1,500–1,600+ cfm compressors for shutdowns and large temporary air

8 min read13 sections

Jump to the calculator ↓

What does 1,500–1,600+ cfm mean in practice?

This is the top of the portable range and the start of what many plants run in their permanent compressor house. Single diesel portables of this size exist, usually at 7–10 bar (101.5–145 psig) for plant air, and large electric stationary screw compressors cover the same flow. Above roughly 1,600 cfm, most temporary packages are built from two or more machines feeding a common manifold.

FlowApproximate m³/minApproximate m³/h
1,500 cfm42.52,550
1,600 cfm45.32,720
2,000 cfm56.63,400
3,000 cfm (multi-unit)85.05,100

“1,600+” describes large-flow enquiries generally. It is not a promise of unlimited capacity from a single machine: anything above an individual unit’s rating is a multi-unit design and needs its own assessment.

When do plants need temporary air at this scale?

  • Planned shutdowns and overhauls of the main compressors, dryers or air receivers.
  • Breakdown of a large compressor, where production cannot wait for repair.
  • Replacement or relocation of the compressor house.
  • Commissioning of a new plant before permanent air is ready.
  • Peak demand during seasonal production or a short-term contract.
  • Large project duties such as pipeline drying, process vessel purging or extensive blasting.

Industries that commonly need this size of cover include steel, cement, power, glass, textiles, pharmaceuticals, food and process plants. For pharmaceutical and food sites, oil-free temporary air or a suitable treatment train is often required.

Replacement or supplement?

State the role of the temporary machine for each stage. A temporary package may replace capacity that is out of service, or add to permanent compressors that keep running.

  • If a permanent compressor will be isolated, do not count its output while it is isolated.
  • If other permanent units stay in service, record their assessed contribution and check that temporary and permanent machines can run together on one header without hunting or overloading one another.
  • Do not use the total installed nameplate capacity as the requirement. Use measured or documented demand.

Plan the shutdown stage by stage

A stage schedule makes the brief clear and keeps everyone working from the same assumptions. Describe the outcome required at each stage; the plant’s own procedures govern the switching.

StageQuestion for the project teamDecision or evidence needed
Before the outageWhat must be installed and tested before permanent equipment is withdrawn?Readiness and acceptance criteria
Transfer to temporary supplyWhat interruption, if any, can the process accept?Agreed transition arrangement and responsible people
Temporary runningWhich consumers run together, at what pressure and air quality?Flow, pressure, quality and shift pattern
Restart or changed demandIs start-up demand higher than normal running?Stage-specific demand figures
Return to permanent supplyWho confirms the permanent system is ready and releases the temporary package?Completion criteria and authority to release

Use only the stages the job really has. A short compressor replacement may need three; a full compressor-house rebuild may need more.

How do you establish the demand?

  1. Collect logged data where available: flow meter readings, compressor load/unload hours or controller records over representative shifts.
  2. Identify peak and minimum demand, not just the average.
  3. Record the header pressure the plant actually needs at the far end, and the lowest acceptable pressure.
  4. State the air quality, for example the ISO 8573-1 classes for particles, water and oil.
  5. Add consumers that only run during the outage, such as blowing down pipework or testing.
  6. Allow for leakage, which continues during a shutdown unless isolated.
  7. Allow a working margin and consider standby capacity if the process cannot tolerate a trip.

Where no data exists, a short air audit or temporary metering before the outage is usually worth the effort. Guessing large demand from installed capacity tends either to oversize the package or to leave the plant short at start-up.

One large machine or several smaller ones?

ArrangementAdvantagesPoints to consider
Single large unitOne machine, one connection, simpler fuel and operationNo redundancy; one trip stops all temporary air
Two units at about half capacity eachPartial supply continues if one stops; better at part loadManifold and controls needed; more space
N+1 arrangementFull demand met with one unit out of serviceMore equipment on hire; justified where interruption is costly

Critical processes such as instrument air, pharmaceutical production and continuous furnaces usually justify redundancy. Multiple units also follow a changing demand more efficiently than one large machine running lightly loaded.

Connection, treatment and power

  • Tie-in point – a flanged or valved connection on the main header, sized for full flow, ideally prepared before the outage.
  • Manifold – to combine several compressors, with non-return valves on each feed.
  • Treatment – aftercoolers, moisture separators, dryers and filters sized for the full flow. A refrigerated dryer typically gives a pressure dew point around +3 °C; desiccant dryers typically −20 °C or −40 °C.
  • Diesel or electric – diesel needs fuel logistics and storage; electric needs an adequate supply and cabling, or a generator.
  • Placement – level ground, clear cooling air, safe access for refuelling and service, and consideration for noise near offices or neighbours.

Power cost depends on pressure: each extra bar takes about 7% more power, so set the temporary package to the plant’s real requirement rather than the old compressor’s setting if the two differ.

Running the package through the outage

Large temporary packages need daily checks, refuelling, drain checks and clear responsibility for alarms. On round-the-clock hire, operators on 12-hour shifts are common. We service hire machines every 300 running hours, including oil change. Fuel use depends on load, so fuel planning is based on the expected demand profile, not a fixed figure.

Our project experience at this scale includes a temporary power-and-air package for an international oilfield-services contractor at Kakinada, Andhra Pradesh, with six compressors from 750 to 1,100 cfm, generators, distribution boards, operators and a technician, together with erection, commissioning and transport.

Commissioning and acceptance before the switch-over

A temporary package should be proven before the plant depends on it. Agree simple acceptance checks with the plant team in advance, so the decision to withdraw the permanent compressors is based on evidence rather than optimism.

  1. Confirm every hose, manifold and tie-in item is rated above the highest safety valve setting in the package.
  2. Run each compressor loaded and check discharge pressure, temperature and alarms; normal oil-injected screw discharge temperature is about 75–95 °C.
  3. Check header pressure at the far end of the plant with the temporary package carrying the load.
  4. Verify air quality where the process specifies it, for example dew point after the dryer.
  5. Test the response to a single-unit trip if the design includes redundancy.
  6. Record the readings, so the same checks can be repeated if anything changes during the outage.

At the end of the job, the permanent system is restarted and proven under the plant’s own procedure before the temporary package is isolated, depressurised and released. Keep the temporary connection valved and capped if a further outage is likely.

How Reddy Compressors helps

Reddy Compressors is an independent multi-brand specialist at Tarnaka, Secunderabad, serving industry since 2002. We rent from our own fleet of diesel and electric compressors (50–2,000 cfm, 2–30 bar, oil-injected and oil-free), combine units into larger packages, and supply hoses, manifolds, aftercoolers, dryers and operators where needed. We have supplied compressors on breakdown to leading pharmaceutical manufacturers in Hyderabad and Telangana.

We also sell new and used or refurbished machines, and service and supply spares for ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Doosan and other makes; we are not an authorised dealer of any brand. We have tie-ups with all major and reputed brands. Our team of over 20 service engineers and technicians covers all of Telangana and Andhra Pradesh, and we supply rentals across India. Generators for electric packages come from Reddy Generators, under the same management.

What to send us

  • Plant demand data: flow, header pressure and air quality required.
  • Details of the permanent compressors and which will be out of service.
  • Outage dates, duration and the stage plan.
  • Tie-in point, pipe size and available space for the package.
  • Power available, or whether diesel is preferred.
  • Whether operators and round-the-clock support are needed.

Frequently asked questions

Can I hire a 1,600 cfm compressor for a plant shutdown?

Yes. A shutdown package of this size can be one large compressor or several smaller units on a common manifold, diesel or electric, with treatment and operators as needed. Send us the plant demand, header pressure, air quality and outage dates, and we will propose an arrangement with a clear tie-in point and a stage plan.

How do I work out how much temporary air my plant needs?

Use logged data where possible: flow meter readings or compressor load hours over representative shifts. Identify peak and minimum demand, the header pressure needed at the far end and the air quality. Add outage-only consumers and leakage, then allow margin. Installed nameplate capacity is not a reliable measure of real demand.

Is one large compressor or two smaller ones better for temporary air?

Two or more units give partial supply if one stops and follow changing demand more efficiently, but need a manifold and more space. One large machine is simpler but has no redundancy. For critical processes, an N+1 arrangement, where full demand is met with one unit out of service, is often justified.

Can temporary compressors run alongside my existing compressors?

Yes, if the arrangement is reviewed. Pressure settings and controls must be coordinated so machines do not hunt or overload one another, and each feed needs a non-return valve. Only count permanent units that will genuinely stay in service, and record their assessed output rather than their nameplate figure.

Do you supply oil-free temporary air for pharmaceutical plants?

Yes. Our rental fleet includes oil-free machines, and we can add dryers and filters to meet the air quality the plant specifies, for example by ISO 8573-1 class. Tell us the required classes for particles, water and oil, the pressure and the demand, and whether validation or testing is needed before switching over.

How is fuel managed on a large diesel temporary air package?

Fuel use depends on load, pressure setting and how long the machines run unloaded, so we plan logistics from the expected demand profile. The plan covers tank capacity, refuelling frequency, safe access, spill control and who is responsible for supply. Running at the plant’s real pressure, not higher, also reduces fuel use.

Calculators and worked examples

These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.

Air demand duration curve summary

Paste regular flow readings from a log and get the exceedance levels used for sizing (E1, E10, E50, E90), the data coverage, and the hours and air volume above an installed capacity.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Flow readings at a regular interval (m³/min): 6.2, 5.8, 6.0, 6.5, 9.0, 12.5, 14.8, 15.6, 16.2, 15.1, 13.4, 11.0, 12.2, 14.0, 15.4, 17.8, 18.6, 14.2, 11.6, 9.4, 7.8, 6.6
  • Logging interval (minutes): 60
  • Scheduled hours the log should cover (h): 24
  • Installed capacity to compare against (m³/min): 15
Result
  • Valid readings: 22 covering 22 h
  • Coverage: 91.7% of 24 scheduled hours
  • Maximum: 18.6 m³/min
  • E1 (exceeded 1% of the time): 18.6 m³/min
  • E10: 16.2 m³/min
  • E50 (median): 12.5 m³/min
  • E90 (base demand): 6.2 m³/min
  • Minimum: 5.8 m³/min
  • Time-weighted mean demand: 11.8 m³/min
  • Time above 15 m³/min: 6 h = 27.3% of valid hours
  • Air needed above that capacity: 522 m³ of free air in the logged period (peak excess 3.6 m³/min)

Method. Regular-interval mode: every valid reading carries the same time weight (the logging interval), so leave out missing, negative and fault readings rather than entering them as 0 (enter 0 only when the plant was confirmed stopped). Readings are sorted from highest to lowest. Ep = the flow exceeded (reached or exceeded) for at least p% of the valid hours = the k-th highest reading with k = ⌈p × n ÷ 100⌉. Valid hours = n × interval. Coverage = valid hours ÷ scheduled hours × 100. Hours above capacity = number of readings above it × interval; air above capacity = Σ(reading − capacity) × interval. All flows must be on one basis, ideally FAD in m³/min. E1 needs at least 100 readings to differ from the maximum (with fewer, k = 1 for E1); a week at 1-minute or 5-minute logging gives plenty. The 90% coverage warning is our recommended check level. Not included: timestamp import, irregular intervals and gap filling.

What to take from it. Size the base machine near E90, the trim range up to about E10, and treat the short time above that as a storage or rental question, not a reason to buy for the maximum.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.

N+1 capacity and storage ride-through check

Check whether the plant can meet demand with its largest compressor out of service, how much load must be shed if not, and how long the receiver bridges the gap.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Capacity of each compressor at the required pressure (m³/min): 6, 6
  • Normal demand (m³/min): 9
  • Demand that can be shed during an outage (m³/min): 0
  • Receiver volume (m³): 3
  • Normal minimum pressure (bar g): 7
  • Lowest pressure the critical users accept (bar g): 6
Result
  • Total installed capacity: 12 m³/min
  • Capacity with the largest unit out: 6 m³/min
  • Shortfall with the largest unit out: 3 m³/min
  • N+1 on compressors: Not met: 3 m³/min short; shed load or add capacity
  • Usable stored free air: 2.96 m³ (3 m³ × 1 bar ÷ 1.013)
  • Ride-through if all air is lost: 19.7 seconds at 9 m³/min
  • Ride-through with the largest unit out: 59.2 seconds at the 3 m³/min shortfall

Method. Shortfall with the largest unit out = demand − (total capacity − largest unit). Usable stored free air ≈ receiver volume × allowed pressure fall ÷ 1.013 bar (isothermal). Ride-through time = stored free air ÷ the flow not being supplied. Use capacities measured at the required pressure. This checks compressors only: dryers, controls, power and headers need their own N+1 test. Default: the page example (two 6 m³/min machines, 9 m³/min demand, 3 m³ receiver, 7 → 6 bar g).

What to take from it. Two machines are not N+1 unless the remaining ones carry the critical demand. Storage buys seconds for a standby start; it does not replace a missing machine.