,601 per m³ (within the Class 1 limit)
  • Concentration 0.5–1 µm: 4,240 per m³ (within the Class 2 limit)
  • Concentration 1–5 µm: 7 per m³ (within the Class 1 limit)
  • Particle class supported by this sample: Class 2 ISO 8573-1:2010, all three bands
  • Required class: Class 1 not met by this sample
  • Count the Class 1 limit corresponds to (1–5 µm): 2.8 particles in this volume (counting uncertainty about ±59%)
  • Effect of one particle more or less: 3.53 per m³

Method. Volume (m³) = counter flow (L/min) × sampling time (min) ÷ 1,000. Concentration = count ÷ volume. ISO 8573-1:2010 maximum particles per m³ (0.1–0.5 / 0.5–1 / 1–5 µm): Class 1: 20,000 / 400 / 10; Class 2: 400,000 / 6,000 / 100; Class 3: not specified / 90,000 / 1,000; Class 4: not specified / not specified / 10,000; Class 5: not specified / not specified / 100,000. The class is the lowest number whose limits are all met. Counting uncertainty at the target limit ≈ ±1/√N, where N is the count the limit corresponds to in this volume. Classes 6 and 7 are mass-based (ISO 8573-8) and Class 0 is by agreement; neither is covered here. Check the edition your requirement cites.

What to take from it. A short run at a tight class rests on a handful of particles. Sample enough volume that the limit corresponds to a meaningful count.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.

Acceptance coverage at the use point

Separate “sampled” from “accepted”. For each contaminant in the requirement, record what the use-point result actually shows. The tool reports whether sampling is complete and whether the requirement has been demonstrated, and lists what is still missing.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Number of planned sampling visits: 4
  • Number of sampling visits completed: 4
  • Particles at the use point: Sampled, but the sample is invalid
  • Water (pressure dew point) at the use point: Valid and meets the requirement
  • Oil (aerosol, liquid and vapour) at the use point: Not sampled
Result
  • Sampling: Complete 4 of 4 planned visits
  • Acceptance coverage: Incomplete 1 of 3 required contaminants accepted
  • Disposition: Requirement not yet demonstrated.
  • Still needed: Particles: repeat with a clean, short sampling assembly after checking flushing and volume; Oil: sample it at the use point

Method. Sampling is complete when every planned visit was made. Acceptance needs, for every contaminant in the requirement, a valid and complete result that meets the requirement at the use point (or a documented equivalent point). An invalid sample is not a failure, and an uncollected or incomplete sample is never a pass. One valid adverse result means the requirement is not met.

What to take from it. Every visit can be completed while the requirement is still not demonstrated. Report both, separately.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812