Compressors for cryogenic plants: interfaces and selection

9 min read11 sections

Jump to the calculator ↓

Where compressors sit in a cryogenic plant

Air separation units, nitrogen and oxygen liquefiers, LNG and biogas upgrading plants, helium and carbon dioxide recovery systems and cryogenic freezers all rely on compression somewhere. Very few of these compressors actually see cryogenic fluid. The low temperatures are produced inside the cold box, heat exchangers and expansion turbines; the compressors usually work at or near ambient temperature on either side of that cold section.

DutyWhat the compressor handlesTypical machine familiesMain interface concerns
Main air compressor (air separation)Atmospheric air, warm, before purificationMulti-stage or integrally geared centrifugal, large screwInlet filtration, intercooling, discharge temperature into the purifier, surge control
Product or booster compressorWarm nitrogen, oxygen or argon gas after the cold boxReciprocating, centrifugal, diaphragm for high purityGas-specific materials and cleanliness, especially for oxygen
Refrigeration or recycle loopWarm refrigerant or recycled process gasCentrifugal, screw, reciprocatingClosed-loop inventory, seal leakage, cold-start behaviour
Boil-off gas (BOG) recoveryVapour from storage, may arrive very cold unless warmed firstSpecialist reciprocating or centrifugal designed for low suction temperatureSuction temperature range, materials for low temperature, liquid carry-over
Instrument and utility airOrdinary compressed air for valves and purgesOil-free or oil-injected screw with dryersReliability and dryness; often overlooked but plant-critical

The first engineering task is therefore to draw the process flow diagram and mark, for each compressor, where the gas comes from, what state it is in at the suction flange and where it goes next. Two machines on the same site can be completely different services.

What the enquiry must define

A request for “a compressor for our cryogenic plant” cannot be priced or engineered safely. The process designer or licensor needs to supply, for each duty:

  • The actual gas or mixture, with composition range, molecular weight, moisture, and any oxygen, hydrocarbon, hydrogen or corrosive content.
  • Suction and discharge pressures in absolute terms at the compressor flanges, with the lowest credible suction pressure.
  • Suction temperature range, including cold-start and upset cases.
  • Mass flow (kg/h) for minimum, normal and peak cases, plus any recycle, warm-start, defrost or standby changeover cases.
  • Required discharge temperature limit and the cooler or downstream equipment that receives the gas.
  • Purity and contamination limits, including whether any lubricant contact is acceptable.
  • Hazardous-area classification, utilities available and the plant’s safe-state philosophy.

Where data are missing, they should be recorded as open items with a named owner, not filled with assumptions.

Absolute pressure and pressure ratio

Compressor performance depends on absolute pressures. Many process sheets give gauge pressures, and mixing the two causes serious errors. P(abs) = P(gauge) + local atmospheric pressure.

Example: a duty lists suction at 0.30 bar g (about 4.4 psig) and discharge at 5.30 bar g (76.9 psig), with 1.00 bar atmospheric pressure assumed. Absolute suction is 1.30 bar a and absolute discharge 6.30 bar a, so the pressure ratio is 6.30 / 1.30 = 4.85. Dividing the gauge figures (5.30 / 0.30) would give 17.7, a completely different machine. At inland sites in Telangana the local barometric pressure is noticeably below sea level, which should be taken from the site, not assumed.

Mass flow versus actual suction volume

Process plants specify mass flow; compressor makers size on actual inlet volume. For screening, Q(actual) = ṁ × R × T / P, with R the gas’s specific constant, T in kelvin and P absolute.

Example: nitrogen (R ≈ 296.8 J/(kg·K)) at 500 kg/h, 300 K and 1.50 bar a gives (500 / 3,600) × 296.8 × 300 / 150,000 ≈ 0.082 m³/s, about 297 m³/h actual. If suction falls to 1.20 bar a at the same temperature, the actual volume rises to about 371 m³/h, an increase of 25%. The low-suction-pressure case often governs machine size.

Normal or standard volumes (Nm³/h) are useful for process balances but must state the reference temperature, pressure and moisture basis. The contract should say clearly whether acceptance is on mass throughput, normal volume or actual suction capacity.

These ideal-gas equations are unit checks. Near condensation, at high pressure, or with mixtures, the real-gas compressibility factor Z and a validated property model are needed, and the compressor maker’s own calculation governs.

Choosing the compressor technology

TechnologyStrengthsPoints to verify for cryogenic-plant service
Centrifugal (integrally geared or multi-stage)High flow, oil-free gas path, continuous dutySurge and choke margin across all cases, anti-surge control, inlet guide vanes, intercooler performance
Reciprocating (lubricated or non-lubricated)High pressure ratios, wide range of gasesPulsation, valve life, rod packing leakage, oil-free design for oxygen or high-purity service
DiaphragmHermetic gas path, very high purity, toxic or valuable gasesLimited flow, diaphragm integrity monitoring, cooling
Oil-injected screwRobust, simple for air and some process gasesOil contact with gas, oil separation, gas solubility in oil; not used for oxygen
Oil-free screwOil-free gas path for air and some gasesStage temperature limits, seal design, gas compatibility

An industrial air compressor data sheet is not evidence that a machine is suitable for oxygen, hydrogen, hydrocarbon or cold boil-off gas. Those services need the maker’s specific gas-service confirmation, materials and seal design. Oxygen service in particular needs specialist cleaning and compatible materials, following the gas-specific codes and the maker’s design rules.

Cold piping, liquids and protection

Even a warm compressor can be connected to cold piping. Thermal contraction, flange loads, support positions and insulation terminations must be checked over the full cycle, including cool-down and warm-up. Steel that is tough at ambient temperature can become brittle at low temperature, so minimum design metal temperature matters wherever cold gas can reach.

Liquid is the enemy of most compressors. Cryogenic droplets, condensed hydrocarbons, water, ice or solid carbon dioxide can damage valves and rotors. Suction knock-out vessels, liquid detection, heating where specified and a clear shutdown response protect the machine. “Dry gas duty” on a data sheet must be backed by evidence that the plant actually delivers dry gas in start-up and upset cases.

  • Seals: define the seal type, buffer or barrier gas, vent destination and acceptable leakage.
  • Pressure protection: deadhead, blocked discharge, reverse flow and trapped cold liquid warming up are all credible overpressure sources, and relief design belongs to the process safety authority.
  • Check valves: confirm their location so downstream storage cannot drive reverse flow or reverse rotation after a trip.
  • Safe state: define what the compressor does on loss of cooling, seal gas, power or instrument air.

Standby, redundancy and restart

State the redundancy honestly. If two machines are both needed at peak demand, the system is not N+1 at peak. If a 700 kg/h machine serves a 650 kg/h peak, the nominal margin is under 8% before allowing for warm, low-pressure suction conditions. A standby machine must be tested along its whole path, including cooling, seal gas, controls and power, and shared utilities such as one cooling-water valve are a common-cause weakness.

Restart after a cold-box trip deserves its own procedure. Residual cold inventory, uncertain suction phase and seal-gas pressure must be confirmed before a compressor is restarted. That procedure is written by the process authority and the compressor maker together.

How Reddy Compressors helps

Reddy Compressors is an independent multi-brand compressor specialist at Tarnaka, Secunderabad, serving industry since 2002. We sell new and used/refurbished gas compressors (CNG, nitrogen, process gas and booster duties), centrifugal compressors and the air compressors that support cryogenic plants, rent them, service them and supply their spares. For axial compressors we provide service and spares. We are not an authorised dealer of any brand, and we do not design cold boxes, liquefiers or plant safety systems. We have tie-ups with all major and reputed brands.

  • We help you prepare a complete compressor enquiry: gas data, absolute pressures, mass flow cases and interface boundaries.
  • We supply and service the warm-end machines: main air compressors, nitrogen boosters, product compressors and instrument-air packages with dryers.
  • Our 20+ service engineers and technicians cover Telangana and Andhra Pradesh, and we supply machines and spares across India.
  • Rental compressors from our own fleet, including oil-free air, can support shutdowns, commissioning and breakdowns where the duty allows.

Oxygen, hydrogen and toxic-gas duties still follow the gas-specific codes and the maker’s design rules, and we work within them.

What to send us

  • Process flow diagram or sketch showing where the compressor sits.
  • Gas name and composition range, with moisture and contaminant limits.
  • Absolute suction and discharge pressures and temperatures for each case.
  • Mass flow at minimum, normal and peak, and any recycle or start-up cases.
  • Existing machine nameplate photo and service history, if replacing or repairing.
  • Site location, utilities available and hazardous-area classification.

Frequently asked questions

What type of compressor is used in an air separation plant?

The main air compressor in a medium or large air separation unit is usually a multi-stage or integrally geared centrifugal machine, because it handles high, steady flows with an oil-free gas path. Smaller plants may use oil-free or oil-injected screw compressors with suitable purification. Product gases such as nitrogen or oxygen may then be raised to delivery pressure by separate reciprocating, centrifugal or diaphragm boosters chosen for that gas.

Does a compressor in a cryogenic plant handle cryogenic gas?

Usually not. Most compressors in cryogenic plants work on warm gas, before cooling or after the gas has been warmed in heat exchangers. Boil-off gas recovery is a notable exception, where vapour may reach the compressor very cold unless it is warmed first. The suction flange temperature, not the plant’s name, decides the materials and machine design needed.

Why must compressor pressures be given in absolute terms?

Pressure ratio, density and machine capacity all depend on absolute pressure. A suction of 0.3 bar g and discharge of 5.3 bar g is a ratio of about 4.85 in absolute terms, while dividing the gauge figures wrongly suggests 17.7. Stating absolute pressures, with the local barometric pressure used, removes this error and lets the maker size the machine correctly.

Can an oil-injected screw compressor be used for nitrogen boosting?

For many nitrogen booster duties, yes, provided the purity requirement allows for the oil carry-over that remains after separation and filtration, and the machine is designed for nitrogen service. Where very high purity is required, an oil-free reciprocating or diaphragm machine is often preferred. Oil-injected compressors are not used for oxygen service because of fire risk.

Why does the low suction pressure case often govern compressor size?

For a fixed mass flow, lower suction pressure means lower gas density and therefore more actual volume entering the compressor. Dropping from 1.5 to 1.2 bar a increases the actual suction volume by about a quarter. The machine must be sized for the worst credible suction case, and the pressure ratio also rises, which increases power and discharge temperature.

What causes high discharge temperature on a gas booster compressor?

Common causes are a higher pressure ratio than designed, often from low suction pressure, fouled or under-performing intercoolers, high cooling-water temperature, leaking valves on reciprocating machines that recompress hot gas, or a gas with a higher heat capacity ratio than assumed. Check absolute pressures, cooler approach temperatures and valve condition before changing settings, and keep within the maker’s limits.

Calculators and worked examples

These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.

Absolute pressure ratio and actual suction volume

Convert gauge pressures with the site barometric pressure, get the true pressure ratio, and turn a mass flow into actual suction volume, including the low-suction-pressure case that often sizes the machine.

The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.

Worked example

Inputs
  • Suction pressure (in the unit below): 0.3
  • Suction pressure unit: bar g
  • Discharge pressure (in the unit below): 5.3
  • Discharge pressure unit: bar g
  • Site atmospheric pressure (bar a; for gauge entries): 1
  • Gas: Nitrogen (k 1.40, MW 28)
  • Other gas: k = cp/cv (used only for Other): 1.3
  • Other gas: molecular weight (kg/kmol; used only for Other): 17
  • Suction temperature (°C): 26.85
  • Number of stages (screening, equal ratio): 1
  • Stage ratio for the temperature check (0 = equal split): 0
  • Isentropic efficiency (%; 100 = ideal): 100
  • Maximum allowable discharge temperature (°C; 0 = not checked): 0
  • Mass flow (kg/h; 0 = not used): 500
  • Compressibility factor Z at suction (1 = ideal gas): 1
  • Running hours for the transferred mass (h; 0 = not used): 0
  • Lowest credible suction pressure (same unit as suction; equal to suction = no comparison): 0.2
Result
  • Suction, absolute: 1.3 bar a (0.3 bar g, 18.9 psia)
  • Discharge, absolute: 6.3 bar a (5.3 bar g, 76.9 psig)
  • Overall pressure ratio: 4.846 absolute discharge ÷ absolute suction
  • Ratio if gauge figures were divided (wrong): 17.67 gauge ÷ gauge in the same unit; shown only to show the error
  • Equal stage ratio: 4.846 over 1 stage
  • Exponent (k − 1)/k: 0.286 k = 1.4 for nitrogen; R = 296.8 J/(kg·K)
  • Ideal discharge temperature per stage: 197.8 °C (470.9 K) at a stage ratio of 4.846, suction 26.9 °C
  • Actual suction volume: 342.5 m³/h (5.708 m³/min, 201.6 acfm) at 1.3 bar a, Z = 1
  • Normal volume: 400.1 Nm³/h (0 °C, 1.013 bar a; density 1.2498 kg/Nm³)
  • Comparison case: suction 1.2 bar a: 5.25 overall ratio; stage ratio 5.25, discharge about 209 °C, actual suction volume 371 m³/h (+8.3%)

Method. P(abs) = P(gauge) + site atmospheric pressure. Overall ratio r = P₂(abs) ÷ P₁(abs); dividing gauge figures gives a wrong ratio, worst at low suction pressure. Equal split: stage ratio = r^(1/n); interstage pressure after stage i = P₁ × (stage ratio)^i. Ideal (isentropic) discharge temperature T₂ = T₁ × (stage ratio)^((k−1)/k), kelvin, assuming intercooling back to the suction temperature before every stage; with an isentropic efficiency η, T₂ = T₁ + (T₂ideal − T₁) ÷ η. Gas constant R = 8,314.46 ÷ molecular weight. Actual suction volume = ṁ × Z × R × T₁ ÷ P₁; normal volume uses 0 °C and 1.01325 bar a with Z = 1. Transferred mass = mass flow × running hours. Rounded textbook k values near ambient; real-gas Z and the maker’s calculation for the actual composition govern. These are screening values, not equipment ratings or settings.

What to take from it. Always work in absolute pressure, and check the lowest credible suction pressure: it gives the highest ratio and discharge temperature and the largest actual suction volume for the same mass flow.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.