Compressed air engineering and total cost of ownership: an 80-second video explained

4 min read8 sections
Total cost of ownership and compressed air engineering explained1:20 · 16 chapters · no spoken audio · Reddy Compressors

Video chapters

  1. Compressed air engineering explained
  2. Why compressed air is the fourth utility
  3. The five pillars of compressed air engineering
  4. Pressure: how much force the air can deliver
  5. Air flow: free air delivery (FAD)
  6. Power: horsepower alone does not define performance
  7. Air quality is production quality
  8. Multi-stage air treatment
  9. The biggest compressor selection mistake
  10. Modern compressors are intelligent machines
  11. Reliability goes beyond the compressor
  12. Where energy is lost
  13. Total cost of ownership
  14. The future of compressed air
  15. Engineering philosophy
  16. The big engineering lesson

The video is silent; each of its 16 slides shows for five seconds. Below, each pillar is explained with the checks we make on a plant survey.

The five pillars

Pillar What to specify Common mistake
Pressure The lowest pressure the most demanding user needs, plus measured system losses Setting 8–10 bar “to be safe” when 6.5 bar would do
Flow (FAD) Measured demand profile in cfm or m³/min, at the compressor outlet Buying by motor kW or by displacement, not by FAD
Power Specific power (kW per m³/min) at the working pressure Comparing machines by horsepower alone
Air quality Dew point, oil and particle classes for each use Treating every user to the highest class, or none
Reliability Standby capacity, service plan, spares One compressor and no back-up for a critical line

Pressure, flow and power

Typical industrial tools and cylinders work at 6–7 bar (87.0–101.5 psig); many plants run at 7–8 bar (101.5–116.0 psig); PET blowing, some testing and special processes need 13–40 bar. Free air delivery is the volume of air at inlet conditions that the compressor actually delivers, and it is the figure to compare between quotations. Two machines with the same motor can deliver different FAD at the same pressure, so compare specific power, not horsepower. As a working rule, every extra 1 bar of generation pressure costs roughly 7 per cent more energy for the same air.

Air quality and treatment

Air leaving any compressor is hot and saturated with water vapour; oil-injected machines also add oil aerosol. Treatment is staged: aftercooler and separator to remove liquid water, a refrigerated or desiccant dryer to reach the required dew point, then particulate and coalescing filters, with condensate drained and treated. Specify air quality per use: general tools need much less treatment than paint lines, food contact or instruments.

The biggest selection mistake and where energy is lost

The biggest mistake shown in the video is buying a compressor from a guess, “we need 1 per cent more than the old one” or “a bigger one is safer”. Oversized fixed-speed machines spend long periods unloaded, still drawing a large share of full-load power. Energy is also lost through leaks, artificial demand from excessive pressure, pressure drop through clogged filters and undersized pipes, open blowing and poor control of several compressors together.

Total cost of ownership

Over a typical ten-year life, electricity is usually the largest cost, followed by maintenance, with the purchase price a smaller share. A worked comparison is easy: a 37 kW compressor loaded 6,000 hours a year at ₹8 per kWh uses about 37 × 6,000 × 8 = ₹17,76,000 of electricity a year before any savings. A 5 per cent efficiency difference is worth about ₹88,800 a year, which quickly outweighs a modest difference in purchase price.

How Reddy Compressors helps

We measure demand, check pressure and specific power, and recommend the compressor, dryer, receiver and piping together rather than a machine alone.

Reddy Compressors has worked from Secunderabad since 2002 as an independent, multi-brand supplier: sales of new, used and refurbished compressors, hire from our own fleet of 50 to 2,000 cfm, service by our own engineers for machines above 10 hp, and spare parts matched to the nameplate. We cover Hyderabad, the whole of Telangana and Andhra Pradesh and districts within about 300 km, and supply across India. Call or WhatsApp +91 99590 60718, open 7 days, 8:30 am to 8:30 pm.

Frequently asked questions

Why is compressed air called the fourth utility?

Because most factories depend on it like electricity, water and gas: tools, cylinders, valves, blowing and process equipment stop without it. Unlike the others, it is usually made on site, so its cost and reliability are in the plant’s own hands.

What is FAD and why does it matter?

Free air delivery is the volume of air, measured at inlet conditions, that a compressor actually delivers at its rated pressure. It is the right figure for sizing and for comparing quotations, rather than motor power or displacement.

How much does 1 bar of extra pressure cost?

As a working rule, about 7 per cent more energy for the same air delivered. Reducing pressure to what users really need is one of the cheapest energy savings available.

Is the purchase price the biggest cost of a compressor?

Usually not. Over ten years, electricity is normally the largest cost, then maintenance; the purchase price is a smaller share for a machine that runs most of the year.

Is there narration in the video?

No, the video is a silent slide sequence; use the chapter list to jump to a topic and pause to read each slide.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 24 November 2026. How our engineering content is reviewed.