All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Engineering tools

Compressed air units and symbol dictionary

8 min read10 sections

Jump to the calculator ↓

Why a unit alone does not explain a number

Two compressor offers can both say 500 cfm and still describe different amounts of air. One may quote free air delivery (FAD) to ISO 1217 at the inlet, another a displacement figure or a flow at different reference conditions. Two pressure gauges can both read 7 and still disagree by a full bar if one shows gauge pressure and the other absolute. Most expensive misunderstandings in compressed air start with numbers that looked alike but were not.

A complete value carries five things: the quantity, its unit, its reference basis, the point where it applies and the operating state. “500 cfm FAD at 7 bar g discharge, inlet 1 bar a and 20 °C, at full load” can be compared. “500 cfm” cannot.

ElementExampleWhat goes wrong if it is missing
QuantityFree air deliveryDisplacement is mistaken for delivered air
Unitm³/min or cfmConversion errors of a factor of about 35
Reference basisInlet conditions, normal or standardFlows differ by several per cent or more
Point of measurementCompressor discharge, after dryer, at userPressure drop is mistaken for a compressor fault
Operating stateFull load, part load, unloadedPower and flow are compared at different conditions

Pressure terms and units

TermSymbol or unitMeaning
Gauge pressurebar g, psigPressure above local atmospheric pressure; what most plant gauges show
Absolute pressurebar a, psiaPressure above a perfect vacuum; gauge plus atmospheric
Atmospheric pressurePatmAbout 1.013 bar a at sea level, lower at altitude
Differential pressureΔp, mbar or barPressure difference across a filter, dryer, pipe or valve
Working pressurebar gThe pressure the compressor is set to deliver in service
Maximum working pressurebar gThe highest pressure the package is rated for

Key conversions: 1 bar = 100 kPa = 14.5 psi. 7 bar g is 101.5 psig, 10 bar g, 145 psig, 14 bar g, 203.1 psig and 24 bar g, 348.1 psig. All gas-law calculations need absolute pressure. Use the pressure unit and gauge-absolute conversion tool when in doubt.

Airflow terms and units

TermUnitMeaning
Free air delivery (FAD)m³/min, l/s, cfmCompressed air delivered, expressed at the compressor’s inlet conditions; tested to ISO 1217 by makers
Displacementm³/min, cfmSwept volume of the compressing element; always higher than FAD, mainly quoted for piston compressors
Normal flowNm³/min, Nm³/hFlow converted to 0 °C and 1.013 bar a, dry
Standard flowscfm, Sm³/hFlow converted to a stated standard; the standard varies, so it must be named
Actual flowacfm, m³/min at line conditionsVolume flow at the real pressure and temperature in the pipe
Mass flowkg/s, kg/hMass of air per unit time; the same everywhere in a leak-free system

Key conversions: 1 m³/min ≈ 35.3 cfm, 1 l/s ≈ 2.12 cfm, 100 cfm ≈ 2.83 m³/min. At 7 bar g actual flow is roughly one-eighth of FAD. The difference between FAD, normal and standard flow is explained on our page on airflow definitions, FAD and reference conditions.

Common traps with flow figures

  • Comparing a piston compressor’s displacement with a screw compressor’s FAD
  • Reading “scfm” without asking which standard temperature and pressure it uses
  • Using FAD to size pipes, where actual flow is needed
  • Treating a flow-meter reading in Nm³/h as if it were FAD at site inlet conditions
  • Assuming a portable compressor delivers rated FAD at 45 °C ambient without checking the maker’s derating

Temperature and moisture terms

TermUnitMeaning
Ambient temperature°CAir temperature around the compressor; affects cooling and FAD
Discharge temperature°CTemperature at the airend outlet; about 75–95 °C is normal for an oil-injected screw
Absolute temperatureK°C + 273.15; used in all gas-law calculations
Pressure dew point (PDP)°CTemperature at which water condenses at line pressure
Atmospheric dew point°CDew point of the same air expanded to atmospheric pressure; lower than PDP
Relative humidity%Water vapour present as a share of the maximum at that temperature

Typical PDP values are about +3 °C for refrigerated dryers and −20 °C or −40 °C for desiccant dryers. Always say whether a dew point is pressure or atmospheric, because they can differ by many degrees. Air-quality classes are written in the ISO 8573-1 form [particles:water:oil], for example Class 1.4.1.

Power, energy and performance terms

TermUnitMeaning
Motor rated powerkW, hpNameplate output of the motor; not the power drawn
Shaft powerkWPower delivered to the airend shaft
Package input powerkWTotal electrical input including motor losses, fans and integrated dryer
EnergykWhPower multiplied by time
Specific powerkW per m³/minPackage input divided by FAD at a stated pressure; lower is better
Specific energykWh per m³Energy divided by delivered air over a period; includes part-load effects
Power factorPF, no unitRatio of real to apparent electrical power

1 hp ≈ 0.746 kW. Motor rated power is often confused with input; at full load the input is higher than the rated output because of motor losses. When comparing specific power, use the same pressure, reference condition and power boundary for every machine.

Common symbols used in our calculations

SymbolQuantityUsual unit
PPressure (state gauge or absolute)bar, Pa, psi
QVolume flow (state basis)m³/min, m³/s, cfm
ṁMass flowkg/s
TTemperatureK or °C
VVolume (receiver or system)m³, litres
ρDensitykg/m³
vVelocitym/s
DInternal diameterm, mm
rPressure rationone
kRatio of specific heats, about 1.4 for airnone
RGas constant for dry air, about 287J/(kg·K)
cpSpecific heat at constant pressurekJ/(kg·K)

The equations that use these symbols, with their limits, are set out in the compressed air engineering formula register.

Two quick examples

Comparing two offers

Offer A gives 10 m³/min FAD at 7 bar g. Offer B gives 360 cfm at 100 psig. Converting, 360 cfm is about 10.2 m³/min, and 100 psig is 6.9 bar g, so the figures look similar. But if Offer B’s figure is displacement rather than FAD, its delivered air could be noticeably lower. Ask both suppliers for FAD to ISO 1217 at the same pressure and for total package input power.

Reading a service report

A report shows 6.2 at the far end of the plant and 7.0 at the compressor. If both are bar g at the same time, the system loses 0.8 bar between them, which is a piping or treatment problem, not a compressor problem. If one was absolute, the real gap is about 1.8 bar or about 0.2 bar in reverse, which changes the diagnosis entirely. Recording the basis avoids that confusion.

How Reddy Compressors helps

Reddy Compressors, at Tarnaka in Secunderabad, has served industry since 2002 as an independent multi-brand compressed-air specialist. We sell new and used or refurbished compressors from ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic and others, rent from our own fleet of 50–2,000 cfm at 2–30 bar, provide service and AMC, carry out air audits and supply spare parts. We are not an authorised dealer of any brand. We have tie-ups with all major and reputed brands.

When you compare offers, we can put each one onto the same basis so that flow, pressure and power figures are genuinely comparable. Our service reports state the basis of every reading, so a later visit or a second engineer can compare like with like and see a real trend rather than a change of units. Our teams cover the whole of Telangana and Andhra Pradesh, and we supply equipment, rentals and spares across India.

What to send us

  • The offers, data sheets or reports you want compared or explained
  • Nameplate photos of your compressors and dryers
  • The pressure your users need and where it is measured
  • Any logged data with a note of units and timestamps
  • Site ambient temperature range and altitude

Frequently asked questions

What is the difference between bar g and bar a?

Bar g is gauge pressure, measured above local atmospheric pressure, which is what most plant gauges show. Bar a is absolute pressure, measured above a perfect vacuum. At sea level, absolute pressure is gauge pressure plus about 1.013 bar. Gas-law calculations such as receiver sizing and flow conversion must always use absolute pressure, or the results will be wrong.

How do I convert cfm to m³/min?

Divide cfm by about 35.3 to get m³/min, or multiply m³/min by 35.3 to get cfm. For example, 500 cfm is about 14.2 m³/min. The conversion only changes the unit; it does not change the reference basis. Make sure both figures are free air delivery, or both normal or standard flow, before comparing them.

What is the difference between FAD and displacement?

Displacement is the swept volume of the compressing element, calculated from its geometry and speed. Free air delivery is the air actually delivered, measured and expressed at inlet conditions. FAD is always lower because of internal leakage, heating and clearance effects. Piston compressors are often sold on displacement, so check which figure an offer uses before comparing it with a screw compressor.

What does Nm³/h mean in compressed air?

Nm³/h means normal cubic metres per hour: the flow converted to 0 °C and 1.013 bar a, usually dry. Flow meters and process specifications often use it. It is not the same as FAD at your site’s inlet conditions, which are warmer, so a given Nm³/h figure corresponds to a somewhat larger FAD figure in a hot Indian plant.

What is the difference between pressure dew point and atmospheric dew point?

Pressure dew point is the temperature at which water condenses in the compressed air at line pressure. Atmospheric dew point is the dew point of the same air after expanding to atmospheric pressure, which is much lower. Dryer performance should be stated as pressure dew point, for example about +3 °C for refrigerated dryers, so always check which one a figure refers to.

Can you help us compare compressor quotations?

Yes. Send us the quotations or data sheets and we will put flow, pressure and power onto the same basis, point out missing information and explain the real differences. Because we work with many brands and are not an authorised dealer of any, our comparison is neutral. We can also check delivered performance on site in Telangana and Andhra Pradesh.

Calculators and worked examples

These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.

Pressure unit and gauge/absolute conversion

Convert between bar, psi, kPa and MPa and between gauge and absolute pressure. A mix-up between gauge and absolute is a classic cause of wrong sizing.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Pressure: 7
  • Unit: bar g
Result
  • bar gauge: 7
  • bar absolute: 8.01
  • psi gauge: 101.5
  • psi absolute: 116.2
  • kPa gauge: 700
  • MPa gauge: 0.7

Method. Absolute pressure = gauge pressure + atmospheric (1.01325 bar at sea level). 1 bar = 14.504 psi = 100 kPa = 0.1 MPa. Hyderabad is about 540 m above sea level; atmospheric pressure there is roughly 0.95 bar, so enter the local value in the flow tool if it matters.

What to take from it. A 7 bar gauge system is 8.01 bar absolute. Ratio and flow-conversion work uses absolute pressure.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.

Flow and reference-condition conversion

Convert a flow quoted at one set of conditions to another, and between units. Different suppliers quote at different reference conditions, so always compare like with like.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Flow as quoted: 10
  • Unit: m³/min
  • Quoted at pressure (bar a): 1.013
  • Quoted at temperature (°C): 20
  • Convert to pressure (bar a): 1.013
  • Convert to temperature (°C): 0
Result
  • Converted flow: 9.32 m³/min
  • 155.3 L/s
  • 559.1 m³/h
  • 329.1 cfm

Method. Q₂ = Q₁ × (P₁ / P₂) × (T₂ / T₁), with absolute pressure and absolute temperature. Dry-air basis; humidity is ignored. Unit factors: 1 m³/min = 16.667 L/s = 60 m³/h = 35.31 cfm.

What to take from it. A flow quoted at 20 °C and the same air quoted at 0 °C differ by about 7%. Check the reference conditions before comparing two machines.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812